U.S. Department of Health and Human Services
Indian Health Service: The Federal Health Program for American Indians and Alaska Natives
CPIC
Capital Planning and Investment Control

Exhibit 300 (BY2010) for IHS - National Patient Information Reporting System (NPIRS) - Maintenance and Enhancements

Part One

Overview


1. Date of Submission:
2009-04-10
2. Agency:
009
3. Bureau:
17
4. Name of this Capital Asset:
IHS - National Patient Information Reporting System (NPIRS) - - Maintenance and Enhancements
5. Unique Project Identifier:
009-17-01-02-01-1020-00
6. What kind of investment will this be in FY2010?
Operations and Maintenance
7. What was the first budget year this investment was submitted to OMB?
FY2001 or earlier
8. Provide a brief summary and justification for this investment, including a brief description of how this closes in part or in whole an identified agency performance gap.
NPIRS is the IHS's national data repository. The purpose of NPIRS is to provide a broad range of clinical and administrative information to managers at all levels of the Indian health system to allow them to better manage individual patients, local facilities, regional and national programs and to produce various reports that are required by statute and regulation. In FY2007, NPIRS completed the National Data Warehouse (NDW) project to improve the accuracy and timeliness of that information and to give IHS managers the additional, more comprehensive information they were lacking and required to make better health management decisions. The NDW replaced a legacy system that could not provide the increasingly detailed reports required to manage patient encounters and registration. There were duplicate records, flaws in the logic that invalidated data review by submitting sites, problems with data integrity and tracing data back to the source, and problems in the timely processing of data. NPIRS data is derived from various government and commercial healthcare information systems that are largely transaction-based systems used to support providing patient care. The data comprises patient registration and clinical encounter records. The NDW provides reports and ad hoc searches of the databases. Internal users and selected authorized external users have secure access to more structured and specific subsets of this information (data marts). NPIRS supports the PMA initiative to integrate performance with budget and the HHS Strategic Objective (S.O. 1.3) to improve health care quality, safety, cost and value by enabling 42 IHS and tribal facilities nationwide to comply with the Joint Commission on Accreditation of Healthcare Organizations (JCAHO) requirements for accreditation necessary for Medicare and Medicaid and other types of billing. It provides composite information needed to measure IHS performance and the allocation of funds to tribal facilities and provides management with the information necessary to cost-beneficially allocate scarce medical resources. NPIRS supports the PMA initiative to expand e-government and the HHS S.O. 1.3 by collecting and integrating information from Tribal, Urban, State, private sector, and other Federal sources (e.g. IHS Fiscal Intermediary, CMS) to facilitate effective collaboration and sharing of this information on-line through more accurate and timely reports through the data marts.
9. Did the Agency's Executive/Investment Committee approve this request?
yes
9.a. If "yes," what was the date of this approval?
2009-03-24
10. Did the Project Manager review this Exhibit?
yes
11.a. What is the current FAC-P/PM certification level of the project/program manager?
Waiver Issued
11.b. When was the Program/Project Manager Assigned?
2004-01-01
11.c. What date did the Program/Project Manager receive the FACP/PM certification? If the certification has not been issued, what is the anticipated date for certification?
2009-07-31
12. Has the agency developed and/or promoted cost effective, energy-efficient and environmentally sustainable techniques or practices for this project.
no
12.a. Will this investment include electronic assets (including computers)?
yes
12.b. Is this investment for new construction or major retrofit of a Federal building or facility? (answer applicable to non-IT assets only)
no
13. Does this investment directly support one of the PMA initiatives?
yes
If yes, select the initiatives that apply:
Initiative Name
Budget Performance Integration
Expanded E-Government
13.a. Briefly and specifically describe for each selected how this asset directly supports the identified initiative(s)? (e.g. If E-Gov is selected, is it an approved shared service provider or the managing partner?)
BPI: Provides composite information needed to measure IHS performance and the allocation of funds to tribal facilities and information necessary to cost-beneficially allocate scarce medical resources EEG: Collects and integrates information from Tribal, Urban, State, private sector, and other Federal sources (e.g. IHS Fiscal Intermediary, CMS) to facilitate effective collaboration and sharing of this information on-line through more accurate and timely reports through the data marts.
14. Does this investment support a program assessed using the Program Assessment Rating Tool (PART)?
no
15. Is this investment for information technology?
yes
16. What is the level of the IT Project (per CIO Council's PM Guidance)?
Level 2
17. What project management qualifications does the Project Manager have? (per CIO Council's PM Guidance)
(1) Project manager has been validated as qualified for this investment
18. Is this investment identified as high risk on the Q4 - FY 2007 agency high risk report (per OMB memorandum M-05-23)?
no
19. Is this a financial management system?
no
20. What is the percentage breakout for the total FY2009 funding request for the following? (This should total 100%)
Area Percentage
Hardware 10
Software 7
Services 73
Other 10
21. If this project produces information dissemination products for the public, are these products published to the Internet in conformance with OMB Memorandum 05-04 and included in your agency inventory, schedules and priorities?
n/a
22. Contact information of individual responsible for privacy related questions.
Name Tibbitts, William D.
Phone Number 301-443-1116
Title IHS Privacy Act Officer
Email william.tibbits@ihs.gov
23. Are the records produced by this investment appropriately scheduled with the National Archives and Records Administration's approval?
yes
24. Does this investment directly support one of the GAO High Risk Areas?
no

