|
2008 FHWA Accelerated Bridge Construction Conference
2008 FHWA Accelerated Bridge Construction: Highway For Life Conference Flyer
PDF Version (0.6 mb)
March 20, 21, 2008
Hyatt Regency Baltimore on the Inner Harbor
Baltimore, Maryland
Short Course on Design of steel and concrete bridges using AASHTO LRFD Bridge Design Specifications, March 19, 2008
Sponsored By: Federal Highway Administration (FHWA)
Co-Sponsored By
- California Dept of Transp
- North Carolina Dept of Transp
- Florida Dept of Transp
- Oregon Dept of Transp
- Georgia Dept of Transp
- Pennsylvania Dept of Transp
- Maryland Dept of Transp
- South Carolina Dept of Transp
- Montana Dept of Transp
- Texas Dept of Transp
- Nebraska Dept of Roads Virginia Dept of Transp
- New York Dept of Transp
- Washington Dept of Transp
Pre-Conference Workshops
Steel Bridge Design using AASHTO/LRFD Specifications (2007 Edition)
8:00 a.m. to Noon, March 19, 2008
Starting with the third edition of the AASHTO LRFD Bridge Design Specifications, major changes were incorporated for designing steel bridges. These changes, while making the code more readable and comprehensive, nevertheless demand familiarity with background and the philosophies for making them to begin with.
This portion of the seminar will include a brief background to various design provisions, followed by short examples demonstrating their use.
Instructor: Atorod Azizinamini Ph.D., P.E. is a Professor of Civil Engineering at the University of Nebraska-Lincoln (UNL). He is also Director of the National Bridge Research Organization (NaBRO) at UNL. He has more than 200 technical publications in the structural engineering field and is nationally and internationally recognized for his expertise in the steel bridge area.
Concrete Bridge Design Using AASHTO LRFD Bridge Design Specification (2007 Edition)
1:00 p.m. to 5:00 p.m., March 19, 2008
This short course will provide an understanding of the background of the LRFD concrete specifications, an overview of the state-of-the-art design procedures, and design examples.
Instructors:
Shri B. Bhide, Ph.D. P.E., S.E., is Director of Engineering at Leap Software. He was formerly the manager of the Bridge Program at the Portland Cement Association. He is a member of numerous bridge engineering committees and has published extensively in the structural engineering area.
Bijan Khaleghi, Ph.D., P.E., S.E., is concrete specialist at the Washington State Department of Transportation in Olympia Washington. Bijan has over 21 years of professional experience in bridge design and is an active member of the PCI Bridge Committee and the AASHTO T-10 committee on Concrete Bridges.
Thursday General Session Schedule
Main Ballroom
General Session Moderators
Benjamin Tang, P.E., FHWA and Atorod Azizinamini, Ph.D., P.E., University of Nebraska -Lincoln
8:00 - 8:45 |
Welcome: Introduction and plaque presentations, recognizing Co-Sponsoring Consultants and best paper awards
- Vasant Mistry, FHWA
- Myint Lwin, FHWA
- Robert Healy, Maryland DOT
- Byron Lord, FHWA
- Edward Power, HDR, Inc.
|
8:45 - 9:05 |
National Perspective on Accelerated Bridge Construction
Vasant Mistry, P.E., FHWA |
9:05 - 9:45 |
Key Note Talk: Accelerated Bridge Construction: European Experiences, Technologies and Methodologies
Jan De Boer, President De Boer DC, Netherlands |
9:45 - 10:15 |
Design for 100 plus Years of Service Life: European Approach
Carola Edvardsen, COWI, Denmark |
10:15 - 10:40 |
Break |
10:40-11:30 |
Recent Developments in Ultra-Rapid Bridge Replacement: Opportunities and Resources for Agencies and Contractors
Mary Lou Ralls, Ralls Newman, LLC
Jim McMinimee, Utah DOT |
11:30 - Noon |
Innovative Bridge Solutions Through SHRP2
William Nickas, P.E. , Corven Engineering, Inc. |
12:00 - 1:10 |
Lunch Break |
Thursday Breakout Sessions
Time |
Room 1 |
Room 2 |
Room 3 |
|
Session #1: General Issues and Design Glen Meyer, PBS&J and Conn Abnee, NSBA |
Session #2: PreCast John Dick, PCI and Homoz Seradj, Oregon DOT |
Session #3: Seismic Bruce Johnson, Oregon DOT and Mark Stark, Olsson Associates |
1:10 |
Developing Practice on Accelerated Bridge Construction in California
Paul Chung, California Department of Transportation
Raymond Wolfe, California Department of Transportation |
All-Precast Multiple Simple Span Bridge
Robert Bulger, P.E., Maine DOT |
Precast Bridge Bent Connection for Rapid Construction in Seismic Regions
John Stanton, University of Washington
Marc Eberhard, University of Washington
Jason Pang, University of Washington |
1:30 |
Proposed Doctrine for Accelerated Bridge Construction
Joseph P. Hanus, United States Military Academy
Lawrence C. Bank, University of Wisconsin, Madison |
Analysis of Longitudinal Joint Connections for Decked Precast Prestressed Concrete Girder Bridges
Matt Z. Smith, Michigan Technological University
Yue Li, Michigan Technological University
Theresa M. Ahlborn, Michigan Technological University |
Seismic Response of Precast Segmental Bridge Superstructures and Bonded Tendons
Marc J. Veletzos, University of California, San Diego
Jose I. Restrepo, University of California, San Diego |
1:50 |
Construction and Maintenance Benefits of Continuous for Live Load Steel Girder Construction
Anthony Ream, HDR Engineering, Inc.
