Volpe National Transportation Systems Center

 

CLOSED. This Solicitation Closed May 1, 2007. DO NOT APPLY.
DOT logo
U.S. Department of Transportation
Office of the Secretary
of Transportation
DTRT57-07-R-SBIR
 
DOT Program Solicitation for
Small Business Innovation Research

VIII. Research Topics

Previous Section | Program Contents | Next Section


Phase I research topics for DOT Operating Administrations are listed below. These topics indicate the specific areas for which proposals are to be considered for acceptance by DOT. The topics are not listed in any order of priority. Each proposal must respond to one (and only one) topic as described in this section. A proposal may, however, indicate and describe its relevance to other topics.

View Full Topic Descriptions


Federal Highway Administration (FHWA)
4 Awards
1 07-FH1 DPS Receiver/Demodulator with Location Determination by Time/Phase Difference of Arrival
07-FH2 Time-Resolved Microwave Thermoreflectometry for Corrosion Detection in Concrete
2 07-FH3 Tools to Improve Real-Time Highway Construction Quality Control
3 07-FH4 Quick Highway Incident Detection and Incident Warning Systems
Federal Motor Carrier Safety Administration (FMCSA)
1 Award
4 07-FM1 Safety Belt Devise or Technology to Increase Usage by Commercial Motor Vehicle Drivers and their Passengers
Pipeline and Hazardous Materials Safety Administration (PHMSA)
4 Awards
07-PH1 Pipeline Safety:
  1. Nanotechnology tools for Internal Corrosion of Pipelines
  2. Development of Risk Protocol for LNG Facilities
  3. Design Optimization for Soft Crack Arrestors
07-PH2 Hazardous materials:
  1. Technologies Applicable to Hazardous Materials Transportation
National Highway and Traffic Safety Administration
2 Awards
5 07-NH1 Development of Consolidated Six-Degree-of-Freedom Kinematics Sensor Array for Impact Testing
5 07-NH2 Non Contact Roof Measurement System for Use in Dynamic Rollover Testing
Federal Transit Administration
5 Awards
6 07-FT1 Linear Induction Motors (LIM) Door Closer for Rapid Rail Vehicles
6 07-FT2 Hybrid Propulsion for Rail Locomotives
6 07-FT3 Methods for Upgrading Existing Automatic Train Control (ATC) Systems
6 07-FT4 Very High Speed Third Rail Insulator Cleaning
6 07-FT5 Better/Faster Braking Systems
Federal Railroad Administration
3 Awards
7 07-FR1 Locking Mechanism for Rotating Seats
7 07-FR2 Quick-release Emergency Egress Panel on Cab Car End Doors
7 07-FR3 Continued Communication Capability in the Event of a Train-line Break in Passenger Train

1 Phase I may be up to $100,000 and Phase II $375,000
2 Phase I may be up to $100,000 and Phase II $720,000
3 Phase I may be up to $100,000 and Phase II $700,000
4 Phase I may be up to $100,000 and Phase II $300,000 to $500,000
5 Phase I may be up to $100,000 and Phase II $300,000
6 Phase I may be up to $100,00 and Phase II $500,000
7 Phase I may be up to $75,000 and Phase II $250,000