Achieving a High Level of Smoothness in Concrete Pavements Without Sacrificing Long-Term PerformancePublication No. FHWA-HRT-05-068
|
1. Report No FHWA-HRT-05-068 | 2. Government Accession No. | 3. Recipient's Catalog No. | |
4. Title and Subtitle Achieving a High Level of Smoothness in Concrete Pavements Without Sacrificing Long-Term Performance | 5. Report Date October 2005 | ||
6. Performing Organization Code | |||
7. Author(s) R.W. Perera, S.D. Kohn, and S. Tayabji | 8. Performing Organization Report No. | ||
9. Performing Organization Name and Address Soil and Materials Engineers, Inc., 43980 Plymouth Oaks Blvd., Plymouth, MI 48170 Construction Technology Laboratories, Inc. 5565 Sterrett Place, Suite 312 Columbia, MD 21044 | 10. Work Unit No. (TRAIS) | ||
11. Contract or Grant No. DTFH61-01-C-00030 | |||
12. Sponsoring Agency Name and Address Office of Infrastructure Research and Development Turner-Fairbank Highway Research Center Federal Highway Administration 6300 Georgetown Pike McLean, VA 22101 | 13. Type of Report and Period Covered Final report, 2001-2004 | ||
14. Sponsoring Agency Code | |||
15. Supplementary Notes Mr. Peter Kopac of FHWA served as the Contracting Officer's Technical Representative for this project. Dr. Chris Byrum of Soil and Materials Engineers participated in this project by computing curvature indices and contributing to research discussions. We would like to express our appreciation to the following people for collecting profile data at test sections that were used in this study: Kevin Jones, Iowa Department of Transportation; Tom Hynes, Michigan Department of Transportation; and Jim Kyper, New Enterprise Stone and Lime Company. | |||
16. Abstract In a PCC pavement, it is important to achieve both a high level of smoothness during construction, as well as a satisfactory long-term performance. It is not acceptable to construct a pavement with a high initial smoothness that will give poor long-term performance. The design features and material properties of the PCC pavement should be conducive to yielding satisfactory long-term performance. Smoothness measurements for construction acceptance are usually performed shortly after paving is completed. The results from the smoothness measurements are used to judge whether the pavement has achieved the specified smoothness level. However, it is unclear whether the smoothness of a pavement measured immediately after it is paved truly reflects the initial smoothness of the pavement because the smoothness may undergo changes over the short term (e.g., within 3 months) due to curling or warping effects. This report: (1) assesses whether high initial smoothness translates into better long-term performance, (2) identifies design features and material properties in PCC pavements that can cause an initially smooth pavement to exhibit detrimental long-term performance, (3) provides guidance on materials properties, design features, and construction procedures to avoid these detrimental effects, (4) investigates how the smoothness of a PCC pavement measured immediately after construction can change over the short term (within the first 3 months), and (5) looks at data collection issues related to lightweight inertial profilers. | |||
17. Key Words concrete pavement, concrete properties, concrete mix design, pavement construction, pavement testing, pavement smoothness, pavement performance, inertial profilers, profile measurements | 18. Distribution Statement No restrictions. | ||
19. Security Classif. (of this report) Unclassified | 20. Security Classif. (of this page) Unclassified | 21. No. of Pages 209 | 22. Price |
Form DOT F 1700.7 (8-72) Reproduction of completed page authorized
SI* (Modern Metric) Conversion Factors
Contents | Next >> |