[Code of Federal Regulations]
[Title 50, Volume 7]
[Revised as of January 1, 2007]
From the U.S. Government Printing Office via GPO Access
[CITE: 50CFR259.31]

[Page 644-646]
 
                    TITLE 50--WILDLIFE AND FISHERIES
 
  CHAPTER II--NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND 
           ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE
 
PART 259_CAPITAL CONSTRUCTION FUND--Table of Contents
 
Sec. 259.31  Acquisition, construction, or reconstruction.

    (a) Acquisition. No vessel having previously been operated in a 
fishery of the United States prior to its acquisition by the party 
seeking CCF withdrawal therefor shall be a qualified vessel for the 
purpose of acquisition, except in the cases specified in paragraphs 
(a)(1) and (2) of this section:
    (1) A vessel not more than 5 years old, at the time of its 
acquisition by the party seeking CCF withdrawal therefor may be a 
qualified vessel for the purpose of acquisition, but only if each 
acquisition in this category becomes a Schedule A vessel and there 
exists for each acquisition in this category (on a one-for-one basis) an 
additional Schedule B construction or reconstruction. The sole 
consideration for permitting an acquisition in this category is that it 
will enable the party (but the Secretary will not attempt to 
predetermine such an ability) to accelerate accomplishment of the 
additional Schedule B construction or

[[Page 645]]

reconstruction. Should this consideration materially fail, the Secretary 
shall, at his discretion, disqualify previously qualified withdrawals in 
this category, seek liquidated damages as provided for in paragraph 
(a)(4) of this section and/or terminate the Interim CCF Agreement.
    (2) A vessel more than 5 years old, but not more than 25 years old 
(special showing required if more than 25 years old, see paragraph (b) 
of this section), at the time of acquisition by the party seeking CCF 
withdrawal therefor may be a qualified vessel for the purpose of 
acquisition, but only if that same vessel becomes a Schedule A vessel 
and (in addition to being a Schedule B vessel for the purpose of its 
acquisition) becomes a Schedule B vessel for the purpose of that same 
vessel's reconstruction to be accomplished ordinarily within 7 years 
from the date of acquisition. The sole consideration for permitting an 
acquisition in this category is that it will enable a party (but the 
Secretary will not attempt to predetermine such an ability) to 
accelerate accomplishment of the Schedule B reconstruction of the vessel 
so acquired. Should this consideration materially fail, the same penalty 
prescribed in paragraph (a)(1) of this section applies.
    (3) Reserved for minimum deposits under this section.
    (4) Reserved for liquidated damages.
    (b) Reconstruction. No reconstruction project costing less than 
$100,000 shall qualify a vessel for reconstruction, unless the 
reconstruction project costs, or will cost, 20 percent or more of the 
reconstructed vessel's acquisition cost (in its unreconstructed state) 
to the party seeking CCF withdrawal therefor. If the reconstruction 
project meets the $100,000 test, then the 20 percent test does not 
apply. Conversely, if the reconstruction project does not meet the 
$100,000 test, then the 20 percent test applies.
    (1) Reconstruction may include rebuilding, replacing, 
reconditioning, converting and/or improving any portion of a vessel. A 
reconstruction project must, however, substantially prolong the useful 
life of the reconstructed vessel, increase its value, or adapt it to a 
different commercial use in the fishing trade or industry.
    (2) All, or the major portion (ordinarily, not less than 80 
percent), of a reconstruction project's actual cost must (for the 
purpose of meeting the above dollar or percentage tests) be classifiable 
as a capital expenditure for Internal Revenue Service (IRS) purposes. 
That otherwise allowable (i.e., for the purpose of meeting the above 
dollar or percentage tests) portion of a reconstruction project's actual 
cost which is not classifiable as a capital expenditure shall, however, 
be excluded from the amount qualified for withdrawal as a result of the 
reconstruction project.
    (3) No vessel more than 25 years old at the time of withdrawal or 
request for withdrawal shall be a qualified vessel for the purpose of 
reconstruction unless a special showing is made, to the Secretary's 
discretionary satisfaction, that the type and degree of reconstruction 
intended will result in an efficient and productive vessel with an 
economically useful life at least 10 years beyond the date 
reconstruction is completed.
    (c) Time permitted for construction or reconstruction. Construction 
or reconstruction must be completed within 18 months from the date 
construction or reconstruction first commences, unless otherwise 
consented to by the Secretary.
    (d) Energy saving improvements. An improvement made to a vessel to 
conserve energy shall, regardless of cost, be treated as a 
reconstruction for the purpose of qualifying a CCF withdrawal for such 
expenditure and shall be exempted from having to meet conditional 
fishery requirements for reconstruction as set forth in Sec. 259.32 and 
from all qualifying tests for reconstruction set forth in paragraph (b) 
of this section with the following exceptions:
    (1) An energy saving improvement shall be required to meet both 
conditional fishery requirements and the qualifying tests for 
reconstruction if it serves the dual purpose of saving energy and 
meeting the reconstruction requirement of paragraph (a) of this section 
for qualifying a withdrawal for the acquisition of a used vessel.
    (2) That portion of the actual cost of an energy saving improvement 
which is

[[Page 646]]

to be paid for from the CCF must be classifiable and treated as a 
capital expenditure for Internal Revenue Service purposes.
    (e) Safety projects. The acquisition and installation of safety 
equipment for a qualified vessel and vessel modifications whose central 
purpose is materially increasing the safety of a qualified vessel or the 
acquisition and installation of equipment required by law or regulation 
that materially increases the safety of a qualified vessel shall, 
regardless of cost, be treated as reconstruction for the purpose of 
qualifying a CCF withdrawal for such expenditure, shall be exempt from 
having to meet conditional fishery requirements for reconstruction as 
set forth in Sec. 259.32, and shall be exempt from all qualifying tests 
for reconstruction set forth in paragraph (b) of this section, with the 
following exceptions:
    (1) A safety improvement shall be required to meet both conditional 
fishery requirements and all qualifying tests for reconstruction if it 
serves the dual purpose of safety and meeting the reconstruction 
requirement of paragraph (a) of this section for qualifying a withdrawal 
for the acquisition of a used vessel;
    (2) That portion of the actual cost of a safety improvement that is 
to be paid for from the CCF must be classifiable and treated as a 
capital expenditure for Internal Revenue Service purposes;
    (3) Safety improvement projects whose clear and central purpose is 
restricted to complying with the requirements of the Commercial Fishing 
Industry Vessel Safety Act of 1988 (Public Law 100-424 Sec. 1, 102 stat. 
1585 (1988) (codified in scattered sections of 46 U.S.C.)) shall, 
without further documentation, be considered to fall within this 
paragraph (e). Satisfactory documentation will be required for all other 
projects proposed to be considered as falling within this paragraph (e). 
Projects not required by law or regulation whose central purpose clearly 
involves something other than an improvement that materially increases 
the safety of a vessel will not be considered to fall within this 
paragraph (e).

[39 FR 33675, Sept. 19, 1974, as amended at 46 FR 54563, Nov. 3, 1981; 
62 FR 331, Jan. 3, 1997]