[Code of Federal Regulations] [Title 48, Volume 1] [Revised as of October 1, 2002] From the U.S. Government Printing Office via GPO Access [CITE: 48CFR45] [Page 836] TITLE 48--FEDERAL ACQUISITION REGULATIONS SYSTEM CHAPTER 1--FEDERAL ACQUISITION REGULATION PART 45--GOVERNMENT PROPERTY--Table of Contents Subpart 45.6--Reporting, Redistribution, and Disposal of Contractor Inventory 45.606-3 Acceptance. (a) Within l5 days after receipt of inventory schedules, the plant clearance officer shall review them, determine their acceptability, and request the contractor to correct any inadequate listings. Inventory schedules should not be rejected if the information is adequate for disposal purposes, even if complete cost data on work-in-process are not available. Rejection shall be limited, when possible, to specific items and shall not necessarily render the entire schedule unacceptable. If substantial errors are discovered that were not apparent on termination inventory schedules previously found acceptable, the final phase of a plant clearance period shall not begin until corrected schedules have been submitted, unless the plant clearance officer determines otherwise. (b) The plant clearance officer, with the assistance of other Government personnel as necessary, shall verify that (1) the inventory is present at the location indicated, (2) the inventory is allocable to the contract, (3) the quantity and condition are correctly stated, and (4) the contractor has endeavored to divert items to other work. The verification may be recorded on SF 1423, Inventory Verification Survey. The plant clearance officer shall require the contractor to promptly correct any discrepancies on the inventory schedule or resubmit the schedule as necessary. [48 FR 42392, Sept. 19, 1983, as amended at 55 FR 25530, June 21, 1990]