Jump to main content.


Fiscal Year 2008 NPL Program Snapshot



NPL Federal Facilities by Agency
(Final and Deleted)


Pie chart: Corp of Eng - 1% (1), Army - 24% (42), DLA - 3% (5), Air Force - 22% (37), Navy - 31% (54), Natl Guard - 1% (1), DoE - 12% (21), Other - 6% (11)
*Other Federal Agencies include: Coast Guard (1), DOI (2), DOT (1), EPA (1), FAA (1), NASA (2), SBA (1), USDA (2)

Top of page


Status of NPL Federal Facilities

NPL Status Number of Federal Facilities Number of Private Sites Federal Facility % of NPL Universe
Final 157 1,100 12.5%
Deleted 15 315 4.5%
Total* 172 1,415 10.8%

*Total number of Federal Facilities and private sites on the NPL is 1,581

Top of page


Regional Rrecentage Distribution of FY 2008 Accomplishments

Bar graph showing precentage of Regional Accomplishments

Top of page


NPL Current Site Work

Bar Graph Showing Current Site Work: Ongoing Removals – 82, Active TAGs – 16, Ongoing RI/FS Actions – 398, Ongoing RDs – 51, Ongoing RAs – 204, Ongoing O&M – 105

Top of page


NPL Completed Site Work

Bar Graph Showing Completed Site Work: Removed Comps – 833, Decision Documents – 1,638, RD Comps – 846, RA Comps – 862, OPS – 41, 5 Year Reviews – 278, Partial Deletions – 19

Top of page


NPL Federal Facility Cleanup Pipeline

Federal Facility Cleanup Pipeline: NPL Facilities – 172, Facilities with IAGs – 158, Active RABs/SSABs – 119, Final Remedy Selected – 73, All Construction Completed – 61, Deleted Facilities – 15

Top of page


Interagency Agreements

% of NPL Federal Facilities with Completed IAGs
Federal Agencies that have not acheived 100% of their IAGs/FFAs:
Agency # w/ IAG Total # Percent
Navy 52 54 96.3%
Army 40 42 95.2%
Air Force 32 37 86.5%
Dept. of Energy 20 21 95.2%
Dept. of Agriculture 1 2 50.0%
Dept. of Transportation 0 1 0.0%
SBA* 0 1 0.0%
Coastal Guard 0 2 50.0%
Federal Agencies that have acheived 100% of their IAGs/FFAs:
Agency # w/ IAG Total # Percent
DLA 5 5 100.0%
Coast Guard 1 1 100.0%
Dept. of Interior 2 2 100.0%
National Guard 1 1 100.0%
USACE 1 1 100.0%
EPA 1 1 100.0%
FAA 1 1 100.0%

*This SBA site (Cal West Metals) is Deleted from the NPL

Top of page


Remedial Actions and Removal Actions with Institutional Controls at NPL Facilities

Bar Graph Showing Remedial and Removal Actions with ICs: Remedial Actions – 563, Removals – 43
Note: There are 147 NPL Federal Facilities with Institutional Controls.

Top of page


Status of Remedies Requiring Monitoring at NPL Facilities
Total Number of Sites with Completed 5 Year Reviews = 137
(Latest Protectivness Statment at Site)

Bar Graph:  Protective-65,  Will be Protective at Remedy Complete-18,  Protective in the short term-30,  Not protective-9,  Protectivness Deferred-10, Complete-8
Note: In the second quarter of FY 2005, EPA implemented a change in the way 5 Year Review data is recorded.

Top of page


Environmental Indicators Status for Final NPL at Federal Facilities
(Total Facilities = 172)


Bar Graph  Human Exposure Controlled – 148, Human Exposure Insufficient Data – 13, Human Exposure Not Controlled – 9,  Groundwater Controlled – 109, Groundwater Insufficient Data - 26, Groundwater Not Controlled – 30, Not a GW Site – 6
Note:  62% of Facilities have both Human Exposure and Groundwater controlled; 
4% of Facilities have neither Human Exposure nor Groundwater controlled

Top of page


NPL Federal Facilities Which are Sitewide Ready for Anticipated Use

Bar Graph Showing NPL Federal Facilities with Site Wide RAUs: 28

Top of page


Notes:

Top of page

[ FFRRO Home ]
Web page maintained by Federal Facilities Restoration and Reuse Office
Comments: comments_ffrro@epa.gov


Local Navigation


Jump to main content.