Federal Register Notice, November 19, 2008 regarding proposed Consent Decree (PDF) (1 p., 198 KB)

Proposed Consent Decree (PDF) (23 pp., 1.7 MB)


Members of the public have asked where to find the September 2008 National Pollutant Discharge Elimination System ("NPDES") permit issued by EPA Region 1. A link to that document is at: http://www.epa.gov/region01/npdes/permits_listing_ma.html. Scroll down the page and click on the following permit: Pittsfield (Housatonic River), General Electric Company (PDF) (24 pp., 77 KB), September 30, 2008

The NPDES permit is under a separate EPA program, and is not being implemented as part of the work for the GE-Pittsfield/Housatonic River Site.

There will be a public meeting on Monday, October 27 at 6:30 p.m. at EPA/Weston Solutions, Inc., 10 Lyman Street Suite 2, Pittsfield, MA so that members of the public can discuss the terms of the permit and the appeals process with a member of EPA's NPDES Permitting staff.

Jim Murphy
United States Environmental Protection Agency
New England - Region 1
Office of the Regional Administrator
1 Congress Street Suite 1100 (RAA)
Boston, MA 02114-2023
617-918-1028 (phone)
617-918-0028 (fax)

What's New in the Repositories

Web Site Additions:

You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more about PDF, and for a link to the free Acrobat Reader.

May 6, 2009 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area II

Letter from Fisher (USEPA) to Gates (GE), April 28, 2009, Re: Conditional Approval of General Electric's April 14, 2009 submittal titled Newell Street Area II, Third Addendum to Final Removal Design/Removal Action Work Plan (PDF) (2 pp., 25 KB)

May 6, 2009 - addition(s) to Allendale - Reports

EPA Allendale School PCB Air Sampling Results, through March 2009 (PDF) (1 p., 15 KB)

May 6, 2009 - addition(s) to OPCA - Reports

OPCA PCB Ambient Air Sampling Results

Comparison of EPA and GE OPCA Replicated Air Sampling results for 2009 (PDF) (1 p., 15 KB)

April 27, 2009 - addition(s) to GE Plant Area - Reports

East Street Area 2 - South

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), April 21, 2009, Re: East Street Area 2-South Second Addendum to Conceptual Removal Design/Removal Action Work Plan (PDF) (482 pp., 38.91 MB)

April 27, 2009 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area II

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), April 14, 2009, Re: Newel Street Area II Third Addendum to Final Removal Design/Removal Action Work Plan (PDF) (45 pp., 2.54 MB)

April 24, 2009 - addition(s) to Silver Lake - Reports

Silver Lake Sediment

General Electric Revised Conceptual Removal Design/Removal Action Work Plan For Silver Lake Sediments, Originally Submitted July 2008, Revised April 2009 (PDF) (89 pp., 9.65 MB)

April 17, 2009 - addition(s) to General - Reports

CD Monthly Status Reports - 2009

March 2009 (PDF) (923 pp., 7.06 MB)

April 17, 2009 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter from Fisher (USEPA) to Gates (GE), April 8, 2009, Re: Conditional Approval of General Electric's January 31, 2009 submittal titled Plant Site 1 Groundwater Management Area, Groundwater Quality Monitoring Interim Report for Fall 2008 (PDF) (3 pp., 32 KB)

GMA - 2, Oxbow Areas J and K

Letter from Fisher (USEPA) to Gates (GE), April 8, 2009, Re: Conditional Approval of General Electrics"s February 6, 2009 submittal titled Groundwater Management Area 2, Long-Term Monitoring Program Monitoring Event Evaluation Report for Fall 2008 (PDF) (3 pp., 32 KB)

GMA - 3, Unkamet Brook Area

Letter from Fisher (USEPA) to Gates (GE), April 8, 2009, Re: Conditional Approval of General Electric's February 27, 2009 submittal titled Groundwater Management Area 3, Groundwater Quality and NAPL Monitoring Interim Report for Fall 2008 (PDF) (3 pp., 86 KB)

GMA - 5, Oxbow Areas A and C

Letter from Fisher (USEPA) to Gates (GE), April 8, 2009, Re: Conditional Approval of General Electric's February 13, 2009 submittal titled Groundwater Management Area 5, Long-Term Monitoring Program Monitoring Event Evaluation Report for Fall 2008 (PDF) (3 pp., 87 KB)

April 16, 2009 - addition(s) to Rest of River - Reports

Corrective Measures Study - Related Correspondence

Letter from Svirsky (USEPA) to Silfer (GE), April 14, 2009, Re: GE-Pittsfield/Housatonic River Site: Rest of River Corrective Measures Study: Submittal of an Addendum to the CMS Proposal (PDF) (4 pp., 40 KB)

