[Federal Register: March 26, 2003 (Volume 68, Number 58)]
[Notices]               
[Page 14616-14617]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr26mr03-66]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 
Notice of Application Accepted for Filing; and Soliciting 
Comments, Motions To Intervene, and Protests

March 19, 2003.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary Permi.
    b. Project No.: 12450-000.
    c. Date filed: February 28, 2003.
    d. Applicant: Logansport Municipal Utilities.
    e. Name and Location of Project: The Tenth Street Dam Hydroelectric 
Project would be located at an existing dam owned by the Applicant on 
the Eel River in Cass County, Indiana. No Federal or Tribal lands would 
be involved.
    f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)--825(r).
    g. Applicant Contact: Mr. Sky K. Medors, Lawson-Fisher Associates 
P.C., 525 West Washington Street, South Bend, IN 46601, (574) 234-3167.
    h. FERC Contact: James Hunter, (202) 502-6086.
    i. Deadline for filing comments, protests, and motions to 
intervene: 60 days from the issuance date of this notice.
    The Commission's Rules of Practice and Procedure require all 
interveners filing documents with the Commission to serve a copy of 
that document on each person in the official service list for the 
project. Further, if an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    j. Description of Project: The proposed project would consist of: 
(1) The existing 410-foot-long, 11-foot-high concrete overflow dam, 
with a sluice gate at the left abutment, creating a 50-acre impoundment 
at normal water surface elevation 601.3 feet, (2) a powerhouse, 
proposed to be built at the site of the sluice gate, containing two 
generating units with a total installed capacity of 950 kilowatts, (4) 
a 1,200-foot-long, 13.8-kilovolt transmission line connecting to the 
Applicant's existing distribution system, and (5) appurtenant 
facilities. The project would have an average annual generation of 3.4 
gigawatthours.
    k. This filing is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site at 
http://www.ferc.gov using the ``FERRIS'' link. Enter the docket number 

http://www.ferc.gov using the ``FERRIS'' link. Enter the docket number 

excluding the last three digits in the docket number field to access 
the document. For assistance, call toll-free 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is 

also available for inspection and reproduction at the address in item 
g. above.
    l. Competing Preliminary Permit--Anyone desiring to file a 
competing application for preliminary permit for a proposed project 
must submit the competing application itself, or a notice of intent to 
file such an application, to the Commission on or before the specified 
comment date for the particular application (see 18 CFR 4.36). 
Submission of a timely notice of intent allows an interested person to 
file the competing preliminary permit application no later than 30 days 
after the specified comment date for the particular application. A 
competing preliminary permit application must conform with 18 CFR 
4.30(b) and 4.36.
    m. Competing Development Application--Any qualified development 
applicant desiring to file a competing development application must 
submit to the Commission, on or before a specified comment date for the 
particular application, either a competing development application or a 
notice of intent to file such an application. Submission of a timely 
notice of intent to file a development application allows an interested 
person to file the competing application no later than 120 days after 
the specified comment date for the particular application. A competing 
license application must conform with 18 CFR 4.30(b) and 4.36.
    n. Notice of Intent--A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit, if such an application may be filed, either a preliminary 
permit application or a development application (specify which type of 
application). A notice of intent must be served on the applicant(s) 
named in this public notice.
    o. Proposed Scope of Studies under Permit--A preliminary permit, if 
issued, does not authorize construction. The term of the proposed 
preliminary permit would be 36 months. The work proposed under the 
preliminary permit would include economic analysis, preparation of 
preliminary engineering plans, and a study of environmental impacts. 
Based on the results of these studies, the Applicant would decide 
whether to proceed with the preparation of a development application to 
construct and operate the project.
    p. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the

[[Page 14617]]

Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    q. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT 
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'', 
``PROTEST'', or ``MOTION TO INTERVENE'', as applicable, and the Project 
Number of the particular application to which the filing refers. Any of 
the above-named documents must be filed by providing an original and 
eight copies to: The Secretary, Federal Energy Regulatory Commission, 
888 First Street, NE., Washington, DC 20426. An additional copy must be 
sent to Director, Division of Hydropower Administration and Compliance, 
Federal Energy Regulatory Commission, at the above-mentioned address. A 
copy of any notice of intent, competing application or motion to 
intervene must also be served upon each representative of the Applicant 
specified in the particular application.
    Comments, protests, and interventions may be filed electronically 
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site under the ``e-Filing'' 
link. The Commission strongly encourages electronic filings. r. Agency 
Comments--Federal, state, and local agencies are invited to file 
comments on the described application. A copy of the application may be 
obtained by agencies directly from the Applicant. If an agency does not 
file comments within the time specified for filing comments, it will be 
presumed to have no comments. One copy of an agency's comments must 
also be sent to the Applicant's representatives.

Magalie R. Salas,
Secretary.
[FR Doc. 03-7213 Filed 3-25-03; 8:45 am]

BILLING CODE 6717-01-P