+ Top of Page

Summary of Spend


1. Provide the total estimated life-cycle cost for this investment by completing the following table. All amounts represent budget authority in millions, and are rounded to three decimal places. Federal personnel costs should be included only in the row designated Government FTE Cost, and should be excluded from the amounts shown for Planning, Full Acquisition, and Operation/Maintenance. The total estimated annual cost of the investment is the sum of costs for Planning, Full Acquisition, and Operation/Maintenance. For Federal buildings and facilities, life-cycle costs should include long term energy, environmental, decommissioning, and/or restoration costs. The costs associated with the entire life-cycle of the investment should be included in this report.

All amounts represent Budget Authority

Note: For the cross-agency investments, this table should include all funding (both managing partner and partner agencies).

Government FTE Costs should not be included as part of the TOTAL represented.
Cost Type Py-1 & Earlier
-2007
PY
2008
CY
2009
BY
2010
Planning Budgetary Resources 0.280 0.000 0.000 0.000
Acquisition Budgetary Resources 6.856 0.000 0.000 0.000
Maintenance Budgetary Resources 22.680 7.380 7.433 8.185
Government FTE Cost 1.830 0.490 0.507 0.524
# of FTEs 18 4 4 4
2. Will this project require the agency to hire additional FTE's?
no
3. If the summary of spending has changed from the FY2008 President's budget request, briefly explain those changes.
Changed to increase the life of the project through FY2014 expenses and to adequately allocate costs for FTEs in the field.

+ Top of Page

Performance


In order to successfully address this area of the exhibit 300, performance goals must be provided for the agency and be linked to the annual performance plan. The investment must discuss the agency's mission and strategic goals, and performance measures (indicators) must be provided. These goals need to map to the gap in the agency's strategic goals and objectives this investment is designed to fill. They are the internal and external performance benefits this investment is expected to deliver to the agency (e.g., improve efficiency by 60 percent, increase citizen participation by 300 percent a year to achieve an overall citizen participation rate of 75 percent by FY 2xxx, etc.). The goals must be clearly measurable investment outcomes, and if applicable, investment outputs. They do not include the completion date of the module, milestones, or investment, or general goals, such as, significant, better, improved that do not have a quantitative measure.
Agencies must use the following table to report performance goals and measures for the major investment and use the Federal Enterprise Architecture (FEA) Performance Reference Model (PRM). Map all Measurement Indicators to the corresponding Measurement Area and Measurement Grouping identified in the PRM. There should be at least one Measurement Indicator for each of the four different Measurement Areas (for each fiscal year). The PRM is available at www.egov.gov. The table can be extended to include performance measures for years beyond FY 2009.
 