Letter from McLaren (GE) to Conway (USEPA), April 10, 2009, Re: Additional Rest of River Corrective Measures Study Sediment Alternative Proposed by EPA and the GE Draft Work Plan for an Additional Alternative (PDF) (2 pp., 98 KB)

April 9, 2009 - addition(s) to Housatonic River ½ Mile - Reports

Annual Monitoring Reports

Letter from Tagliaferro (USEPA) to Silfer (GE), April 6, 2009, Re: Conditional Approval of GE's 2008 Annual Monitoring Report Upper 1/2-Mile Reach of the Housatonic GE-Pittsfield/Housatonic River Site (PDF) (3 pp., 28 KB)

April 7, 2009 - addition(s) to Rest of River - Reports

Corrective Measures Study - Related Correspondence

Letter from Svirsky (USEPA) to Silfer (GE), April 1, 2009, Re: GE-Pittsfield/Housatonic River Site: Addendum to the Corrective Measures Study (CMS) Proposal and Subsequent Submittal of a Revised CMS (PDF) (4 pp., 141 KB)

April 3, 2009 - addition(s) to GE Plant Area - Reports

Unkamet Brook Area

Letter (with report) from Gates (GE) to Svirsky (USEPA), March 26, 2009, Re: Unkamet Brook Area Conceptual Removal Design/Removal Action Work Plan for Unkamet Brook Area-Remainder

March 31, 2009 - addition(s) to GE Plant Area - Reports

Unkamet Brook Area

Immediate Response Action (IRA) Completion Statement attached to letter from Bowan (GE) to Slowich (MADEP), October 17, 1994 (PDF) (91 pp., 3.54 MB)

March 24, 2009 - addition(s) to GE Plant Area - Reports

Unkamet Brook Area

Letter (with attachments) from Gates (GE) to Svirsky (USEPA), March 16, 2009, Re: Unkamet Brook Area, December 2008 Supplemental Investigations Data Summary (PDF) (62 pp., 1.44 MB)

March 17, 2009 - addition(s) to General - Reports

CD Monthly Status Reports - 2009

February 2009 (PDF) (423 pp., 3.62 MB)

March 12, 2009 - addition(s) to Silver Lake - Reports

Soils Adjacent to the Silver Lake

Letter from Fisher (USEPA) to Gates (GE), March 4, 2009, Re: Conditional Approval of General Electric's October 22, 2008 submittal titled Revised Conceptual Removal Design/Removal Action Work Plan for Soils Adjacent to Silver Lake (PDF) (6 pp., 44 KB)

March 10, 2009 - addition(s) to Rest of River - Reports

Corrective Measures Study - Related Correspondence

Letter (with enclosure) from Silfer (GE) to Svirsky (USEPA), March 6, 2009, Re: Rest of River; Response to EPA's Interim Comments on Corrective Measures Study Report (PDF) (292 pp., 2.11 MB)

Letter from Klee (GE) to Leighton (USEPA), February 25, 2009, Re: Rest of River; Corrective Measures Study Supplement (PDF) (2 pp., 517 KB)

March 10, 2009 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter (with report) from Gates (GE) to Fisher (USEPA), February 27, 2009, Re: Groundwater Management Area 1 NAPL Monitoring Report for Fall 2008 (PDF) (337 pp., 20.74 MB)

GMA - 3, Unkamet Brook Area

Letter (with report) from Gates (GE) to Tagliaferro (USEPA), February 27, 2009, Re: Groundwater Management Area 3 Groundwater Quality and NAPL Monitoring Interim Report for Fall 2008 (PDF) (227 pp., 3.15 MB)

GMA - 4, Hill 78 Area

Letter (with report) from Gates (GE) to Fisher (USEPA), February 27, 2009, Re: Groundwater Management Area 4 Groundwater Quality Monitoring Interim Report for Fall 2008 (PDF) (208 pp., 5.35 MB)

March 10, 2009 - addition(s) to OPCA - Reports

OPCA PCB Ambient Air Sampling Results

PCB Air Sampling Results for 2008 (PDF) (1 p., 26 KB)

Comparison of EPA and GE OPCA Replicated Air Sampling Results for 2008 (PDF) (1 p., 22 KB)

March 9, 2009 - addition(s) to Silver Lake - Reports

Silver Lake Sediment

Letter (with attachment) from Svirsky (USEPA) to Silfer (GE) March 2, 2009, Re: Condtional Approval of GE's Conceptual Removal Design/Removal Action Work Plan for Silver Lake Sediments (PDF) (11 pp., 254 KB)

March 9, 2009 - addition(s) to Rest of River - Reports

Corrective Measures Study - Related Correspondence

Letter (with enclosure) from Mooney (GE) to Svirsky (USEPA), March 5, 2009, Re: Rest of River; Response to EPA's Comments on the Phase 1 Cultural Resources Assessment - Public Release Version (PDF) (7 pp., 1.35 MB)

