skip navigational links United States Department of Labor
May 9, 2009        
DOL Home > OALJ Home > USDOL/OALJ Reporter
DOL Home USDOL/OALJ Reporter

LOWER POTOMAC POLLUTION CONTROL PLANT, WAB No. 77-20 (WAB Sept. 30, 1977)


CCASE: LOWER POTOMAC POLLUTION DDATE: 19770930 TTEXT: ~1 [1] [ 77-20.WAB ] TELEGRAPHIC MESSAGE NAME OF AGENCY: U.S. DEPARTMENT OF LABOR OFFICE OF THE UNDER SECRETARY ACCOUNTING CLASSIFICATION: 7165-1-1-M-002-71000-2330-000 DATE PREPARED: 9/30/77 NAME: CRAIG BULGER PHONE NUMBER: 523-9039 TO: ALL PERSONS ON THE ATTACHED LIST DECISION OF THE WAGE APPEALS BOARD RE: LOWER POTOMAC POLLUTION CONTROL PLANT WAB CASE NO. 77-20 PREVAILING WAGE RATES APPLICABLE TO THE CONSTRUCTION OF LOWER POTOMAC POLLUTION CONTROL PLANT FINAL ADVANCED WATER TREATMENT FACILITIES, CONTRACT C-30325, E.P.A. PROJECT NO. C-10440-02, FAIRFAX COUNTY, VA. BEFORE: THOMAS M. PHELAN, BOARD MEMBER THE WASHINGTON BUILDING AND CONSTRUCTION TRADES COUNCIL AND THE BUILDING AND CONSTRUCTION TRADES DEPARTMENT, AFL-CIO, HAVE APPEALED A DECISION BY THE ASSISTANT ADMINISTRATOR, WAGE AND HOUR DIVISION, TO ISSUE BUILDING AND HEAVY WAGE RATES TO APPLY TO CONSTRUCTION OF THE SUBJECT PROJECT. PETITIONERS STATE THAT A RECENT SURVEY OF SEWAGE AND WATER TREATMENT PLANTS DEMONSTRATED THAT ONLY A SINGLE SET OF WAGE RATES HAVE BEEN PAID ON SIMILAR WORK IN FAIRFAX COUNTY IN THE PAST. [1] ~2 THE BOARD FINDS THAT THE DESCRIPTION OF WORK PROVIDED TO THE DEPARTMENT CLEARLY SHOWS THAT BOTH BUILDING AND HEAVY CONSTRUCTION ARE TO BE INCLUDED IN THE PROJECT. WHEN IT IS CLEAR FROM THE NATURE OF THE PROJECT ITSELF IN A CONSTRUCTION SENSE THAT IT IS TO BE CATEGORIZED AS EITHER BUILDING, HEAVY OR HIGHWAY CONSTRUCTION, IT IS NOT NECESSARY TO RESORT TO AN AREA PRACTICE SURVEY TO DETERMINE THE APPROPRIATE CATEGORIZATION OF THE PROJECT. THE ASSISTANT ADMINISTRATOR'S FAILURE TO CONSIDER THE AREA PRACTICE IN THIS CASE WAS THEREFORE NOT IMPROPER. THE AREA PRACTICE WITH RESPECT TO WAGES COULD NOT CONVERT WHAT IS CLEARLY ONE CATEGORY OF CONSTRUCTION INTO ANOTHER CATEGORY. HOWEVER, WAGE RATE INFORMATION FROM THE SURVEY MAY BE USED TO ESTABLISH PREVAILING BUILDING OR HEAVY WAGE SCHEDULES TO BE USED IN THE COUNTY FOR OTHER BUILDING OR HEAVY PROJECTS. SINCE BOTH [2] ~3 [3] BUILDING WORK AND HEAVY WORK ARE INVOLVED IN THIS PROJECT, THE ASSISTANT ADMINISTRATOR IS CORRECT IN ISSUING WAGE SCHEDULES FOR BOTH TYPES OF WORK. THE BOARD HAS NOT BEEN ASKED TO REVIEW, AND THEREFORE HAS NOT REVIEWED, THE SCHEDULES ISSUED TO DETERMINE WHETHER THEY ARE CORRECT. BY ORDER OF THE BOARD Craig Bulger, Executive Secretary [] [3]



Phone Numbers