SAFEGUARD MISSILE SITES, MONTANA, WAB No. 70-02 (WAB Oct. 8, 1970)


CCASE: SAFEGUARD MISSILE SITES, MONTANA DDATE: 19701008 TTEXT: ~1 [1] UNITED STATES DEPARTMENT OF LABOR WAGE APPEALS BOARD In the Matter of WAGE APPEALS United Associations' request for CASE NO. 70-02 review of application by U.S. Army Corps of Engineers of Wage Decisions AK-2,204 and AK-2,202 to a pipeline project serving Safeguard Missile Sites in Montana, Solicitation No. DATED: October 8, 1970 DACA 67-71-B-0001, as amended [DECISION AND ORDER] This case came on to be heard before the Wage Appeals Board, Oscar Smith, Chairman, and Stuart Rothman, Member, October 8, 1970. The United Association, the Laborers International Union, the U.S. Corps of Engineers, the Associated General Contractors, and the Office of the Solicitor appeared and made statements. After consideration of the record before the Board, the material presented at the hearing, and the arguments and position of the participants, the Board issues the following Decision and Order: There shall be added to Wage Decision No. AK-2,204, All Heavy and Highway Construction, the following classification for this project: Plumbers-Fitters $6.11 (Basic Hourly Rate) .35 (H & W) .20 (Pensions) .03 (App. Tr.) In making this determination, the Board is satisfied that there is work which requires the payment of the Plumbers-Fitters rate, but the [1] ~2 [2] Board is not determining the specific division between work to be performed by the Plumber-Fitter and the work to be performed by the Laborer-Pipelayer. The Board notes and calls the attention of the Corps of Engineers to the requirement that the work is to be performed in accordance with area practice, as required by the applicable rules and regulation of the Department of Labor. SO ORDERED Oscar S. Smith, Chairman Stuart Rothman, Member WAGE APPEALS BOARD [2]



Phone Numbers