March 9, 2009 - addition(s) to GE Plant Area - Reports

Unkamet Brook Area

Letter (with report) from Phillips (GE) to Slowick (MADEP), July 30 1996, Re: Appendix B (Magnetometer Survery) of OP-3 Immediate Response Action Plan Completion Statement (PDF) (11 pp., 308 KB)

Letter (with enclosure) from Phillips (GE) to Slowick (MADEP), July 26, 1996, Re: Immediate Response Action Plan Completion Statement (PDF) (152 pp., 5.40 MB)

February 24, 2009 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area I

Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Steenstrup (MADEP), December 18, 2008, Re: Newell Street Area I Summary of 2008 Conditional Solution Inspection Activities (PDF) (14 pp., 289 KB)

Newell Street Area II

Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Steenstrup (MADEP), December 18, 2008, Re: Newell Street Area II Summary of 2008 Conditional Solution Inspection Activities (PDF) (8 pp., 283 KB)

Former Filled Oxbows A and C

Letter (with attachments) from Gates (GE) to Fisher (USEPA) and Steenstrup (MADEP), December 18, 2008, Re: Former Oxbow Areas A and C Summary of 2008 Conditional Solution Inspection Activities (PDF) (10 pp., 280 KB)

February 24, 2009 - addition(s) to General - Reports

CD Monthly Status Reports - 2009

January 2009 (PDF) (617 pp., 4.63 MB)

February 24, 2009 - addition(s) to GE Plant Area - Reports

20s, 30s, and 40s Complexes

Semi-Annual Inspection Building Demolition Barrier Areas November 2008, 20s and 30s Complexes William Stanley Business Park, report prepared for Pittsfield Economic Development Authority by O'Reilly, Talbot & Okun Associates, Inc. November 21, 2008 (PDF) (26 pp., 11.70 MB)

Unkamet Brook Area

Letter (with report) from Gates (GE) to Fisher (USEPA) , February 12, 2009, Re: Unkamet Brook Area Conceptual Removal Design/Removal Action Work Plan for Unkamet Brook Area-West (PDF) (156 pp., 5.78 MB)

February 24, 2009 - addition(s) to Housatonic River 1½ Mile - Reports

General

2008 Annual Monitoring Report, January 30, 2009 (PDF) (58 pp., 23.92 MB)

February 24, 2009 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter (with report) from Gates (GE) to Fisher (USEPA), January 30, 2009, Re: Groundwater Management Area 1 Groundwater Quality Monitoring Interim Report for Fall 2008 (PDF) (146 pp., 6.39 MB)

GMA - 2, Oxbow Areas J and K

Letter (with report) from Gates (GE) to Tagliaferro (USEPA), February 6, 2009, Re: Groundwater Management Area 2 Long-Term Monitoring Program Monitoring Event Evaluation Report for Fall 2008 (PDF) (84 pp., 1.87 MB)

GMA - 5, Oxbow Areas A and C

Letter (with report) from Gates (GE) to Fisher (USEPA), February 13, 2009, Re: Groundwater Management Area 5 Long-Term Monitoring Program Monitoring Event Evaluation Report for Fall 2008 (PDF) (127 pp., 6.70 MB)

February 23, 2009 - addition(s) to Allendale - Reports

EPA Allendale School PCB Air Sample Results, through December 2008 (PDF) (1 p., 19 KB)

February 18, 2009 - addition(s) to Rest of River - Reports

Corrective Measures Study - Related Correspondence

Letter from Leighton (USEPA) to Klee (GE), February 5, 2009, Re: Rest of River Corrective Measures Study Supplement (PDF) (2 pp., 703 KB)

Letter from Klee (GE) to Varney (USEPA), January 16, 2009, Re: Rest of River Corrective Measures Study Supplement (PDF) (2 pp., 394 KB)

General

Letter from Owens (USEPA) to Bowles (MAEEOA), February 5, 2009, Re: Upper Housatonic River Area of Critical Environmental Concern (PDF) (5 pp., 256 KB)

February 3, 2009 - addition(s) to Groundwater - Reports

GMA - 4, Hill 78 Area

Letter from Fisher (USEPA) to Gates (GE), January 27, 2009, Re: EPA Conditional Approval of General Electric's August 29, 2008, submittal titled Groundwater Management Area 4 Groundwater Quality Monitoring Interim Report for Spring 2008 (PDF) (3 pp., 32 KB)

February 2, 2009 - addition(s) to Housatonic River ½ Mile - Reports

Annual Monitoring Reports

2008 Annual Monitoring Report Upper 1/2-Mile Reach of the Housatonic River, prepared by GE, January 2009 (PDF) (80 pp., 5.44 MB)

