Kingston Ash Slide
Photos
Aerial Views of Site
Photography Slide Shows
07/31/2009 Recovery Continues
07/26/2009 Weekly Report Photos (PDF)
07/02/09 Loading ash into rail cars
06/02/2009 Rail spur construction
04/30/09 Recovery continues
04/08/2009 Dredging operation continues
03/20/2009 Dredging operation begins
02/25/2009 Aerial and ground photos of ash removal dike construction and contstruction of the temporary ash storage facility
02/17/2009 Dike and road construction
02/09/2009 Aerial and ground photos of cleanup and water sampling
01/12/2009 Getting ready for dike 2 and cenosphere collection
01/09/2009 Debris removal and the seeding operation
01/08/2009 Clean-up and railroad construction
01/04/2009 Seeding, cenosphere pick-up and road and rail work
01/03/2009 Recovery pictures with focus on road and rail
12/31/2008 Aerials and initial clean-up of site and cenospheres