[Code of Federal Regulations]
[Title 40, Volume 11]
[Revised as of January 1, 2007]
From the U.S. Government Printing Office via GPO Access
[CITE: 40CFR63.1432]

[Page 633-634]
 
                   TITLE 40--PROTECTION OF ENVIRONMENT
 
         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)
 
PART 63_NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR 
 
  Subpart PPP_National Emission Standards for Hazardous Air Pollutant 
               Emissions for Polyether Polyols Production
 
Sec.  63.1432  Storage vessel provisions.

    (a) For each storage vessel located at an affected source, the owner 
or operator shall comply with the HON storage vessel requirements of 
Sec. Sec.  63.119 through 63.123 and the HON leak inspection provisions 
in Sec.  63.148, with the differences noted in paragraphs (b) through 
(p) of this section, for the purposes of this subpart.
    (b) When the term ``storage vessel'' is used in the HON storage 
vessel requirements in Sec. Sec.  63.119 through 63.123, the definition 
of this term in Sec.  63.1423 shall apply for the purposes of this 
subpart.
    (c) When the term ``Group 1 storage vessel'' is used in the HON 
storage vessel requirements in Sec. Sec.  63.119 through 63.123, the 
definition of this term in Sec.  63.1423 shall apply for the purposes of 
this subpart.
    (d) When the term ``Group 2 storage vessel'' is used in the HON 
storage vessel requirements in Sec. Sec.  63.119 through 63.123, the 
definition of this term in Sec.  63.1423 shall apply for the purposes of 
this subpart.
    (e) When the HON storage vessel requirements in Sec.  63.119 refer 
to ``December 31, 1992,'' the phrase ``September 4, 1997'' shall apply 
instead, for the purposes of this subpart.
    (f) When the HON storage vessel requirements in Sec.  63.119 refer 
to ``April 22, 1994,'' the phrase ``June 1, 1999,'' shall apply instead, 
for the purposes of this subpart.
    (g) The owner or operator of an affected source shall comply with 
this paragraph instead of Sec.  63.120(d)(1)(ii) for the purposes of 
this subpart. If the combustion, recovery, or recapture device used to 
comply with Sec.  63.119(e) is also used to comply with any of the 
requirements found in Sec. Sec.  63.1425 through 63.1431 and/or Sec.  
63.1433, the performance test required in or accepted by Sec. Sec.  
63.1425 through 63.1431 and/or Sec.  63.1433 is acceptable for 
demonstrating compliance with the HON storage vessel requirements in 
Sec.  63.119(e), for the purposes of this subpart. The owner or operator 
will not be required to prepare a design evaluation for the combustion, 
recovery, or recapture device as described in Sec.  63.120(d)(1)(i), if 
the performance test meets the criteria specified in paragraphs (g)(1) 
and (2) of this section.
    (1) The performance test demonstrates that the combustion, recovery, 
or recapture device achieves greater than or equal to the required 
control efficiency specified in the HON storage vessel requirements in 
Sec.  63.119(e)(1) or (2), as applicable; and
    (2) The performance test is submitted as part of the Notification of 
Compliance Status required by Sec.  63.1439(e)(5).
    (h) When the HON storage vessel requirements in Sec. Sec.  
63.120(d)(3)(i), 63.120(d)(5), and 63.122(g)(2) use the term ``range,'' 
the term ``level'' shall apply instead for the purposes of this subpart.
    (i) For purposes of this subpart, the monitoring plan required by 
the HON storage vessel requirements in Sec.  63.120(d)(2) shall specify 
for which combustion, recovery, or recapture device the owner or 
operator has selected to follow the procedures for continuous monitoring 
specified in Sec.  63.1438. For the combustion, recovery, or recapture

[[Page 634]]

device(s) for which the owner or operator has selected not to follow the 
procedures for continuous monitoring specified in Sec.  63.1438, the 
monitoring plan shall include a description of the parameter(s) to be 
monitored to ensure that the combustion, recovery, or recapture device 
is being properly operated and maintained, an explanation of the 
criteria used for selection of that parameter(s), and the frequency with 
which monitoring will be performed (e.g., when the liquid level in the 
storage vessel is being raised), as specified in Sec.  63.120(d)(2)(i).
    (j) For purposes of this subpart, the monitoring plan required by 
Sec.  63.122(b) shall be included in the Notification of Compliance 
Status required by Sec.  63.1439(e)(5).
    (k) When the HON Notification of Compliance Status requirements 
contained in Sec.  63.152(b) are referred to in Sec. Sec.  63.120, 
63.122, and 63.123, the Notification of Compliance Status requirements 
contained in Sec.  63.1439(e)(5) shall apply for the purposes of this 
subpart.
    (l) When the HON Periodic Report requirements contained in Sec.  
63.152(c) are referred to in Sec. Sec.  63.120 and 63.122, the Periodic 
Report requirements contained in Sec.  63.1439(e)(6) shall apply for the 
purposes of this subpart.
    (m) When other reports as required in Sec.  63.152(d) are referred 
to in Sec.  63.122, the reporting requirements contained in Sec.  
63.1439(e)(7) shall apply for the purposes of this subpart.
    (n) When the HON Initial Notification requirements contained in 
Sec.  63.151(b) are referred to in Sec.  63.119 through Sec.  63.123, 
the owner or operator shall comply with the Initial Notification 
requirements contained in Sec.  63.1439(e)(3), for the purposes of this 
subpart.
    (o) When the determination of equivalence criteria in Sec.  
63.102(b) are referred to in the HON storage vessel requirements in 
Sec.  63.121(a), the General Provisions' alternative nonopacity emission 
provisions in Sec.  63.6(g) shall apply for the purposes of this 
subpart.
    (p) The compliance date for storage vessels at affected sources 
subject to the provisions of this section is specified in Sec.  63.1422.
    (q) In addition to the records required by Sec.  63.123, the owner 
or operator of each storage vessel that is complying with Sec.  
63.119(e) and that has an applicable monitoring plan in accordance with 
Sec.  63.120(d)(2) that does not specify continuous monitoring, shall 
maintain records of all times when the storage tank is being filled 
(i.e., when the liquid level in the storage vessel is being raised). 
These records shall consist of documentation of the time when each 
filling period begins and ends.

[64 FR 29439, June 1, 1999, as amended at 65 FR 26501, May 8, 2000]