January 27, 2009 - addition(s) to GE Plant Area - Reports

Unkamet Brook Area

Memorandum from Phillips (GE) to Kurpaska (MADEP), August 29, 1996, Re: Revised OP-3 Site plan to identify the location of the individual excavations (PDF) (2 pp., 58 KB)

Immediate Response Action Plan (IRAP) Drum Removal Status Report, February 2, 1996, from GE to MADEP (PDF) (2 pp., 71 KB)

Letter from Symington (MADEP) to Ruebesam (GE), October 6, 1995, Re: Unkamet Brook Conditional Approval of Immediate Response Action (IRA) Plan (PDF) (6 pp., 325 KB)

Immediate Response Action Plan (IRAP), August 31, 1995, from GE to MADEP (PDF) (12 pp., 4.58 MB)

January 27, 2009 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area II

Letter from Fisher (USEPA) to Gates (GE), January 20, 2009, Re: Conditional Approval of General Electric's October 16, 2008 submittal titled Newell Street Area II, Second Addendum to Final Removal Design/Removal Action Work Plan (PDF) (6 pp., 2.66 MB)

January 26, 2009 - addition(s) to GE Plant Area - Reports

Unkamet Brook Area

Ground Penetrating Radar Survey, January 1995 (PDF) (94 pp., 31.56 MB)

January 20, 2009 - addition(s) to GE Plant Area - Reports

Unkamet Brook Area

Letter from Tagliaferro, (USEPA) to Gates (GE), December 30, 2008, Re: Conditional Approval of GE's December 3, 2008 submittal titled Fourth Supplement to the Pre-Design Investigation Report for Unkamet Brook Area Removal Action (PDF) (2 pp., 210 KB)

January 16, 2009 - addition(s) to General - Reports

CD Monthly Status Reports - 2008

December 2008 (PDF) (467 pp., 4.52 MB)

January 12, 2009 - addition(s) to Floodplain Properties Reports

All Floodplains Current Residential Properties Adjacent to 1 1/2 Mile Reach

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Steenstrup (MADEP), December 18, 2008, Re: Floodplain Non-Residential Properties Adjacent to 1 1/2 Mile Reach of Houstonic River Summary of 2008 Conditional Solution Inspection at Parcel I7-1-5 (PDF) (4 pp., 93 KB)

January 12, 2009 - addition(s) to Former Filled Oxbows - Reports

Lyman Street Area and Former Filled Oxbow B

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Steenstrup (MADEP), December 18, 2008, Re: Lyman Street Area Summary of 2008 Conditional Solution Inspection Activities (PDF) (14 pp., 114 KB)

Newell Street Area I

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Steenstrup (MADEP), December 18, 2008, Re: Newell Street Area I Summary of Annual ERE Inspection for Parcels J9-23-24 and J9-23-26 (PDF) (6 pp., 105 KB)

January 12, 2009 - addition(s) to GE Plant Area - Reports

East Street Area 1 - North

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA) and Steenstrup (MADEP), December 18, 2008, Re: East Street Area 1-North Summary of 2008 Conditional Solution Inspection Activities (PDF) (6 pp., 83 KB)

December 22, 2008 - addition(s) to GE Plant Area - Reports

Unkamet Brook Area

MCP Supplemental Phase 2 Scope of Work and Proposal for RCRA Facility Investigation of Unkamet Brook Area, USEPA Area 1, January 1995 (PDF) (119 pp., 31.48 MB)

December 17, 2008 - addition(s) to General - Reports

CD Monthly Status Reports - 2008

November 2008 (PDF) (683 pp., 4.55 MB)

December 17, 2008 - addition(s) to GE Plant Area - Reports

East Street Area 2 - North

Letter (with enclosures) from Gates (GE) to Hull (USEPA), December 5, 2008, Re: East Street Area 2-North Removal Action Area Unpaved Area East of Building 100 (PDF) (3 pp., 425 KB)

Unkamet Brook Area

Letter (with attachments) from Gates (GE) to Svirsky (USEPA), December 3, 2008, Re: Unkamet Brook Area Fourth Supplement to the Pre-Design Investigation Report for the Unkamet Brook Area Removal Action (PDF) (6 pp., 1.26 MB)

December 3, 2008 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter from Fisher (USEPA) to Gates (GE), November 25, 2008, Re: Conditional Approval of General Electric's August 29, 2008 submittal titled Groundwater Management Area 1, NAPL Monitoring Report for Spring 2008 (PDF) (3 pp., 44 KB)

Letter from Fisher (USEPA) to Gates (GE), November 25, 2008, Re: Conditional Approval of General Electric's July 30, 2008 submittal titled Plant Site 1 Groundwater Management Area, Groundwater Quality Monitoring Interim Report for Spring 2008 (PDF) (3 pp., 43 KB)

December 2, 2008 - addition(s) to General - Reports

CD Monthly Status Reports - 2008

October 2008 (PDF) (843 pp., 4.59 MB)

