The content of the ARM website is available to any browser, but for the best experience we highly recommend you upgrade to a standards-compliant browser such as Firefox, Opera or Safari.
VIEW CART
primary link menu HOME SITE INDEX PEOPLE
skip to main content ABOUT ARMABOUT ACRFSCIENCESITESINSTRUMENTSMEASUREMENTSDATAPUBLICATIONSEDUCATIONFORMS

Page Contents:

Baseline Change Request Guidelines

Introduction

Baseline Change Requests (BCR) are used by the ARM Infrastructure as a process to provide configuration control and for formally requesting and documenting changes within the ARM Infrastructure.

Configuration Control: BCRs are required for changes to instruments, data systems, data processes, data streams, measurement methods and facilities and helps ensure that all aspects of the ARM Infrastructure are consulted prior to implementing changes. Seemingly minor changes can have significant repercussions throughout the Program and therefore, NO change to an operational instrument, computer, facility or other system, can or will be made without an approved BCR.

Prioritize resources: The BCR process allows the Infrastructure to determine the resources required to make the change and prioritize activities based on importance, impact and projected cost.

Not a Suggestion Box: BCRs should be concise and well thought out before submission. Please note that the BCR process is not a "suggestion box".

Submit a BCR

BCRs are submitted at:

http://bcr.arm.gov/

and should include:

BCR Process

BCR Flowchart

BCR Flowchart
Click on the image for a larger version.