Row Fiscal Year Strategic Goal Supported Measurement Area Measurement Grouping Measurement Indicator Baseline Planned Improvement to the Baseline Actual Results
1 2008 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Report Timeliness. Percentage of the time agency-critical reports delivered within 2 work days of their scheduled dates. Timely patient encounter information will help to improve the quality, safety and value of IHS health care services. 95% baseline established in 2008 by performance-based contract 95% target established by performance-based contract 99.7%
2 2008 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Program/Project Management (PPM). Percentage of OMB/HHS/IHS required PPM information and documents satisfactorily delivered within 5 work days of scheduled date. Good PPM will help to improve the value of IHS health care services. 95% baseline established in 2008 by performance-based contract 95% target established by performance-based contract 100%
3 2008 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Contract Deliverables. Percentage of contract deliverables (documents, training, etc.) satisfactorily delivered within 5 work days of scheduled date. Timely contract deliverables and timely information will help improve the value of IHS health care 95% baseline established in 2008 by performance-based contract 95% target established by performance-based contract 98%
4 2008 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Accuracy of Service or Product Delivered Reports Accuracy. Percentage of specified report counts that are accurate within a 1% margin of error. Accurate patient encounter reports will help improve the quality and safety of IHS health care services. 99% baseline established in 2008 by performance-based contract 99% target established by performance-based contract 99.8%
5 2008 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Customer Satisfaction Customer satisfaction. Percentage of Help Desk tickets closed with the customer satisfied. A responsive help desk will help improve the quality and value of IHS health care services and patient encounter information. 80% baseline established in 2008 by performance-based contract 80% target established by performance-based contract 97.7%
6 2008 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Response Time Customer contact management. Percentage of Help Desk contacts that receive an acknowledgement response within 1 work day. A responsive help desk will help improve the quality and value of IHS health care services and patient encounter information. 95% baseline established in 2008 by performance-based contract 95% target established by performance-based contract 99.2%
7 2008 S.O. 1.3 - Improve health care quality, safety, cost and value Processes and Activities Security Security Certification & Accreditation. Percentage of security requirements that are met within 5 work days of scheduled date. A secure system will help to improve the safety of patient encounter information. 95% baseline established in 2008 by performance-based contract 95% target established by performance-based contract 100%
8 2008 S.O. 1.3 - Improve health care quality, safety, cost and value Technology Availability Service availability. Percentage of the time data marts are available to customers as agreed-to in service level agreements. Timely patient encounter information will help to improve the quality, safety and value of IHS health care services. 95% baseline established in 2008 by performance-based contract 95% target established by performance-based contract 99.6%
9 2009 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Report Timeliness. Percentage of the time agency-critical reports delivered within 2 work days of their scheduled dates. Timely patient encounter information will help to improve the quality, safety and value of IHS health care services. 95% baseline established by performance-based contract 95% target established by performance-based contract 99.8% year to date
10 2009 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Program/Project Management (PPM). Percentage of OMB/HHS/IHS required PPM information and documents satisfactorily delivered within 5 work days of scheduled date. Good PPM will help to improve the value of IHS health care services. 95% baseline established by performance-based contract 95% target established by performance-based contract 100% year to date
11 2009 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Contract Deliverables. Percentage of contract deliverables (documents, training, etc.) satisfactorily delivered within 5 work days of scheduled date. Timely contract deliverables and timely information will help improve the value of IHS health care 95% baseline established by performance-based contract 95% target established by performance-based contract 98.6% year to date
12 2009 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Accuracy of Service or Product Delivered Reports Accuracy. Percentage of specified report counts that are accurate within a 1% margin of error. Accurate patient encounter reports will help improve the quality and safety of IHS health care services. 99% baseline established by performance-based contract 99% target established by performance-based contract 99.9% year to date
13 2009 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Customer Satisfaction Customer satisfaction. Percentage of Help Desk tickets closed with the customer satisfied. A responsive help desk will help improve the quality and value of IHS health care services and patient encounter information. 80% baseline established by contract 80% target established by performance-based contract 95.8% year to date
14 2009 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Response Time Customer contact management. Percentage of Help Desk contacts that receive an acknowledgement response within 1 work day. A responsive help desk will help improve the quality and value of IHS health care services and patient encounter information. 95% baseline established by performance-based contract 95% target established by performance-based contract 99.5% year to date
15 2009 S.O. 1.3 - Improve health care quality, safety, cost and value Processes and Activities Security Security Certification & Accreditation. Percentage of security requirements that are met within 5 work days of scheduled date. A secure system will help to improve the safety of patient encounter information. 95% baseline established by performance-based contract 95% target established by performance-based contract 100% year to date
16 2009 S.O. 1.3 - Improve health care quality, safety, cost and value Technology Availability Service availability. Percentage of the time data marts are available to customers as agreed-to in service level agreements. Timely patient encounter information will help to improve the quality, safety and value of IHS health care services. 95% baseline established by performance-based contract 95% target established by performance-based contract 99.9% year to date
17 2010 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Report Timeliness. Percentage of the time agency-critical reports delivered within 2 work days of their scheduled dates. Timely patient encounter information will help to improve the quality, safety and value of IHS health care services. 95% baseline established by performance-based contract TBD based upon prior year actual results and contracting considerations TBD