December 1, 2008 - addition(s) to GE Plant Area - Reports

East Street Area 1 - North

Letter from Michael Carroll (GE) to the property owner of Parcel K-10-14-1, April 2, 2004; Re: Conditional Solution Notification (PDF) (5 pp., 660 KB)

December 1, 2008 - addition(s) to Allendale - Reports

EPA Allendale School PCB Air Sample Results, Last Updated November 2008 (PDF) (1 p., 18 KB)

December 1, 2008 - addition(s) to GE Plant Area - Reports

Hill 78 Area - Remainder

Letter from Hull (USEPA) to Gates (GE), November 12, 2008, Re: Conditional Approval of General Electric's November 4, 2008, submittal titled Hill 78 Area-Remainder Removal Action Area Supplemental Information Package (PDF) (2 pp., 23 KB)

December 1, 2008 - addition(s) to Rest of River - Reports

Corrective Measures Study - Related Correspondence

Letter from Svirsky (USEPA) to Silfer (GE), November 20, 2008, Re: EPA's Response to General Electric's Request for Extension on the Corrective Measures Study (PDF) (2 pp., 197 KB)

Letter from Silfer (GE) to Svirsky (USEPA), November 5, 2008, Re: Rest of River Time For Submission of Corrective Measures Study Supplement (PDF) (4 pp., 205 KB)

November 28, 2008 - addition(s) to Former Filled Oxbows - Reports

Former Filled Oxbows A and C

Pollution Report (POLREP) # 2 and Final - Former Oxbow Areas A and C Removal Action Area (RAA), July 18, 2008 (PDF) (5 pp., 231 KB)

Newell Street Area I

Pollution Report (POLREP) # 2 and Final - Newell Street Area 1 Removal Action Area (RAA), August 27, 2008 (PDF) (5 pp., 274 KB)

Former Filled Oxbows J and K

Pollution Report (POLREP) # 2 and Final - Former Oxbow Areas J & K Removal Action Area (RAA), July 21, 2008 (PDF) (6 pp., 222 KB)

November 10, 2008 - addition(s) to GE Plant Area - Reports

Hill 78 Area - Remainder

Letter (with attachments) from Gates (GE) to Hull (USEPA), November 4, 2008, Re: Hill 78 Area-Remainder Removal Action Area Supplemental Information Package (PDF) (127 pp., 3.14 MB)

November 10, 2008 - addition(s) to Housatonic River ½ Mile - Reports

General Reports

Letter (with attachments) from Silfer (GE) to Young (MEOEEA), October 30, 2008, Re: Upper 1/2-Mile Reach of the Housatonic River Completion of Installation of Restoration Work Report (PDF) (7 pp., 2.06 MB)

November 10, 2008 - addition(s) to GE Plant Area - Reports

Hill 78 Area - Remainder

Letter from Gates (GE) to Hull (USEPA), November 3, 2008, Re: Hill 78 Area - Remainder Response to EPA's October 28, 2008 Conditional Approval Letter (PDF) (2 pp., 260 KB)

Unkamet Brook Area

Letter from Hull (USEPA) to Gates (GE), November 4, 2008, Re: Conditional Approval of GE'S July 29, 2008 submittal titled Third Supplement to the Pre-Design Investigation Report for Unkamet Brook Area Removal Action and GE's September 12, 2008 submittal titled Scope of Supplemental Investigations and Status Update (PDF) (3 pp., 38 KB)

November 5, 2008 - addition(s) to Rest of River - Reports

Corrective Measures Study - Related Correspondence

Letter from Silfer (GE) to Svirsky (USEPA), October 31, 2008, Re: Rest of River Response to EPA's Specific Comment 52 on Corrective Measures Study Report (PDF) (9 pp., 2.06 MB)

Letter (with attachments) from Svirsky (USEPA) to Silfer (GE), October 30, 2008, Re: Direction on EPA's Specific Comment 42 on GE's March 2008 Corrective Measures Study (PDF) (12 pp., 93.64 MB)

November 4, 2008 - addition(s) to Silver Lake - Reports

Soils Adjacent to the Silver Lake

Letter (with enclosure) from Gates (GE) to Fisher (USEPA), October 22, 2008, Re: Silver Lake Area Revised Conceptual Removal Design/Removal Action Work Plan for Soils Adjacent to Silver Lake (PDF) (1242 pp., 36.01 MB)

November 4, 2008 - addition(s) to GE Plant Area - Reports

Hill 78 Area - Remainder

Letter from Hull (USEPA) to Gates (GE), October 28, 2008, Re: Conditional Approval of General Electric's September 18, 2008, Hill 78 Area-Remainder Addendum to Final RD/RA Work Plan (PDF) (2 pp., 31 KB)