James Bintrim, HDR Engineering, Inc.
Matthew Bunner, HDR Engineering, Inc. |
Integrated Monitoring of a 50m-Long Precast Concrete Box Girder for Incheon Bridge Viaducts Constructed with FSLM (Full Span Launching Method)
Kyu-Yong Choi, Samsung Corporation
Geun-Yong Song, Samsung Corporation
Dong-Ok Kang, Samsung Corporation
Kyoung-Lae Park, Samsung Corporation
Choong-Hee Lee, (AFFILIATION???)
Man-Geun Yoon, Samsung Corporation |
Seismic Performance of Precast U-girders Integrally Connected to a Cast-in-Place Substructure
Kevin L. Almer, University of Nevada, Reno
David H. Sanders, University of Nevada, Reno |
2:10 |
Folded Steel Plate Technology for Accelerating the Construction Process
Atorod Azizinamini, University of Nebraska-Lincoln |
Longitudinal Joint Details for Decked Bulb-Tee Girder Bridges
Z. John Ma, University of Tennessee, Knoxville
Lungui Li, , University of Tennessee, Knoxville
Mary Griffey, University of Tennessee, Knoxville
Ralph G Oesterle, CTL Group |
Seismic evaluation of precast concrete bridges with Hybrid connections
Seyed Mehdi Zahrai, Tehran University
Seyed Mehrdad Hosseini, Imam Khomeini Intl. University
Seyed Mehran Hosseini, Iran Univ. of Science and Tech.
Amir Akbarpoor Nahani, P.P.C. Co., Tehran, Iran |
2:30 - 3:00 |
Break |
|
Session #4: General Issues and Design Tae-Yang Yoon, RIST and Glen Meyer, PBS&J |
Session #5: Components and Systems Shri Bhide, LEAP Software and Chan-Hee Park, RIST |
Session #6: Seismic and Substructure Kevin Thompson, California DOT and Alex Wilson, Mittal Steel |
3:00 |
Accelerated Construction of Steel Bridges in Tennessee
David Chapman, University of Tennessee, Knoxville |
Precast Concrete Spliced Girders for Accelerated Construction of Bridge Widenings in Highly Congested Urban Interchanges
Sami Megally, PBS&J
Jay Holombo, PBS&J |
Accelerated Bridge Construction in Areas of High or Moderate Seismisity
Bijan Khaleghi, Washington State DOT |
3:20 |
From BIM to BrIM (Bridge Information Modeling) for Accelerated Bridge Delivery
Stuart Chen, State University of New York at Buffalo
Jay Puckett, University of Wyoming
Arun Shirolé, Arora and Associates, P.C. |
Rational Design Approaches for Precast Concrete Connections
Jimin Huang, HDR Engineering Inc |
Issues Related to Accelerating Bridge Construction in High Seismic Zones
Raymond W. Wolfe, California DOT
Michael D. Keever, California DOT
Mary Lou Ralls, Ralls-Newman, LLC |
3:40 |
Rapid Bridge Design Methods: Two Successful Case Studies
Mark P. Henderson, LJB, Inc. |
Static Test for a Precast Concrete Barrier System
Myoung-Sung Choi, Daewoo Institute of Construction Tech.
Se-Jin Jeon, Daewoo Institute of Construction Tech.
