skip navigational links United States Department of Labor
May 8, 2009   
DOL Home > ESA > OWCP > DEEOIC > EEOICP Final Circulars
DOL Home

EEOICP Final Circulars

Click on the links below to view the Circulars

07-01 Department of Energy (DOE) facility description of Line 1 (Division B) at the Iowa Ordnance Plant. (Replaced by Circular 07-03).
07-02 Clinton Engineer Works
07-03 This Circular replaces Circular No. 07-01, Department of Energy (DOE) facility description of Line 1 (Division B) at the Iowa Ordnance Plant.
07-04 This Circular expands the covered time period for the Trinity Nuclear Explosion Site for the remediation conducted in 1952 and 1967.
07-05 De-listing of three AWEs
07-06 This Circular expands the covered time period for the Coors Porcelain Company in Golden, Colorado.
07-07 Linde Ceramics Plant
07-08 This Circular alters the covered time period for the Tocco Induction Heating Division in Cleveland, OH.

 

 

 

 

 

 

Phone Numbers