spacer
Kauai Test Facility

Payload Preparation

Sandia Home
Networking Capabilities | Telemetry Receiving and Recording | Communications | Meteorological Measurement System | Launchers | Motor Assembly Facilities | Payload Preparation | Photometrics | KTF Site Map
 
 
Preparing and testing a payload for a flight test
The payload preparation and checkout area assets may be patched to other KTF facilities (such as the Launch Operations Building, other assembly buildings, or the launchers) for receiving telemetry, generating control commands, and enabling launch vehicle arming and firing. Single-axis air bearings are also available for checking out attitude control systems (ACSs).



Checkout and Control

  • Communications
  • Work benches
  • Hand tools
  • Two-ton electric hoist
  • Two 20 ft x 40 ft areas assembly bays


Back to top of page
Networking Capabilities | Telemetry Receiving and Recording | Communications | Meteorological Measurement System | Launchers | Motor Assembly Facilities | Payload Preparation | Photometrics | KTF Site Map

© Sandia Corporation | Al Lopez (505) 845-8783 | Site Map | Privacy and Security