18 2010 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Program/Project Management (PPM). Percentage of OMB/HHS/IHS required PPM information and documents satisfactorily delivered within 5 work days of scheduled date. Good PPM will help to improve the value of IHS health care services. 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
19 2010 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Contract Deliverables. Percentage of contract deliverables (documents, training, etc.) satisfactorily delivered within 5 work days of scheduled date. Timely contract deliverables and timely information will help improve the value of IHS health care 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
20 2010 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Accuracy of Service or Product Delivered Reports Accuracy. Percentage of specified report counts that are accurate within a 1% margin of error. Accurate patient encounter reports will help improve the quality and safety of IHS health care services. 99% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
21 2010 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Customer Satisfaction Customer satisfaction. Percentage of Help Desk tickets closed with the customer satisfied. A responsive help desk will help improve the quality and value of IHS health care services and patient encounter information. 80% baseline established by contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
22 2010 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Response Time Customer contact management. Percentage of Help Desk contacts that receive an acknowledgement response within 1 work day. A responsive help desk will help improve the quality and value of IHS health care services and patient encounter information. 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
23 2010 S.O. 1.3 - Improve health care quality, safety, cost and value Processes and Activities Security Security Certification & Accreditation. Percentage of security requirements that are met within 5 work days of scheduled date. A secure system will help to improve the safety of patient encounter information. 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
24 2010 S.O. 1.3 - Improve health care quality, safety, cost and value Technology Availability Service availability. Percentage of the time data marts are available to customers as agreed-to in service level agreements. Timely patient encounter information will help to improve the quality, safety and value of IHS health care services. 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
25 2011 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Report Timeliness. Percentage of the time agency-critical reports delivered within 2 work days of their scheduled dates. Timely patient encounter information will help to improve the quality, safety and value of IHS health care services. 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
26 2011 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Program/Project Management (PPM). Percentage of OMB/HHS/IHS required PPM information and documents satisfactorily delivered within 5 work days of scheduled date. Good PPM will help to improve the value of IHS health care services. 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
27 2011 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Contract Deliverables. Percentage of contract deliverables (documents, training, etc.) satisfactorily delivered within 5 work days of scheduled date. Timely contract deliverables and timely information will help improve the value of IHS health care 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
28 2011 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Accuracy of Service or Product Delivered Reports Accuracy. Percentage of specified report counts that are accurate within a 1% margin of error. Accurate patient encounter reports will help improve the quality and safety of IHS health care services. 99% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
29 2011 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Customer Satisfaction Customer satisfaction. Percentage of Help Desk tickets closed with the customer satisfied. A responsive help desk will help improve the quality and value of IHS health care services and patient encounter information. 80% baseline established by contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
30 2011 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Response Time Customer contact management. Percentage of Help Desk contacts that receive an acknowledgement response within 1 work day. A responsive help desk will help improve the quality and value of IHS health care services and patient encounter information. 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
31 2011 S.O. 1.3 - Improve health care quality, safety, cost and value Processes and Activities Security Security Certification & Accreditation. Percentage of security requirements that are met within 5 work days of scheduled date. A secure system will help to improve the safety of patient encounter information. 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
32 2011 S.O. 1.3 - Improve health care quality, safety, cost and value Technology Availability Service availability. Percentage of the time data marts are available to customers as agreed-to in service level agreements. Timely patient encounter information will help to improve the quality, safety and value of IHS health care services. 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
33 2012 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Report Timeliness. Percentage of the time agency-critical reports delivered within 2 work days of their scheduled dates. Timely patient encounter information will help to improve the quality, safety and value of IHS health care services. 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
34 2012 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Program/Project Management (PPM). Percentage of OMB/HHS/IHS required PPM information and documents satisfactorily delivered within 5 work days of scheduled date. Good PPM will help to improve the value of IHS health care services. 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
35 2012 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Contract Deliverables. Percentage of contract deliverables (documents, training, etc.) satisfactorily delivered within 5 work days of scheduled date. Timely contract deliverables and timely information will help improve the value of IHS health care 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
36 2012 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Accuracy of Service or Product Delivered Reports Accuracy. Percentage of specified report counts that are accurate within a 1% margin of error. Accurate patient encounter reports will help improve the quality and safety of IHS health care services. 99% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
37 2012 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Customer Satisfaction Customer satisfaction. Percentage of Help Desk tickets closed with the customer satisfied. A responsive help desk will help improve the quality and value of IHS health care services and patient encounter information. 80% baseline established by contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
