FY 2005 NPL Program Snapshot
- National Priorities List (NPL) Information Summary
- NPL Federal Facilities by Agency
- Status of NPL Federal Facilities
- Current Site Work
- Completed Site Work
- Federal Facility Cleanup Pipeline
- Interagency Agreements
- % of NPL Federal Facilities with Completed IAGs
- Land Reuse
- Number of Acres at NPL Facilities Made Available for Reuse
- Institutional Controls at NPL Facilities
- Remedial Actions and Removal Actions with Institutional Controls
- Status of 5 Year Review Protectiveness Statements
- Post-Construction Completion Activity at NPL Facilities
- Environmental Indicators at Federal Facilities
- EI Status for Final NPL Federal Facilities (CERCLA)
- RCRA High Priority Facilities
- Notes
National Priorities List (NPL) Information Summary
NPL Federal Facilities by Agency
(Proposed, Final and Deleted)
*Other Federal Agencies include: Coast Guard (1), DOI (2), DOT (1), EPA (1), FAA (1), NASA (2), SBA (1), USDA (2)
Status of NPL Federal Facilities
NPL Status | Number of Federal Facilities | Number of Private Sites | Federal Facility % of NPL Universe |
---|---|---|---|
Proposed | 6 | 56 | 9.7% |
Final | 158 | 1,081 | 12.8% |
Deleted | 14 | 294 | 4.5% |
Total* | 178 | 1,431 | 11.1% |
*Total number of Federal Facilities and private sites on the NPL is 1,609.
Federal Facility Cleanup Pipeline
Notes: All data from 10/14/2005 CERCLIS 3 except where noted. NPL cleanup data includes both Superfund and RCRA activity at Superfund Federal Facilities.
% of NPL Federal Facilities with Completed IAGs
Federal Agencies that have not acheived 100% of their IAGs/FFAs: | |||
Agency | # w/ IAG | Total # | Percent |
---|---|---|---|
Navy | 50 | 54 | 93.0% |
Army | 40 | 45 | 89.0% |
USAF | 30 | 42 | 71.0% |
DoE | 19 | 21 | 90.0% |
USDA | 1 | 2 | 50.0% |
DoT | 0 | 1 | 0.0% |
SBA* | 0 | 1 | 0.0% |
CG | 0 | 1 | 0.0% |
Federal Agencies that have acheived 100% of their IAGs/FFAs: | |||
Agency | # w/ IAG | Total # | Percent |
---|---|---|---|
DLA | 3 | 3 | 100.0% |
NASA | 2 | 2 | 100.0% |
DOI | 2 | 2 | 100.0% |
NAGU | 1 | 1 | 100.0% |
CoE | 1 | 1 | 100.0% |
EPA | 1 | 1 | 100.0% |
FAA | 1 | 1 | 100.0% |
Number of Acres at NPL Facilities
Made Available for Reuse (in Thousands)
(at 72 Facilities)
* Total # of acres made available for reuse at Facilities with EPA involvement (BRAC, NPL, and Non-NPL) = 487.7. Acreage at NPL BRAC Installations = 293.0, other NPL acreage = 46.4 Does not include property transferred between Federal Agencies.
Institutional Controls at NPL Facilities
Remedial Actions and Removal Actions with Institutional Controls
Note: There are 130 NPL Federal Facilities with Institutional Controls.
Status of 5 Year Review Protectiveness Statements
Post-Construction Completion
Activity at NPL Facilities
Total Number of Sites with Completed 5 Year Reviews = 117
(Latest Protectiveness Statement at Site)
Note: In the second quarter of FY 2005, EPA implemented a change in the way 5 Year Review data is recorded.
Environmental Indicators at Federal Facilities
EI Status for Final NPL Federal Facilities (CERCLA)
(Total Facilities = 171*)
* One (1) newly listed site does not have Environmental Indicator data coded yet.
Note: 49% of Facilities have both Human Exposure and Groundwater controlled;
6% of Facilities have neither Human Exposure nor Groundwater controlled
RCRA High Priority Facilities
Total Facilities: 160
Source: RCRIS 7/5/2005
- All data from 10/14/2005 CERCLIS 3 except where noted.
- NPL cleanup data includes both Superfund and RCRA activity at Superfund Federal Facilities.