Home > Buildings & Plants > Portfolio Manager Overview > Eligibility Requirements

Criteria for Rating Building Energy Performance

All types of commercial and institutional buildings can use Portfolio Manager to track and benchmark energy use over time. Certain types of buildings can go a step further and benchmark energy use relative to the national population of similar buildings. In Portfolio Manager this benchmark is called a national energy performance rating and is expressed on a scale of 1 to 100. In order to be eligible for an energy performance rating, buildings must meet several criteria. These criteria can be organized as followed:

Building Designation

The energy performance rating system compares your building to its peer group of similar buildings in the national population. This peer group is identified through the Commercial Building Energy Consumption Survey (CBECS), a nationally representative survey conducted quadrennially by the Department of Energy. In order to identify your building's group of peers, more than 50% of the building's gross floor area (excluding parking lots and garages) must be defined by one of the following space types:

The remainder of your building may be occupied by other space types in Portfolio Manager, subject to the following restrictions:

  1. The combined floor area of all enclosed and not enclosed parking structures cannot exceed the total gross floor area of the building (where the gross floor area of the building excludes the parking floor area).
  2. The combined floor area of all Computer Data Centers cannot exceed 10% of the total gross floor area of the building (where the gross floor area of the building excludes the parking floor area).
  3. The combined floor area of any space classified as “Other” (e.g. library, restaurant, cafeteria, etc.) cannot exceed 10% of the total gross floor area of the building (where gross floor area of the building excludes the parking floor area).
  4. The combined floor area of all Multifamily Housing spaces cannot exceed 10% of the total gross floor area of the building (where the gross floor area of the building excludes the parking floor area).
  5. If your building is a Hospital (i.e. if Hospital accounts for more than 50% of your space) the only other spaces that may be entered are:
    1. Computer Data Center
    2. Other
    3. Parking
    4. Swimming Pool
  6. If your building is a Municipal Wastewater Treatment plant it cannot be combined with any other space types.

Operating Characteristics

Portfolio Manager asks you to enter data for key operating characteristics for each space in your building. There are minimum and maximum thresholds for these values. These limits are designed to make sure that your building falls into an operation pattern consistent with that of the peer group used for comparison. In order to be eligible to receive a national energy performance rating:

  1. Gross floor area of the building (excluding garage and parking lot) must be at least 5,000 square feet, with two exceptions:
    1. Hospitals must be at least 20,000 square feet
    2. Bank/Financial Institution must be at least 1,000 square feet
  2. All buildings, except K-12 School, must be in operation at least 30 hours per week
  3. All Office, Bank/Financial Institution, and Courthouse spaces must contain one personal computer or one cash register
  4. Each space must contain at least one worker during the main shift (does not apply for Hospitals, K-12 Schools,)
  5. The user must enter at least 11 consecutive months of data for all of the operating characteristics
  6. If the building is a K-12 School, include an input for the number personal computers and walk-in refrigeration units
  7. If the facility is a Hospital, it must include:
    1. At least 16 licensed beds but no more than 1,510 beds and
    2. No more than 40 floors
  8. Residence halls/Dormitories must contain at least 5 rooms
  9. If the facility is a Hotel, it must include:
    1. At least one room
    2. A valid input for the number of commercial refrigerator/freezer units
  10. Municipal Wastewater Treatment Plants must have:
    1. Average daily wastewater flow greater than 0.6 million gallons per day (MGD)
    2. Average influent biological oxygen demand (BOD5) level greater than 30 and less than 1000
    3. Average effluent BOD5 level greater than 0

Summary Table PDF (132KB)
The requirements listed above are summarized in a numerical table for quick reference.

Energy Data

To receive an energy performance rating, you must enter energy meters that account for all energy use (regardless of fuel type) in the building. To ensure accurate analysis, EPA applies limitations on this data which are as followed:

  1. There must be at least 11 full consecutive calendar months of energy data for all active meters. If there are multiple meters, there must be 11 consecutive and overlapping months.
  2. No individual electrical meter entry can be for a period longer than 65 days.