Jump to main content.


Duke Power

(PESP Partner since December 1994)
Edison Electric Institute member

Duke Power uses an integrated approach for managing vegetation. This process involves careful pruning, selective herbicidal application and occasional tree removal. Through their commitment to PESP, Duke Power is working with the Edison Electric Institute Vegetation Management Taskforce to implement a strategy for reducing pesticide risk. Their strategy specifically addresses integrated vegetation management in their rights-of-way transmission lines.

Member Contacts

Brian Morris, Supervisor Forester
Duke Power
PO Box 1006 (EC-13S)
Charlotte, NC  28201-1006
704-382-6915
704-382-6907 (fax)
bmorris@duke-energy.com

EPA Liaison to this Member

Jim Downing
U.S. EPA/OPP/BPPD
1200 Pennsylvania Ave NW (7511P)
Washington, DC 20460-0001
703-308-9071
703-308-7026 (fax)
downing.jim@epa.gov

View this Member's

globe image as paragraph bullet

PESP Strategy  (Edison Electric Institute Strategy for its members)

Exit EPA Disclaimer Website

PESP Sector Designation

Rights-of-Way


Local Navigation


Jump to main content.