Young-Jin Kim, Daewoo Institute of Construction Tech.
Byung-Hak Hyun, BNG Consultants, Seongnam, Korea |
Accelerated Bridge Construction in Seismic Regions
W. Phillip Yen, FHWA
Amjad Aref, State University of New York at Buffalo |
4:00 |
Accelerated Bridge Construction in Far East Asia: New Trends with Applications
Yoon, Tae-Yang, RIST Steel Structure Research Center
Park, Chan-Hee, RIST Steel Structure Research Center |
Accelerated Bridge Construction with Full Depth Precast Deck Panels and New Type PSC Girder
Se-Jin Park, Daewoo Institute of Construction Tech.
In-Kyu Kim, Daewoo Institute of Construction Tech.
Young-Jin Kim, Daewoo Institute of Construction Tech.
Seong-Woon Kim, Daewoo Institute of Construction Tech. |
Concrete Filled Tubes for Rapid Construction of Bridge Piers
Charles W. Roeder, University of Washington
Dawn E. Lehman, University of Washington |
4:20 |
McDowell Overpass Widening on the State Route 51 Design Build Project
Robert W. Ringwald, DMJM Harris
John Kraemer, Pulice Construction
Juan R. Miranda, Pulice Construction |
Decked Steel Girders for Accelerated Bridge Construction
Ronald D. Medlock, High Steel Structures, Inc. |
MSE Supported Bridge Abutments Speed Construction and Provide Sustainability
John E. Sankey, The Reinforced Earth Company
Keith Brabant, The Reinforced Earth Company |
4:40 |
Accelerated Constuction Techniques: Raising the Visibility of Rebar
Raul Amaya, Bentley Systems, Inc. |
An International Perspective: Renovating Existing Bridges with Orthotropic Steel Deck Panels
Carl Huang, California DOT
Alfred R. Mangus, California DOT |
Highway Wall and Pier Surface Treatments: Form Liners and Brick-Inlay Systems for Precast and Poured-in-Place Concrete
Dana Johnston, Scott System, Inc.
Presenter: Buck Scott, Scott System, Inc. |
5:00 - 6:30 |
Dinner |
|
Session #7: General Issues and Design Raj Ailaney, FHWA and Edward Power, HDR, Inc |
Session #8: Prefabrication Homoz Seradj, Oregon DOT and Robert Healy, Maryland DOT |
Session #9: Substructure Barry Bowers, South Carolina DOT and William Cox, Texas DOT |
6:30 |
Recent Developments in the Design of New Jersey Bridges Using Accelerated Bridge Construction (ABC) Concepts
Mohiuddin A. Khan, Johnson, Mirmiran and Thompson Inc.
Richard W. Dunne, New Jersey DOT |
Prefabricated Bridges Allow DOTs to Replace Bridges at Record Speeds
Michael G. Carfagno, CONTECH Bridge Solutions, Inc. |
Rapid Construction of Modular Innovative Bridge Substructure
Bin Li, Florida International University
Yilei Shi, Florida International University
Amir Mirmiran, Florida International University |
6:50 |
Rebuilding a Cheyenne Link
Mark Stark, Olsson Associates |
Accelerated Bridge Construction in a Rural Environment
Michael Leonard, HDR Engineering, Inc. |
Emergency Repairs to Union Pacific Railroad Bridge
M. Mansoor Ahsan, Bridgefarmer & Associates |
7:10 |
Salt Creek Bridge Replacement - 18 Day Bridge
Glenn Myers, PBS&J |
Smart, Repetitive Methods Accelerate Construction of Long Dual Bridges
Eliza. D. Rodriquez, HDR Engineering, Inc.
Randall Gattis, HDR Engineering, Inc. |
Open CellTM Bridges
Dennis Nottingham, P|N|D Engineers, Inc. |
7:30 |
Fast Replacement Construction Methods for Railway Bridges
Jung-Hyun Kim, KOBEC
Chang-Su Shim, Chung-Ang University |
Using pre-fabricated temporary bridges to expedite bridge repair/replacement
Robert Smith, Mabey Bridge & Shore, Inc. |
Experimental Study on Circular Precast Piers with Bonded Prestressing Bars
Chang-Su Shim, Chung-Ang University
Chul-Hun Chung, Dankook University
Choel-Hwan Kim, POSCO E&C |
7:50 |
Adjacent Steel Box Beam Technology for Accelerating the Construction Process
Aaron Yakel, University of Nebraska-Lincoln
Atorod Azizinamini, University of Nebraska-Lincoln |
Rapid Bridge Construction using Timber Components
David Clemens, Wheeler Lumber, LLC. |
Comparison between precast and insitu construction of bridges
Seyed Mehdi Zahrai, Tehran University
Seyed Mehrdad Hosseini, Imam Khomeini Intl. University
Seyed Mehran Hosseini, Iran Univ. of Science and Tech.