38 2012 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Response Time Customer contact management. Percentage of Help Desk contacts that receive an acknowledgement response within 1 work day. A responsive help desk will help improve the quality and value of IHS health care services and patient encounter information. 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
39 2012 S.O. 1.3 - Improve health care quality, safety, cost and value Processes and Activities Security Security Certification & Accreditation. Percentage of security requirements that are met within 5 work days of scheduled date. A secure system will help to improve the safety of patient encounter information. 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
40 2012 S.O. 1.3 - Improve health care quality, safety, cost and value Technology Availability Service availability. Percentage of the time data marts are available to customers as agreed-to in service level agreements. Timely patient encounter information will help to improve the quality, safety and value of IHS health care services. 95% baseline established by performance-based contract TBD based upon prior year actual results and 'best value' contracting considerations TBD
41 2013 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Report Timeliness. Percentage of the time agency-critical reports delivered within 2 work days of their scheduled dates. Timely patient encounter information will help to improve the quality, safety and value of IHS health care services. TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD
42 2013 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Program/Project Management (PPM). Percentage of OMB/HHS/IHS required PPM information and documents satisfactorily delivered within 5 work days of scheduled date. Good PPM will help to improve the value of IHS health care services. TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD
43 2013 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Contract Deliverables. Percentage of contract deliverables (documents, training, etc.) satisfactorily delivered within 5 work days of scheduled date. Timely contract deliverables and timely information will help improve the value of IHS health care TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD
44 2013 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Accuracy of Service or Product Delivered Reports Accuracy. Percentage of specified report counts that are accurate within a 1% margin of error. Accurate patient encounter reports will help improve the quality and safety of IHS health care services. TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD
45 2013 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Customer Satisfaction Customer satisfaction. Percentage of Help Desk tickets closed with the customer satisfied. A responsive help desk will help improve the quality and value of IHS health care services and patient encounter information. TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD
46 2013 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Response Time Customer contact management. Percentage of Help Desk contacts that receive an acknowledgement response within 1 work day. A responsive help desk will help improve the quality and value of IHS health care services and patient encounter information. TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD
47 2013 S.O. 1.3 - Improve health care quality, safety, cost and value Processes and Activities Security Security Certification & Accreditation. Percentage of security requirements that are met within 5 work days of scheduled date. A secure system will help to improve the safety of patient encounter information. TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD
48 2013 S.O. 1.3 - Improve health care quality, safety, cost and value Technology Availability Service availability. Percentage of the time data marts are available to customers as agreed-to in service level agreements. Timely patient encounter information will help to improve the quality, safety and value of IHS health care services. TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD
49 2014 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Report Timeliness. Percentage of the time agency-critical reports delivered within 2 work days of their scheduled dates. Timely patient encounter information will help to improve the quality, safety and value of IHS health care services. TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD
50 2014 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Program/Project Management (PPM). Percentage of OMB/HHS/IHS required PPM information and documents satisfactorily delivered within 5 work days of scheduled date. Good PPM will help to improve the value of IHS health care services. TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD
51 2014 S.O. 1.3 - Improve health care quality, safety, cost and value Mission and Business Results Health Care Administration Contract Deliverables. Percentage of contract deliverables (documents, training, etc.) satisfactorily delivered within 5 work days of scheduled date. Timely contract deliverables and timely information will help improve the value of IHS health care TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD
52 2014 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Accuracy of Service or Product Delivered Reports Accuracy. Percentage of specified report counts that are accurate within a 1% margin of error. Accurate patient encounter reports will help improve the quality and safety of IHS health care services. TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD
53 2014 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Customer Satisfaction Contract Deliverables. Percentage of contract deliverables (documents, training, etc.) satisfactorily delivered within 5 work days of scheduled date. TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD
54 2014 S.O. 1.3 - Improve health care quality, safety, cost and value Customer Results Response Time Customer contact management. Percentage of Help Desk contacts that receive an acknowledgement response within 1 work day. A responsive help desk will help improve the quality and value of IHS health care services and patient encounter information. TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD
55 2014 S.O. 1.3 - Improve health care quality, safety, cost and value Processes and Activities Security Security Certification & Accreditation. Percentage of security requirements that are met within 5 work days of scheduled date. A secure system will help to improve the safety of patient encounter information. TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD
56 2014 S.O. 1.3 - Improve health care quality, safety, cost and value Technology Availability Service availability. Percentage of the time data marts are available to customers as agreed-to in service level agreements. Timely patient encounter information will help to improve the quality, safety and value of IHS health care services. TBD This will have to be established in the new performance-based contract TBD This will have to be established in the new performance-based contract TBD

