Vermillion Cliffs--Grand Staircase-Escalante National Monument
BLM
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Calf Creek Falls Cedar Mesa Ruin Mule Deer in the Book Cliffs Mountains Simpson Springs Pony Express Station Cedar Mesa
Monticello Field Office
More>Utah>Monticello>Daneros Mining Plan Operation
Print Page
Utah Energy Corporation Daneros Mine Project

Daneros Mine Project Environmental Assessment

The Daneros Mine Project Environmental Assessment is posted below.  A 30-day comment period begins March 13, 2009.

Please submit all written comments no later than April 13, 2009 to:

Bureau of Land Management
Monticello Field Office
PO Box 7
365 North Main Street
Monticello Utah 84535
Attn: Ted McDougall

Daneros Mine Project EA

Appendix A - ID Team Analysis Record Checklist

Appendix B - Biological Survey Report

Appendix C - Scoping Report

Appendix D - Transportation Policy

Appendix E - Storm Water Pollution Prevention Plan

Appendix F - Baseline Soil Report

Appendix G - Hydrology Report

Appendix H - Noxious Weed and Invasive Plant Control Plan

Appendix I - Waste Rock Pile Cover Thickness

Appendix J - Mine Acid Producing Potential Sampling Program

Appendix K - Figures