Amir Akbarpoor Nahani, P.P.C. Co., Tehran, Iran |
Friday Breakout sessions
Time |
Room 1 |
Room 2 |
Room 3 |
|
Session #10: Contract and Design Management Kent Barnes, Montana DOT and Mark Stark, Olsson Associates |
Session #11: Components and Systems Lex Collins, Florida DOT and Tom Macioce, Pennsylvania DOT |
Session #12: Pre-Build Solutions George Christian, NY DOT and Allen Raynor, North Carolina DOT |
8:00 |
Design/Build Best Value Project to Replace Two Interstate Overpasses
Donald W. Herbert, Pennsylvania DOT
William Harris, Mackin Engineering Company |
Development of new type bridge system the "panel bridge" for accelerated erection
Norito Fujikawa, Nippon Steel Engineering Co., Ltd.
Shigeyuki Mizukami, Nippon Steel Engineering Co., Ltd.
Masatsugu Nagai, Nagaoka University of Technology |
Rapid Bridge Replacement - A Time Honored Tradition of Railroads
Kevin W. Johns, Modjeski and Masters, Inc.
Donald F. Sorgenfrei, Modjeski and Masters, Inc. |
8:20 |
Farm Lane Road Underpass Project
Jeremy A. Hedden, Bergmann Associates, Inc. |
Micro-Reinforced Concrete: A New Ultra-High Performance Concrete for Bridges
Stephan Hauser, Chusid Associates
Presented by: Philip Hofman, Excend, Inc. |
Replacement of a Busy Interchange Bridge Using Accelerated Bridge Construction Techniques
Abhay P. Thorat, P.E., PB Americas Inc.
Chris G. Bailey, P.E., PB Americas Inc. |
8:40 |
An Owner's Perspective on Implementing an Accelerated Bridge Construction Program
James C. McMinimee, Utah Department of Transportation
Carmen E. L. Swanwick HDR Engineering, Inc. |
Accelerated Bridge Rehabilitation
David W. Whitmore, Vector Corrosion Technologies |
Replacement of Mouth of Monocacy Road Bridge over CSXT, Montgomery County, Maryland
Timothy H. Cupples, P.E., Montgomery County Department of Public Works & Transportation
Simon Simon, P.E., Greenhorne & O'Mara, Inc. |
9:00 |
Penobscot Narrows Bridge & Observatory - Wicked Fast! U.S. Route 1 over the Penobscot River, Maine
Bruce Van Note, Maine Department of Transportation
W. Jay Rohleder Jr., FIGG |
Performance of Pin-Connecting Steel Modular Bridge
Dae-Yong Lee, RIST Steel Structure Research Center
Chan-Hee Park, RIST Steel Structure Research Center
Tae-Yang Yoon, RIST Steel Structure Research Center |
Incremental launching of bridges in Europe
Marco Rosignoli, HNTB Corporation
Chiara Rosignoli, HNTB Corporation |
9:20 |
Accelerated Design and Construction for the 24th Street Bridge in Council Bluffs, Iowa
Ahmad Abu-Hawash, Iowa DOT
Hussein Khalil, HDR Engineering, Inc.
Patricia Schwarz, Iowa DOT
Brent Phares, Iowa State University - CTRE
Norm McDonald, Iowa DOT |
Improving tomorrow's Infrastructure: extending the life of concrete structures with solid stainless steel reinforcing bar
Raymond E Schnell, Talley Metals Technology, Inc.
Michael P Bergmann, New York State DOT |
Replacement of 4500 South Bridge over I-215 in Salt Lake City, UT using Self Propelled Modular Transporters (SPMT's)
Michael S. Arens, Michael Baker Jr., Inc.
Hugh Boyle, Michael Baker Jr., Inc.
