Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback

Structures

Prefabricated Bridge Elements and Systems

"Get in, get out, stay out."

Why Use?

Prefabricated bridge elements and systems may be manufactured on-site or off-site, under controlled conditions, and brought to the job location ready to install. Using prefabricated bridge elements and systems facilitates meeting key public needs:

  • Minimizes traffic impacts of bridge construction projects
  • Improves construction zone safety
  • Makes construction less disruptive for the environment
  • Makes bridge designs more constructible
  • Increases quality and lowers life-cycle costs

Traffic and environmental impacts are reduced, constructibility is increased, and safety is improved because work is moved out of the right-of-way to a remote site, minimizing the need for lane closures, detours, and use of narrow lanes. Prefabrication of bridge elements and systems can be accomplished in a controlled environment without concern for job-site limitations, which increases quality and can lower costs. Prefabricated bridge elements especially tend to reduce costs where use of sophisticated techniques would be needed for cast-in-place, such as in long water crossings or higher structures, like multi-level interchanges.

Prefabricated bridge elements and systems is one of FHWA's Priorities, Market-Ready Technologies and Innovations. More information is available at the R&T Web site www.fhwa.dot.gov/crt

Innovative Projects

Publications

Videos

Events

More Information

Contact

Vasant Mistry
Office of Bridge Technology
202-366-4599
E-mail Vasant

 
 
This page last modified on 11/05/08
 

FHWA
United States Department of Transportation - Federal Highway Administration