[Header] PHMSA - U.S. Department of Transportation - Pipeline and Hazardous materials Safety Adminis
spacer
For the Public
 
Hazmat Safety Community Pipeline Safety Community Media | Congress
 
Doing Business with PHMSA
 
 
PHMSA Home
Acceptable Level of Risk
General Term
for regulations and special permits is established by consideration of risk, cost/benefit and public comments. Relative or comparative risk analysis is most often used where quantitative risk analysis is not practical or justified. Public participation is important in a risk analysis process, not only for enhancing the public's understanding of the risks associated with hazardous materials transportation, but also for insuring that the point of view of all major segments of the population-at-risk is included in the analyses process. Risk and cost/benefit analysis are important tools in informing the public about the actual risk and cost as opposed to the perceived risk and cost involved in an activity. Through such a public process PHMSA establishes hazard classification, hazard communication, packaging, and operational control standards.
Source:

Hazardous Materials Safety term

Careers  |  Contact Us  |  No Fear  |  Privacy Policy  |  FOIA  |  Accessibility  |  FAQs  |  Web Policies  |  Site Map  |  Download Acrobat