Construction Cycle One (CC-1) Rigid & Flexible Test Items

Strain Gage: Concrete and Asphalt

Test Setup Sensor Information
Image file Vehicle Configuration Adobe Acrobat Sensor Diagrams
Adobe Acrobat Wander Pattern MS Excel File Sensor Table
Image file Test Area Diagram  
zip file Material Properties  

Test Setup

CC-1 test pavement was completed with the initial construction of the National Airport Pavement Test Facility in April '99. CC-1 consists of 9 test items - 6 flexible and 3 rigid. On each of the three different subgrade types (low strength - CBR 3, medium strength - CBR 8, and high strength - CBR 20), two flexible and one rigid test item was constructed. Of the two flexible test items on a given subgrade, one had P-401 asphalt stabilized base, and the other P-209 crushed stone base. The rigid test items were constructed on P-306 cement stabilized base (Econcrete). Test item construction was completed in May 1999. Traffic tests were conducted February 14, through November 15, 2000 and May 12, through November 5, 2001.

Summary of Daily Traffic Repetitions

The traffic data for flexible and rigid pavement test items is available. Daily and monthly traffic repetitions, as well as current traffic totals, are given for each test item. It is strongly recommended that users consult this table to become familiar with the trafficking history before searching the static and dynamic data.

Post Traffic Test

The summary of post traffic tests from test item MFC (CC-1) is given in the following Technical Note: 

Adobe Acrobat Posttraffic Testing at the National Airport Pavement Test Facility: Test Item MFC