November 3, 2008 - addition(s) to Groundwater - Reports

GMA - 3, Unkamet Brook Area

Letter from Hull (USEPA) to Gates (GE), October 23, 2008, Re; EPA Conditional Approval of General Electric's August 29, 2008, submittal titled Groundwater Management Area 3 Groundwater Quality and NAPL Monitoring Interim Report for Spring 2008 (PDF) (3 pp., 29 KB)

GMA - 5, Oxbow Areas A and C

Letter from Fisher (USEPA) to Gates (GE), October 23, 2008, Re: Conditional Approval of General Electric's August 22, 2008 submittal titled Groundwater Management Area 5, Long-Term Monitoring Event Evaluation Report for Spring 2008 (PDF) (2 pp., 35 KB)

October 28, 2008 - addition(s) to Groundwater - Reports

GMA - 2, Oxbow Areas J and K

Letter from Hull (USEPA) to Gates (GE), October 22, 2008, Re; EPA Conditional Approval of General Electric's August 1, 2008 Groundwater Management Area 2 Long-Term Monitoring Program Monitoring Event Evaluation Report for Spring 2008 (PDF) (3 pp., 23 KB)

October 28, 2008 - addition(s) to Floodplain Properties Reports

Phase 4 Floodplain Properties

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 21, 2008, Re: Floodplain Residential and Non-Residential Properties Adjacent to 1 1/2 Mile Reach of Housatonic River, Summary of August/September 2008 Inspection Activities for the Group 4C Floodplain Properties (PDF) (33 pp., 1.99 MB)

October 28, 2008 - addition(s) to Housatonic River 1½ Mile - Reports

General

Letter (with attachments) from Tagliaferro (USEPA) to Mooney (GE), October 8, 2008, Re: 2008 Summer Inspection Reports,1 1/2 Mile Reach Removal Action (PDF) (5 pp., 467 KB)

October 28, 2008 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area II

Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 16, 2008, Re: Newell Street Area II Summary of September 2008 Inspection Activities (PDF) (67 pp., 897 KB)

October 28, 2008 - addition(s) to GE Plant Area - Reports

City Recreational Area

Letter (with attachments) from Gates (GE) to Fisher (USEPA), October 16, 2008, Re: East Street Area 2-South Summary of September 2008 Inspection Activities - City Recreational Area (PDF) (6 pp., 205 KB)

October 27, 2008 - addition(s) to Former Filled Oxbows - Reports

Former Filled Oxbows A and C

Letter (with attachments) from Gates (GE) to Hull (USEPA), October 16, 2008, Re: Former Oxbow Areas A and C Summary of September 2008 Inspection Activities (PDF) (20 pp., 752 KB)

Newell Street Area II

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), October 16, 2008, Re; Newell Street Area II, Second Addendum to Final Removal Design/Removal Action Work Plan (PDF) (44 pp., 1.68 MB)

October 27, 2008 - addition(s) to Housatonic River ½ Mile - Reports

Inspection Reports

Letter (with attachments) from Silfer (GE) to Tagliaferro (USEPA), October 16, 2008, Re; Upper 1/2-Mile Reach of the Housatonic River 2008 Inspection of Restored Bank Vegetation and Aquatic Habitat Enhancement Structures (PDF) (29 pp., 2.89 MB)

October 24, 2008 - addition(s) to OPCA - Reports

OPCA Reports

Letter (with attachments) from Gates (GE) to Hull (USEPA), October 16, 2008, Re: Building 71 and Hill 78 On-Plant Consolidation Areas Summary of Fall 2008 Post-Closure Inspection Activities (PDF) (13 pp., 1.16 MB)

October 21, 2008 - addition(s) to General - Reports

CD Monthly Status Reports - 2008

September 2008 (PDF) (507 pp., 7.51 MB)

October 21, 2008 - addition(s) to Housatonic River 1½ Mile - Reports

General

Spring 2008 Inspection of Vegetation Restoration, July 3, 2008 (PDF) (44 pp., 12.03 MB)

October 17, 2008 - addition(s) to GE Plant Area - Reports

East Street Area 2 - North

Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 24, 2008, Re: East Street Area 2-North Summary of August/September 2008 Inspection Activities (PDF) (7 pp., 768 KB)

October 17, 2008 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area I

Letter (with attachments) from Gates (GE) to Fisher (USEPA), September 24, 2008, Re: Newell Street Area I Summary of August 2008 Inspection Activities (PDF) (24 pp., 348 KB)

October 14, 2008 - addition(s) to Groundwater - Reports

GMA - 1

Letter from Nalipinski (USEPA) to Silfer (GE), June 20, 2003, Re: Comments on General Electric's February 2003 submittal "Plant Site 1 Groundwater Management Area NAPL Monitoringt Report for Fall 2002" (PDF) (3 pp., 712 KB)

