Networx Statement of Work (SOW) Status

The Networx Statement of Work (SOW) Status report presents a high level overview of GSA/agency/contractor progress in satisfying agency SOW requirements.

Statements of Work are used:

  1. To satisfy agency requirements that are not contained on the Networx contracts – no contract line item (CLIN) listed, or
  2. To satisfy agency requirements that are contained in the Networx contract and not priced - (CLIN exists and not priced), or
  3. To satisfy agency requirements for a unique management solution that may contain both priced and un-priced requirements.

The first column lists the agencies as either “Large” or “Other.” The second column provides a brief description of the type of service contained in the SOW.

Columns three through nine lists the sequential steps of the SOW process as follows:

3. Selected Acquisition – The Networx program consists of two parallel contracts – Networx Universal and Networx Enterprise. “U” indicates Universal. “E” Indicates Enterprise. The SOW must specify which Networx contract will be used;

4. GSA First Review – Consists of a review of the SOW requirements and an initial determination as to whether the requirements are In-Scope with the selected Networx contract;

5. Agency Revision Process – In the event the GSA First Review identified scope and/or other issues, the SOW is returned to the agency for editing. Note: SOWs containing no issues can be determined to be In-Scope and submitted to the contractor as outlined in Step Seven;

6. GSA Final In-Scope – In the event the SOW was returned to the agency for corrections and re-submitted to GSA, GSA performs a second review of the SOW requirements for In-Scope determination;

7. Pending Contractor Proposal – The agencies In-Scope SOW is sent to each Networx Universal or Enterprise (not both) contractor. Each contractor may respond to the SOW by submitting a proposal to the agency;

8. Under Agency Evaluation – The Networx contractor’s proposal is under agency evaluation;

9. Award Complete – The agency has determined, based on its selection criteria, the Networx contractor to fulfill the SOW requirements.