                           TITLE 46--SHIPPING
 
    CHAPTER I--COAST GUARD, DEPARTMENT OF TRANSPORTATION (CONTINUED)
 
PART 112--EMERGENCY LIGHTING AND POWER SYSTEMS--Table of Contents
 
    Subpart 112.20--Emergency Systems Having a Temporary and a Final 
                         Emergency Power Source
 
Sec. 112.20-3  Normal source for emergency loads.

    (a) The normal source for emergency loads must be the ship's service 
generating plant.
    (b) The power from the ship's service generating plant for the 
emergency loads must be supplied to the emergency switchboard through 
automatic transfer switches.