Printer-Friendly Version
|
Quick Links |
|
|
|
IV. Davis-Bacon Wage Surveys
In order to submit wage data for a survey, do I have to have worked within the survey time frame?
No. The survey time frame is the period in which the projects had to have been active. The work performed by a company on such projects could be before or after the survey time frame, but the data submitted must reflect work already performed before the data submission cut-off date.
|