 

+ Top of Page

Enterprise Architecture


In order to successfully address this area of the business case and capital asset plan you must ensure the investment is included in the agency's EA and Capital Planning and Investment Control (CPIC) process, and is mapped to and supports the FEA. You must also ensure the business case demonstrates the relationship between the investment and the business, performance, data, services, application, and technology layers of the agency's EA.
1. Is this investment included in your agency's target enterprise architecture?
yes
2. Is this investment included in the agency's EA Transition Strategy?
yes
2.a. If yes, provide the investment name as identified in the Transition Strategy provided in the agency's most recent annual EA Assessment.
IHS - National Patient Information Reporting Systems (NPIRS) -- Maintenance and Enhancements
3. Is this investment identified in a completed (contains a target architecture) and approved segment architecture?
no
4. Identify the service components funded by this major IT investment (e.g., knowledge management, content management, customer relationship management, etc.). Provide this information in the format of the following table. For detailed guidance regarding components, please refer to http://www.whitehouse.gov/omb/egov/.

Component: Use existing SRM Components or identify as NEW. A NEW component is one not already identified as a service component in the FEA SRM.

Reused Name and UPI: A reused component is one being funded by another investment, but being used by this investment. Rather than answer yes or no, identify the reused service component funded by the other investment and identify the other investment using the Unique Project Identifier (UPI) code from the OMB Ex 300 or Ex 53 submission.

Internal or External Reuse?: Internal reuse is within an agency. For example, one agency within a department is reusing a service component provided by another agency within the same department. External reuse is one agency within a department reusing a service component provided by another agency in another department. A good example of this is an E-Gov initiative service being reused by multiple organizations across the federal government.