October 6, 2008 - addition(s) to Housatonic River 1½ Mile - Reports

General

Letter (with attachments) from Mooney (GE) to Tagliaferro (USEPA), August 29, 2008, Re: 1 1/2 Mile Reach Report on 2008 Inspection of Riverbank Soil Restoration, Riprap, Aquatic Habitat Enhancement Structures and Ancillary Items (PDF) (34 pp., 2.82 MB)

September 30, 2008 - addition(s) to Former Filled Oxbows - Reports

Former Filled Oxbows J and K

Letter (with attachments) from Gates (GE) to Hull (USEPA), September 16, 2008, Re: Former Oxbow Areas J and K Summary of August 2008 Inspection Activities (PDF) (29 pp., 776 KB)

Lyman Street Area and Former Filled Oxbow B

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), September 17, 2008, Re: Lyman Street Area Summary of August 2008 Inspection Activities (PDF) (33 pp., 778 KB)

September 30, 2008 - addition(s) to GE Plant Area - Reports

30s Complex

Letter (with attachments) from Carroll (GE) to Steenstrup (MADEP) and Tagliaferro (USEPA), September 15, 2008, Re: 30s Complex Summary of Annual ERE Inspection for 2008 (PDF) (6 pp., 3.17 MB)

Hill 78 Area - Remainder

Letter (with attachments) from Gates (GE) to Hull (USEPA), September 18, 2008, Re: Hill 78 Area-Remainder Addendum to Final RD/RA work Plan (PDF) (18 pp., 1.66 MB)

September 29, 2008 - addition(s) to GE Plant Area - Reports

20s Complex

Letter (with attachments) from Carroll (GE) to Steenstrup (MADEP) and Tagliaferro (USEPA), September 15, 2008, Re: 20's Complex Summary of Annual ERE Inspection for 2008 (PDF) (4 pp., 1.35 MB)

40s Complex

Letter (with attachments) from Carroll (GE) to Tagliaferro (USEPA), September 15, 2008, Re: 40s Complex Summary of Annual Inspection of Temporary Stockpile Area (PDF) (4 pp., 1.41 MB)

September 26, 2008 - addition(s) to Silver Lake - Reports

Soils Adjacent to the Silver Lake

Letter (with attachments) from Tagliaferro (USEPA) to Gates (GE), September 23, 2008, Re: EPA Conditional Approval of General Electric's May 25, 2007 submittal titled "Conceptual Removal Design/Removal Action Work Plan for Soils Adjacent to Silver Lake" (PDF) (13 pp., 2.6 MB)

September 22, 2008 - addition(s) to GE Plant Area - Reports

Unkamet Brook Area

Letter (with attachments) from Gates (GE) to Svirsky (USEPA), September 12, 2008, Re: Unkamet Brook Area, Scope of Supplemental Investigations and Status Update (PDF) (14 pp., 1.11 MB)

September 22, 2008 - addition(s) to Floodplain Properties Reports

Phase 2 Floodplain Properties

Letter (with attachments) from Gates (GE) to Tagliaferro (USEPA), September 11, 2008, Re: Floodplain Residential and Non-Residential Properties Adjacent to 1 1/2 Mile Reach of Housatonic River, Summary of August 2008 Inspection Activities for the Remediated Phase 2 Floodplain Properties (PDF) (17 pp., 836 KB)

Phase 3 Floodplain Properties

Letter from Gates (GE) to Tagliaferro (USEPA), September 10, 2008, Re: Floodplain Residential Properties Adjacent to 1 1/2 Mile Reach of Housatonic River, Summary of August 2008 Inspection Activities for the Phase 3 Floodplain Properties (PDF) (31 pp., 473 KB)

September 16, 2008 - addition(s) to General - Reports

CD Monthly Status Reports - 2008

August 2008 (PDF) (849 pp., 8.22 MB)

September 11, 2008 - addition(s) to Housatonic River 1½ Mile - Reports

General

Letter (with enclosure) from Mooney (GE) to Tagliaferro (USEPA), August 21, 2008, Re: Summer 2008 Re-Vegetation Monitoring Report 1 1/2 Mile Reach Removal Action (PDF) (97 pp., 8.63 MB)

September 9, 2008 - addition(s) to Rest of River - Reports

Community Updates

Two Page Summary: EPA Requires GE to Revise Its Corrective Measures Study, Rest of River, September 2008 (PDF) (2 pp., 123 KB)

Corrective Measures Study - Related Correspondence

Letter (with attachments) from Owens (USEPA) to Silfer (GE), September 9, 2008, Re: EPA Comments on GE's March 2008 Corrective Measures Study Report (PDF) (2 pp., 2 MB)

September 3, 2008 - addition(s) to GE Plant Area - Reports

City Recreational Area

Letter from Steenstrup (MADEP) to Tagliaferro (USEPA), August 21, 2008, Re: East Street Area 2-South Approval of Final Completion Report for the City Recreational Area (PDF) (1 p., 236 KB)

