Discharge Monitoring Report Instructions
The DMR Instructions for 2009 have been updated. |
|
The instructions should be carefully reviewed in order to ensure accuracy in reporting and submitting the DMRs to the U.S. EPA and the appropriate state agency.
These instructions are for the states of Massachusetts and New Hampshire which are not delegated the authority for the NPDES program in Region 1 New England.
The facilities in New England (CT, ME, MA, NH, RI, and VT) with SLUDGE reporting requirements should see Chapter 1, Section 9d of the instructions. The states of Maine and Vermont will continue to use the PCS data system.
After the DMR has been properly completed, it must be signed by a principal executive officer or authorized agent. The original, signed and dated DMR must then be mailed, prior to the due date specified in your National Pollutant Discharge Elimination System (NPDES) permit, to:
Water Technical Unit (SEW)
U.S. Environmental Protection Agency
PO Box 8127
Boston, MA 02114
Please be sure to submit the signed original DMR to the U.S. EPA.
Download |
Discharge Monitoring Report 2009 Instructions (PDF) (48 pp., 5.05 MB, about PDF) |