Funding Percentage: Please provide the percentage of the BY requested funding amount used for each service component listed in the table. If external, provide the funding level transferred to another agency to pay for the service.
Row Agency Component Name Agency Component Description Service Type Component Reused Component Name Reused UPI Internal or External Reuse? Funding %
1 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Knowledge Management Information Sharing No Reuse 1
2 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Reporting OLAP No Reuse 1
3 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Knowledge Management Information Retrieval No Reuse 5
4 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Document Management Library / Storage No Reuse 5
5 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Business Intelligence Decision Support and Planning No Reuse 5
6 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Data Management Data Warehouse No Reuse 25
7 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Development and Integration Data Integration No Reuse 1
8 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Data Management Data Cleansing No Reuse 1
9 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Visualization Graphing / Charting No Reuse 1
10 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Data Management Data Mart No Reuse 25
11 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Data Management Extraction and Transformation No Reuse 1
12 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Data Management Data Classification No Reuse 1
13 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Security Management Access Control No Reuse 1
14 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Reporting Ad Hoc No Reuse 1
15 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Knowledge Discovery Modeling No Reuse 1
16 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Knowledge Discovery Data Mining No Reuse 1
17 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Knowledge Management Categorization No Reuse 1
18 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Analysis and Statistics Structural / Thermal No Reuse 1
19 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Knowledge Management Knowledge Capture No Reuse 5
20 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Reporting Standardized / Canned No Reuse 5
21 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Data Management Loading and Archiving No Reuse 1
22 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Data Management Data Exchange No Reuse 5
23 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Knowledge Management Knowledge Distribution and Delivery No Reuse 5
24 NPIRS National Data Warehouse A national-level data repository that provides information to managers at all levels of the Indian health system. Data Management Meta Data Management No Reuse 1
5. To demonstrate how this major IT investment aligns with the FEA Technical Reference Model (TRM), please list the Service Areas, Categories, Standards, and Service Specifications supporting this IT investment.

FEA SRM Component: Service Components identified in the previous question should be entered in this column. Please enter multiple rows for FEA SRM Components supported by multiple TRM Service Specifications.

