"Table 4-7 FY 2005 Analysis of dredging Costs, Actual Amounts for FY 2005",,,,,, ,"Expenditure for dredging ($ thousands)",,,"Cubic yards dredged (thousands)",, ,Federal,Non-federal,Work for others (reimburse),Federal,Non-federal,Work for others (reimburse) "Contract (O&M, CG, MR&T)",,,,,, Maintenance: ,,,,,, Hopper,"$95,373.1 ","$1,709.8 ","$1,095.0 ","43,882.2 ",250.3 ,245.0 Hon-hopper,"$389,989.6 ","$2,084.5 ","$10,745.8 ","118,178.6 ",398.3 ,"3,260.1 " New work: ,,,,,, Hopper,"$44,201.1 ","$12,415.4 ",$0.0 ,"8,370.8 ","3,060.7 ",0.0 Non-hopper,"$182,260.1 ","$80,268.9 ","$7,150.0 ","21,185.8 ","7,051.5 ","1,819.0 " "Gov't plant (O&M, CG, MR&T)",,,,,, Maintenance: ,,,,,, Hopper,"$41,615.8 ",$0.0 ,"$5,433.8 ","14,690.1 ",0.0 ,926.5 Non-hopper,"$45,537.5 ",$5.6 ,"$4,013.0 ","23,863.2 ",0.6 ,852.0 New work: ,,,,,, Hopper,$390.0 ,$0.0 ,$390.0 ,75.0 ,0.0 ,75.0 Non-hopper,$528.5 ,$0.0 ,$0.0 ,207.0 ,0.0 ,0.0 ,Total PL-109-062 Dollars,,,Total PL-109-062 Cubic Yards,, PL-109-062 Work (for Hurricane Katrina),,,,,, Contract: ,,,,,, Hopper ,"$2,550.0 ",$0.0 ,$0.0 ,435.0 ,0.0 ,0.0 Non-hopper,"$2,953.0 ",$0.0 ,$0.0 ,847.0 ,0.0 ,0.0 Gov't plant:,,,,,, Hopper ,$0.0 ,$0.0 ,$0.0 ,0.0 ,0.0 ,0.0 Non-hopper,$0.0 ,$0.0 ,$0.0 ,0.0 ,0.0 ,0.0 PL-99 Work (Emergency),,,,,, Contract: ,,,,,, Hopper ,"$4,397.9 ",$0.0 ,$0.0 ,791.5 ,0.0 ,0.0 Non-hopper,"$21,382.3 ",$0.0 ,$0.0 ,"4,614.6 ",0.0 ,0.0 Gov't plant: ,,,,,, Hopper ,$0.0 ,$0.0 ,$0.0 ,0.0 ,0.0 ,0.0 Non-hopper,$0.0 ,$0.0 ,$0.0 ,0.0 ,0.0 ,0.0 Corpswide total,"Dollars=$956,490.7",,,"CYs=255,079.8",, ,Dollar value,Percent,Cubic yards,Percent,Cost/CY, Total dredging for FY 2005,"$956,490.7 ",100.00%,"255,079.8 ",100.00%,$3.75 , Total maintenance dredging for FY 2005,"$597,603.5 ",62.48%,"206,546.9 ",80.97%,$2.89 , Total new work dredging for FY 2005,"$327,604.0 ",34.25%,"41,844.8 ",16.40%,$7.83 , Total emergency dredging for FY 2005,"$25,780.2 ",2.70%,"5,406.1 ",2.12%,$4.77 , Total PL 109-062 dredging for FY 2005 (for Hurricane Katrina),"$5,503.0 ",0.58%,"1,282.0 ",0.50%,$4.29 , Total hopper dredging for FY 2005,"$209,571.9 ",21.91%,"72,802.1 ",28.54%,$2.88 , Maintenance,"$145,227.5 ",15.18%,"59,994.1 ",23.52%,$2.42 , New work,"$57,396.5 ",6.00%,"11,581.5 ",4.54%,$4.96 , Emergency,"$4,397.9 ",0.46%,791.5 ,0.31%,$5.56 , PL 109-062 Katrina,"$2,550.0 ",0.27%,435.0 ,0.17%,$5.86 , Total non-hopper dredging for FY 2005,"$746,918.8 ",78.09%,"182,277.7 ",71.46%,$4.10 , Maintenance,"$452,376.0 ",47.30%,"146,552.8 ",57.45%,$3.09 , New work,"$270,207.5 ",28.25%,"30,263.3 ",11.86%,$8.93 , Emergency,"$21,382.3 ",2.24%,"4,614.6 ",1.81%,$4.63 , PL 109-062 Katrina,"$2,953.0 ",0.31%,847.0 ,0.33%,$3.49 , Total government dredging for FY 2005,"$97,914.2 ",10.24%,"40,689.4 ",15.95%,$2.41 , Hopper,"$47,829.6 ",5.00%,"15,766.6 ",6.18%,$3.03 , Non-hopper,"$50,084.6 ",5.24%,"24,922.8 ",9.77%,$2.01 , Total contract dredging for FY 2005,"$858,576.5 ",89.76%,"214,390.4 ",84.05%,$4.00 , Hopper,"$161,742.3 ",16.91%,"57,035.5 ",22.36%,$2.84 , Non-hopper,"$696,834.2 ",72.85%,"157,354.9 ",61.69%,$4.43 , Total federal dredging for FY 2005,"$831,178.9 ",86.90%,"237,140.8 ",92.97%,$3.51 , Total non-federal dredging for FY 2005,"$96,484.2 ",10.09%,"10,761.4 ",4.22%,$8.97 , Total work for others - FY 2005,"$28,827.6 ",3.01%,"7,177.6 ",2.81%,$4.02 , KEY: CY = cubic yards; FY = fiscal year.,,,,,, "SOURCE: U.S. Army Corps of Engineers, Navigation Data Center, personal communication, Aug. 28, 2008.",,,,,, • dredging of sediment is carried out by the U.S. Army Corps of Engineers and U.S. port authorities.,,,,,, • Sixty-two percent of total dredging in FY2005 was maintenance dredging.,,,,,,