About DOE Button Organization Button News Button Contact Us Button
US Department of Energy Seal and Header Photo
Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button
Office of Environmental Management
  You are here: Skip Navigation LinksEM Home > Projects

Office of Environmental Management
Projects

DOE Office of Environmental Management Projects Page

A view of the Waste Isolation Pilot Plant from a distance.

Previous Button Play Button Stop Button Next Button
EM manages its work at individual sites as a series of projects. EM projects are tasked with solving the large scale, technically challenging risks and hazardous conditions posed by the world’s largest nuclear cleanup. These nuclear cleanup activities are located at 21 sites covering more than two million acres in 13 states, and employing more than 30,000 Federal and contractor employees, including scientists, engineers and hazardous waste technicians. (The Waste Isolation Treatment Plant (WIPP) Exit EM Website safely disposes of the nation's defense-related transuranic radioactive waste. Total loaded miles traveled as of 11/30/08: 8,305,650 with a total of waste disposed 57,872m3.)

As of Fiscal Year 2009, EM’s portfolio consists of 14 construction projects and 62 clean up projects with a Life Cycle Cost range from $205 to 260 billion. EM projects Adobe PDF Document are managed in accordance with the priorities of DOE Order 413.3A Adobe PDF Document Exit EM's web site, Program and Project Management for the Acquisition of Capital Assets.

Success in project management was proven at Rocky Flats Exit EM's web site (2006) and Fernald Exit EM's web site (2007) which received the Project Management Institute (PMI) Project of the Year.

  • Each project has a "baseline" that clearly documents the scope of work to be completed, the estimated cost, and the schedule by which various aspects of the project will be completed. Click here for EM Project Baseline Summaries.
  • The baseline can be viewed as an acceptable point from which to track and control future changes throughout the duration of a project. EM monitors the actual progression of its projects on a regular basis against these project baselines.
  • Project management personnel assist in the successful execution of projects by means of consultation, independent project reviews, quarterly project reviews and monthly project reviews and reporting. The project documents are kept under configuration management throughout the duration of the project.
  • An approved near-term baseline reflects the identified scope of work that can reasonably be accomplished for an identified cost in an identified time period. The near-term period of the baseline typically coincides with the current contract period, which is generally five years.
  • EM’s environmental cleanup projects often extend beyond the near-term, which is why EM also develops out-year planning estimates (ranges of cost and schedule).
  • Completing projects within the parameters of the baseline depends on adequate funding and the availability of contingency funds during project execution.

Enterprise

EM has undertaken an assessment of project management software systems within the Office of Environmental Management. The goal is to develop and implement a common platform and language for accurately communicating project management and project performance information in a consistent manner. This integrated effort throughout the complex will implement the corporate use of the Dekker Project Management Information System, an Earned Value (EV) and portfolio management software tool. This project will ensure project and site data are available to allow for a variety of project analyses. The implementation is scheduled for completion by the end of 2009. Please click the headers below to expand the section.

Risk Management

The Department’s risk management concept is based on the principles that risk management must be analytical, forward-looking, structured, informative, and continuous.
(More...)

Lessons Learned

The Office of Environmental Management (EM) expects all individuals performing EM work to make decisions and execute their work based on the best available information, founded on the best professional and industrial practices currently available.
(More...)
RECENT NEWS
Small Box Arrow EM Projects Completed 2005-2009 Adobe PDF Document
Small Box Arrow Awards

EM RESOURCES
Small Box Arrow Project and Contract Management Improvement Timeline Adobe PDF Document
Small Box Arrow DOE Directives
Small Box Arrow Project Definition Rating Index (PDRI)
Small Box Arrow Environmental Management Clean-up Project Guide (DOE G 413.3-8) Adobe PDF Document Exit EM's web site

OTHER RESOURCES
Small Box Arrow 12/2007 - National Academy of Public Administration (NAPA) - Managing America’s Defense Nuclear Waste Report Adobe PDF Document Exit EM's web site
Small Box Arrow 12/2007 - NAPA - Managing America’s Defense Nuclear Waste Appendices Adobe PDF Document Exit EM's web site
Small Box Arrow Project Management Institute (PMI) Exit EM's web site
Small Box Arrow Construction Industry Institute (CII) Exit EM's web site
Small Box Arrow 04/2008 - Root Cause Analysis Report Adobe PDF Document Exit EM's web site
Small Box Arrow 07/2008 - Root Cause Analysis Corrective Action Plan Adobe PDF Document Exit EM's web site
Small Box Arrow Federal Project Director Certification Guidance (OECM) Exit EM's web site
Small Box Arrow OECM Project Management Policy and Guidance per Office of Management  Exit EM's web site

Last Updated 5/13/2009
The White House FirstGov.gov E-gov IQ FOIA Link: Privacy Program
U.S. Department of Energy | 1000 Independence Ave., SW | Washington, DC 20585
1-800-dial-DOE | f/202-586-4403

Web Policies | No Fear Act | Site Map | Privacy | Phone Book | Employment