Boyd Wheeler, Utah Department of Transportation
Wayne Bowden, Ralph L. Wadsworth Const. Co., Inc. |
9:40 - 10:20 |
Break |
|
Session #13: Contract and Design Management Lyman Freemon, Nebraska DOR |
Session #14: Components and Systems Jugesh Kapur, WA DOT and Sam Fallaha, Nebraska DOR |
Session #15: Pre-Build Solutions Paul Lile, Georgia DOT and Mark Stark, Olsson Associates |
10:20 |
Accelerated Bridge Construction Emergency Replacement of NJ Rt. 70 Bridge over Friendship Creek Southampton Township, Burlington County, NJ
Gerard C. Kroner, Hatch Mott MacDonald, LLC |
RSA Floating Bridge
Rick Adler, RSA Protective Technologies, LLC.
Charles Evans, RSA Protective Technologies, LLC. |
Accelerated Construction of the McCaslin Pedestrian Bridge
John Guenther, Parsons Brinckerhoff
Jeffrey L. Cluphf, Regional Transportation District |
10:40 |
Evaluation of Project Delivery Methods and Best Practices for the I-10 Escambia Bay Bridge Replacement Project in Florida and the I-10 Lake Pontchartrain Bridge Replacement Project in Louisiana due to Hurricanes Ivan and Katrina
Jeffrey Ger, FHWA Florida
Arturo Aguirre, FHWA Louisiana
Mark Stinson, FHWA Louisiana |
Joint Sealing System for Accelerated Bridge Construction
Ronald J. Watson, R. J. Watson, Inc. |
Hood Canal Bridge East and West Approach Span Replacement
Joseph Merth, Washington State DOT |
11:00 |
On the Fast Track Over the Big Thompson River
Gary Maji, DMJM Harris | AECOM |
Fast Non-Destructive Localisation of Prestressing Steel Fractures in Post-Tensioned Concrete Bridges
Bernd Hillemeier, Technische Universität Berlin
Andrei Walther, Technische Universität Berlin
Chol I Pak, Technische Universität Berlin |
Full Depth Precast Prestressed Post-tensioned Concrete Bridge Deck Panels for Rapid Bridge Construction
Erin Santini Bell, University of New Hampshire
Rebekah J. Briggs, PB Americas
David Salzer, University of New Hampshire
Charles Goodspeed, University of New Hampshire |
11:20 |
Overcoming Oregon Design-Build Challenges: Rapid Bridge Replacement at Hancock Mountain
Scott M. Nettleton, T.Y. Lin International
Justin D. Doornink, T.Y. Lin International |
Rapid Construction of Highway Bridges using Hybrid FRP-Concrete Modular Deck Systems
Lijuan Cheng, University of California, Davis |
Accelerated Bridge Redecking Rt. 64 over Pomme de Terre Lake
Bakul Desai, HNTB Corporation
Frank Blakemore, HNTB Corporation |
11:40 - 1:00 |
Lunch |
|
Session #16: Specialty/Unique Topics Arun Shirolé, Arora and Associates, P.C. and Mary Lou Ralls, Ralls Newman, LLC |
Session #17: Composites Glen Meyer, PBS&J and Edward Power, HDR, Inc |
Session #18: Deck and Overlay Sam Fallaha, Nebraska DOR and Dae-Yong Lee, RIST |
1:00 |
Converting the Apache Boulevard/101L Bridge to Dual Highway/LRT Use
Philip Walker, HDR Engineering, Inc.
John Misik, HDR Engineering, Inc. |
FRP Rebar in Bridge Decks For Greater Deck Longevity
Ryan Koch, Hughes Brothers, Inc.
Doug Gremel, Hughes Brothers, Inc. |
Accelerated Replacement of RC Slab into PC slab On steel girder bridge, "Konogawa Bridge"
Akitaka Takeuchi, Central Nippon Expressway Co., Ltd.
Masami Fujita, Central Nippon Expressway Co., Ltd.
Masaki Otsuji, Central Nippon Expressway Co., Ltd.
Kazuyuki Jyoudai, PC Bridge Co., Ltd.
Naonori Imura, Oriental Construction Co., Ltd. |
1:20 |
Development of an Accelerated Construction Method For a Modified Arch Bridge
Zhixiang Zhou, Chongqing Jiaotong University
Fang Li, East & West Engineering Technologies Inc.