September 5, 2008 - addition(s) to Former Filled Oxbows - Reports

Lyman Street Area and Former Filled Oxbow B

Letter (with attachments) from Gates (GE) to Young (MEOEEA), August 27, 2008, Re: Lyman Street Area Summary of July 2008 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (15 pp., 1.54 MB)

Newell Street Area II

Letter (with attachments) from Gates (GE) to Young (MEOEEA), August 27, 2008, Re: Newell Street Area II Summary of July 2008 Inspection of Natural Resource Restoration/Enhancement Measures (PDF) (15 pp., 1.56 MB)

September 5, 2008 - addition(s) to Groundwater - Reports

GMA - 1, East Street Area 1, East Street Area 2, Lyman Street Area, Newell Street Area I, Newell Street Area II, Oxbow B, Silver Lake

Letter (with enclosure) from Gates (GE) to Fisher (USEPA), August 29, 2008, Re: Groundwater Management Area 1 NAPL Monitoring Report for Spring 2008 (PDF) (184 pp., 5.94 MB)

GMA - 3, Unkamet Brook Area

Letter (with enclosure) from Gates (GE) to Hull (USEPA), August 29, 2008, Re:Groundwater Management Area 3 Groundwater Quality and NAPL Monitoring Interim Report for Spring 2008 (PDF) (245 pp., 7.36 MB)

GMA - 4, Hill 78 Area

Letter (with enclosure) from Gates (GE) to Hull (USEPA), August 29, 2008, Re: Groundwater Management Area 4 Groundwater Quality Monitoring Interim Report for Spring 2008 (PDF) (199 pp., 4.99 MB)

September 3, 2008 - addition(s) to Floodplain Properties - Reports

All Floodplains Current Residential Properties Adjacent to 1 1/2 Mile Reach

Letter (with enclosure) from Tagliaferro (USEPA) to Gates (GE), August 27, 2008, Re: EPA Approval of, and Certificate of Completion for, General Electric's submittal entitled Final Completion Report for Removal Action for Housatonic River Floodplain - Current Residential Properties Adjacent to 1 1/2 Mile Reach, dated July, 2008 (1 pp., 203 KB)

Letter from Steenstrup (MADEP) to Tagliaferro (USEPA), August 21, 2008, Re: Floodplain Residential Properties Adjacent to the 1 1/2 Mile Reach Housatonic River Approval of Final Completion Report for Removal Action for Housatonic River Floodplain Current Residential Properties Adjacent to 1 1/2 Mile Reach (1 pp., 250 KB)

September 3, 2008 - addition(s) to GE Plant Area - Reports

City Recreational Area

Letter (with enclosure) from Fisher (USEPA) to Gates (GE), August 27, 2008, Re: EPA Approval of, and Certificate of Completion for, General Electric's submittal entitled Final Completion report for the City Recreational Area, dated July, 2008 (PDF) (3 pp., 116 KB)

September 3, 2008 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area I

Letter (with enclosure) from Fisher (USEPA) to Gates (GE), August 27, 2008, Re: EPA Approval of, and Certificate of Completion for, General Electric's submittal entitled Final Completion Report for the Newell Street Area I Removal Action, dated July 2008 (3 p., 125 KB)

Former Filled Oxbows A and C

Letter from Steenstrup (MDEP) to Tagliaferro (USEPA), May 21, 2008, Re: Former Oxbow Areas A and C Approval of Final Completion Report for Former Oxbow Areas A and C Removal Action (1 p., 235 KB)

Former Filled Oxbows J and K

Letter from Steenstrup (MADEP) to Tagliaferro (USEPA), May 21, 2008, Re: Former Oxbow Areas J and K Approval of Final Completion Report for Former Oxbow Areas J and K Removal Action (1 p., 265 KB)

September 2, 2008 - addition(s) to Groundwater - Reports

GMA - 5, Oxbow Areas A and C

Letter (with enclosure) from Gates (GE) to Fisher (USEPA), August 22, 2008, Re: Groundwater Management Area 5 Long-Term Monitoring Program Monitoring Event Evaluation Report for Spring 2008 (PDF) (122 pp., 3.31 MB)

September 2, 2008 - addition(s) to Former Filled Oxbows - Reports

Newell Street Area I

Letter from Steenstrup (MADEP) to Tagliaferro (USEPA), August 21, 2008, Re: Newell Street Area I Approval of Final Completion Report for the Newell Street Area I Removal Action (PDF) (1 p., 226 KB)

What's New at the Repositories
(the following PDFs are posted for 6 months)

Documents submitted to the Repositories between

Resources

Press Releases

Public Events & Meetings

Top of Page

Serving Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont, & Tribal Nations


Local Navigation


Jump to main content.