projects > flow monitoring along the tidal caloosahatchee river and tributaries west of franklin locks
Flow Monitoring Along the Tidal Caloosahatchee River and Tributaries West of Franklin Locks
Monitoring stations established thru this project are designed as part of a larger network needed for the Caloosahatchee River and tributaries that should remain in place long-term (~10 years). Data from monitoring stations included in this project will be evaluated during the third year of data collection in order to assess viability and need for changes. If all stations were to be discontinued at the end of the third year of data collection (FY-2010), the last year (2011) will be devoted to finalizing records for the previous years and for the removal of all structures and instrumentation. Work Plans |
U.S. Department of the Interior, U.S. Geological Survey
This page is: http://sofia.usgs.gov/projects/index.php?project_url=flow_caloo
Comments and suggestions? Contact: Heather Henkel - Webmaster
Script last updated: 04 February 2009 @ 10:18 AM by BJM. Record creator: BJM. Record last updated by: BJM.