Roy A Imbsen, Imbsen Consulting |
Fiber-Reinforced Polymer (FRP) Structural Stay-in-Place Formwork as a Means of Rapid, Durable And Cost-Effective Construction and Rehabilitation of Bridge Decks
Vistasp M. Karbhari, University of California, San Diego
J. Mitchell, University of California, San Diego
A. Goodman, University of California, San Diego
C. Sikorsky, California DOT |
Replacement of the Bascule Span Deck of the Mill Basin Bridge on the Belt Parkway
C. Sklavounakis, New York City DOT
B. Duran, New York City DOT
M. Lahti, TranSystems│Lichtenstein
G. Hill, Kiewit Constructors |
1:40 |
Design and Consruction of Elevating of Important Railway
Yoshihiro Yukizawa, East Japan Railway Co. |
Innovative Modular FRP Bridge Systems - Results of Monitoring After 5+ Years of Use
C. Sikorsky, California DOT
H. Guan, University of California San Diego
Vistasp M. Karbhari, University of California San Diego |
Rapid Replacement of Deck Slabs of the Gowanus Expressway Viaduct, Using Accelerated Concrete and the Maturity Method
Walid S. Najjar, Ph.D., P.E., CHAS. H. SELLS, INC.
Steven W. Smith, P.E., CHAS. H. SELLS, INC. |
2:00 |
An International Perspective: Existing Bridges with Hybrid Superstructure Orthotropic Steel with Prestressed Concrete
Carl Huang, California DOT
Alfred R. Mangus, California DOT |
Accelerating Acceptance of FRP Decks: Focus on Life Cycle Costs, Superior Strength Demonstrated through Independent Testing, and Ease of Construction
Dan Richards, Ph.D., P.E., ZellComp, Inc. |
Polyester Polymer Concrete (PPC) Overlays Return Traffic Overnight
Paul D. Krauss, Wiss, Janney, Elstner Assoc.
Al Klail, Kwik Bond Polymers
Ric Maggenti, California DOT |
There is no registration fee to attend the conference or the workshops, however, you must pre-register to attend. Space is limited and registrations will be based on a first come first registered basis.
Attendees will receive a certificate stating they have attended continuing education classes
Visit www.fhwa.dot.gov/bridge/accelerated for more information
Conference Planning Committee
- Conn Abnee, NSBA
- John Dick, PCI
- William Nickas, Corven Engineering, Inc.
- Raj Ailaney, FHWA
- Sam Fallaha, Nebraska DOR
- Edward Power, HDR, Inc
- Atorod Azizinamini, Univ. of NE-Lincoln
- Lyman Freemon, Nebraska DOR
- Mary Lou Ralls, Ralls Newman, LLC
- Kent Barnes, Montana DOT
- Robert Healy, Maryland DOT
- Allen Raynor, North Carolina DOT
- Shri Bhide, LEAP Software
- Bruce Johnson, Oregon DOT
- Arun Shirolé, Arora and Associates, P.C.
- Barry Bowers, South Carolina DOT
- Jugesh Kapur, Washington State DOT
- Mark Stark, Olsson Associates
- George Christian, New York DOT
- Paul Lile, Georgia DOT
- Kevin Thompson, California DOT
- Lex Collins, Florida DOT
- Tom Macioce, Pennsylvania DOT
- Alex Wilson, Mittal Steel
- William Cox, Texas DOT
- Vasant Mistry, FHWA
- Homoz Seradj, Oregon DOT
Conference Co-Chairs:
Dr. Atorod Azizinamini
University of Nebraska, Lincoln
402 472-3029
Vasant Mistry Federal Highway Administration 202 366-4599
Visit www.fhwa.dot.gov/bridge/accelerated For More Information
Hotel Information
Conference and workshops will be held at Hyatt Regency Baltimore on the Inner Harbor
300 Light Street
Baltimore, Maryland, 21202
Ph. 410-528-1234
Fax 410-685-3362
For hotel Reservations
Block of room at the conference rates are reserved. The conference rate is set at the government rate for all attendees, regardless of their affiliation. The cut off date for getting conference rate is Feb 20, 2008. To make a hotel reservations follow the steps below:
- www.baltimore.hyatt.com
- Specify the check in and check out dates and other information requested
- At the left of the page you will also see "Group/Corporate #". Specify "g-higb" and click
You should see the conference rates which are as follows:
Single Occupancy: $148.00
Double Occupancy: $148.00
Triple Occupancy: $173.00 Quadruple Occupancy: $198.00
Rates do not include applicable state and local taxes.
Or call hotel directly at 800-872-3600. Mention the group rate and the code "g-higb”
Registration Form
Go to the registration form
|
Events
More Information
Contact
Vasant Mistry
Office of Bridge Technology 202-366-4599 E-mail Vasant
|