image used for layout image used for layout image used for layout image used for layout image used for layout image used for layout image used for layout image used for layout
US Department of Transportation Home Layout Image Home Button Site Index Button Issue Briefs Button FOIA Button Employment Button image used for layout
About the FRA
Railroad Safety
Freight Rail
Passenger Rail
Research & Development
Press Room
Legislation, Regulation, Litigation.
Civil Rights & Accessibility


DOT Site Search:

FRA-only 

The Federal Railroad Administration Freight train traveling on bridge over lagoons
in tropical landscape.

Positive Train Control (PTC) systems are integrated command, control, communications, and information systems for controlling train movements with safety, security, precision, and efficiency. PTC systems will improve railroad safety by significantly reducing the probability of collisions between trains, casualties to roadway workers and damage to their equipment, and over speed accidents. The National Transportation Safety Board (NTSB) has named PTC as one of its "most-wanted" initiatives for national transportation safety. PTC systems are comprised of digital data link communications networks, continuous and accurate positioning systems such as NDGPS, on-board computers with digitized maps on locomotives and maintenance-of-way equipment, in-cab displays, throttle-brake interfaces on locomotives, wayside interface units at switches and wayside detectors, and control center computers and displays. PTC systems may also interface with tactical and strategic traffic planners, work order reporting systems, and locomotive health reporting systems. PTC systems issue movement authorities to train and maintenance-of-way crews, track the location of the trains and maintenance-of-way vehicles, have the ability to automatically enforce movement authorities, and continually update operating data systems with information on the location of trains, locomotives, cars, and crews. The remote intervention capability of PTC will permit the control center to stop a train should the locomotive crew be incapacitated. In addition to providing a greater level of safety and security, PTC systems also enable a railroad to run scheduled operations and provide improved running time, greater running time reliability, higher asset utilization, and greater track capacity. They will assist railroads in measuring and managing costs and in improving energy efficiency. Pilot versions of PTC were successfully tested a decade ago, but the systems were never deployed on a wide scale. Other demonstration projects are currently in the planning and testing stages. Deployment of PTC on railroads is expected to begin in earnest later this decade.

Mutlimedia :

  PowerPoint Brief - Positive Train Control Overview   pdf format 562K

  PowerPoint Brief - Positive Train Control Technical Overview pdf format 1.004MB

Click the icon to download Acrobat Reader here:  

layout image

About Us | Website Polices | Plug-ins | Privacy Policy | Site Index | Common Questions | Contact Us | Home | OIG Hotline


Federal Railroad Administration, U.S. Department of Transportation, 1200 New Jersey Avenue, SE, Washington, DC 20590