[Code of Federal Regulations] [Title 18, Volume 2, Parts 400 to end] [Revised as of April 1, 2000] From the U.S. Government Printing Office via GPO Access [CITE: 18CFR1304.107] [Page 169-170] CHAPTER XIII--TENNESSEE VALLEY AUTHORITY PART 1304--APPROVAL OF CONSTRUCTION IN THE TENNESSEE RIVER SYSTEM AND REGULATION OF STRUCTURES--Table of Contents Subpart B--Approval of Construction Sec. 1304.107 Conduct of hearings. (a) If a hearing is to be held for any of the reasons described in Sec. 1304.105(b) [[Page 170]] TVA gives notice of the hearing to permit attendance by interested persons. Such notice may be given by publication in the Federal Register, publication in a daily newspaper of general circulation in the area of the proposed structure, personal written notice, or a combination of these methods. The notice indicates the place, date and time of hearing, so far as feasible indicates the particular issues to which the hearing will pertain, states the manner of becoming a party of record, and provides other relevant information. The applicant is automatically a party of record. (b) Hearings may be conducted by the Director and/or such other person or persons as he may designate for that purpose. Hearings are public and are conducted in an informal manner. Parties of record may be represented by counsel or other persons of their choosing. Technical rules of evidence are not observed although reasonable bounds are maintained as to relevancy, materiality, and competency. Evidence may be presented orally or by written statement and need not be under oath. After the hearing has been completed, additional evidence will not be received unless it presents new and material matter that in the judgment of the person or persons conducting the hearing could not be presented at the hearing. Where construction of the project also requires the approval of another agency of the Federal Government by or before whom a hearing is to be held, the Director may arrange with such agency to hold a joint hearing.