Service Specification: In the Service Specification field, Agencies should provide information on the specified technical standard or vendor product mapped to the FEA TRM Service Standard, including model or version numbers, as appropriate.
Row SRM Component Service Area Service Category Service Standard Service Specification (i.e., vendor and product name)
1 Information Sharing Service Access and Delivery Access Channels Collaboration / Communications SAS 9.0 by: SAS Institute Inc.
2 Information Sharing Service Access and Delivery Access Channels Collaboration / Communications Business Objects by: SAP AG
3 OLAP Component Framework Data Management Reporting and Analysis SAS 9.0 by: SAS Institute Inc.
4 OLAP Component Framework Data Management Reporting and Analysis Business Objects by: SAP AG
5 Information Retrieval Service Access and Delivery Delivery Channels Intranet SAS 9.0 by: SAS Institute Inc.
6 Information Retrieval Service Access and Delivery Delivery Channels Intranet Business Objects by: SAP AG
7 Library / Storage Service Platform and Infrastructure Database / Storage Storage IBM DB2 Enterprise Server Edition 8 by: International Business Machines Corp.
8 Decision Support and Planning Component Framework Data Management Reporting and Analysis SAS 9.0 by: SAS Institute Inc.
9 Decision Support and Planning Component Framework Data Management Reporting and Analysis Business Objects by: SAP AG
10 Data Warehouse Service Platform and Infrastructure Database / Storage Database IBM DB2 Enterprise Server Edition 8 by: International Business Machines Corp.
11 Data Integration Service Interface and Integration Interoperability Data Transformation IBM DB2 Enterprise Server Edition 8 by: International Business Machines Corp.
12 Data Integration Service Interface and Integration Interoperability Data Transformation IBM WebSphere QualityStage 7.5 by: International Business Machines Corp.
13 Data Cleansing Service Interface and Integration Interoperability Data Transformation IBM DB2 Enterprise Server Edition 8 by: International Business Machines Corp.
14 Graphing / Charting Component Framework Data Management Reporting and Analysis SAS 9.0 by: SAS Institute Inc.
15 Graphing / Charting Component Framework Data Management Reporting and Analysis Business Objects by: SAP AG
16 Data Mart Service Platform and Infrastructure Database / Storage Database IBM DB2 Enterprise Server Edition 8 by: International Business Machines Corp.
17 Extraction and Transformation Service Interface and Integration Interoperability Data Transformation IBM DB2 Enterprise Server Edition 8 by: International Business Machines Corp.
18 Data Classification Service Interface and Integration Interoperability Data Format / Classification IBM DB2 Enterprise Server Edition 8 by: International Business Machines Corp.
19 Data Classification Service Interface and Integration Interoperability Data Format / Classification IBM WebSphere QualityStage 7.5 by: International Business Machines Corp.
20 Access Control Component Framework Security Supporting Security Services IBM DB2 Enterprise Server Edition 8 by: International Business Machines Corp.
21 Ad Hoc Component Framework Data Management Reporting and Analysis SAS 9.0 by: SAS Institute Inc.
22 Modeling Component Framework Data Management Reporting and Analysis IBM DB2 Enterprise Server Edition 8 by: International Business Machines Corp.
23 Modeling Component Framework Data Management Reporting and Analysis IBM WebSphere QualityStage 7.5 by: International Business Machines Corp.
24 Data Mining Service Platform and Infrastructure Database / Storage Database SAS 9.0 by: SAS Institute Inc.
25 Data Mining Service Platform and Infrastructure Database / Storage Database Business Objects by: SAP AG
26 Categorization Service Interface and Integration Interoperability Data Format / Classification Health Level 7 (HL7) by: Health Level Seven, Inc.
27 Structural / Thermal Service Platform and Infrastructure Database / Storage Database SAS 9.0 by: SAS Institute Inc.
28 Knowledge Capture Service Platform and Infrastructure Database / Storage Database IBM DB2 Enterprise Server Edition 8 by: International Business Machines Corp.
29 Standardized / Canned Component Framework Data Management Reporting and Analysis SAS 9.0 by: SAS Institute Inc.
30 Standardized / Canned Component Framework Data Management Reporting and Analysis Business Objects by: SAP AG
31 Loading and Archiving Service Interface and Integration Interoperability Data Transformation IBM DB2 Enterprise Server Edition 8 by: International Business Machines Corp.
32 Data Exchange Component Framework Data Interchange Data Exchange IBM DB2 Enterprise Server Edition 8 by: International Business Machines Corp.
33 Knowledge Distribution and Delivery Service Access and Delivery Delivery Channels Intranet Business Objects by: SAP AG
34 Knowledge Distribution and Delivery Service Access and Delivery Delivery Channels Intranet SAS 9.0 by: SAS Institute Inc.
35 Meta Data Management Service Platform and Infrastructure Database / Storage Database IBM DB2 Enterprise Server Edition 8 by: International Business Machines Corp.
6. Will the application leverage existing components and/or applications across the Government (i.e., FirstGov, Pay.Gov, etc)?
yes
6.a. If yes, please describe.
IHS leverages software, processes, information and resources from the Veterans Administration and the Veterans Health Administration. IHS also has a letter of collaboration with the DoD on quality measures and methodologies in support of the Executive Order on Health Care Quality and Efficiency (August 22, 2006). IHS is actively involved with the Federal Health Architecture working groups and the Nationwide Health Information Network.

Part Three

+ Top of Page

Risk


You should perform a risk assessment during the early planning and initial concept phase of the investment's life-cycle, develop a risk-adjusted life-cycle cost estimate and a plan to eliminate, mitigate or manage risk, and be actively managing risk throughout the investment's life-cycle.

Answer the following questions to describe how you are managing investment risks.

1. Does the investment have a Risk Management Plan?
yes
1.a. If yes, what is the date of the plan?
2008-03-18
1.b. Has the Risk Management Plan been significantly changed since last year's submission to OMB?
yes
1.c. If yes, describe any significant changes:
The NDW Project (the project to replace NPIRS' legacy system with its new NDW system) has been completed and NPIRS' NDW system is now operational. The risks for the NPIRS Program, previously identified in 2004, have therefore been updated to reflect its transition to a fully steady-state or operational program.

+ Top of Page

Cost & Schedule


1. Was operational analysis conducted?
yes
1.a. If yes, provide the date the analysis was completed.
2009-06-30
What were the results of your operational analysis?
We completed the NDW project September 30, 2007 and the investment became steady-state as of FY 2008. We performed a Post Implementation Review in March 2008. We reported our results of this review in ProSight form 3.05. An Operational Analysis is currently underway.

+ Top of Page