Photograph of Colorado Mountain Range
BLM
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Mesa Autumn Wild Horses Oil Rig Boaters Photograph of Ruin
Colorado
BLM>Colorado>Information>NEPA>White River >FY 2005 Completed Actions
Print Page
FY 2005 Completed Actions

Completed Actions for FY 2005– (July 21, 2008)
FY 2005 Log of CEs/DNAs - (October 12, 2005)

  
CE = Categorical Exclusion
DNA = Documentation of NEPA Adequacy and Land Use Plan Conformance
EA = Environmental Assessment
EIS = Environmental Impact Statement


For more information on these projects, contact the White River Field Office NEPA Coordinator at 970-878-3800 or email wrfomail@blm.gov with the requested file name and NEPA number.
 
White River Field Office
220 East Market Street
Meeker,
Colorado 81641

All Field Office NEPA registers contain current EIS and EA actions. However, certain registers do not include CEs and DNAs . Inquiries about these documents can be obtained by contacting the appropriate Field Office NEPA Coordinator, or by visiting their Field Office public room.

*The listing of WSA (Wilderness Study Area), ACEC (Area of Critical Environmental Concern), WSR (Wild and Scenic River), HMA (Herd Management Area), or CPNHD (Canyon Pintado National Historic District) in this column indicates that the proposed action is within that special designation area.

 

NEPA NUMBER
PROJECT NAME
WSA, ACEC, WSR, HMA,
CPNHD*
APPLICANT
STATUS
Smith Allotment Renewal

T1N R90W Sec 19, 20, 30
Rio Blanco County
 
H. J. Crowell
Completed 2/28/05

CO-WRFO-03-187-EA
Appendices (1.2Mb)
Figure 1-1 (140Kb)
Figure 2-1 (270Kb)
Figure 2-2 (190Kb)
Figure 2-3 (480Kb)
Figure 3-1 (190Kb)
Figure 3-2 (80Kb)
Figure 3-3 (10.9Mb)
Figure 3-4 (12.6Mb)
Figure 3-5 (1.1Mb)
Figure 4-1 (1.6Mb)

Figure Four GAP
T4S R98W Sec 1, 2, 7-29, 35, 36
Garfield and Rio Blanco County
 
EnCana Oil and Gas ( USA ) Inc
Completed 12/03/04
Permit Renewal Raley R. Allotment
T2S R93W Sec 14
Rio Blanco County
 
Rob Raley
Completed 10/01/04
Cox and Cox Grazing  Permit Renewal
T2N R100W Sec 1-36
Rio Blanco County
 
Wade and Shirley Cox, Karl Cox Estate
Completed 5/15/05
Yahoo Prescribed Fire
T1N R98W Sec 2, 3, 10, 11, 14, 15
Rio Blanco County
 
USDI, Bureau of Land Management - White River Field Office
Completed 10/20/04
Riata NOS #299-(23-2,23-1, 27-1, 27-2), 399-14-1
T2S R99W Sec 23, 27
T3S R99W Sec 14
Rio Blanco County
 
Riata Energy, Inc
Completed 10/20/04
Left Fork 6502 Surface Pipeline
T2S R99W Sec 14-16
Rio Blanco County
 
EnCana Gathering Services
Completed 10/25/04
APD #8815C P18 397(E-P006)
T3S R97W Sec 18
Rio Blanco County
 
EnCana Oil and Gas ( USA ) Inc
Completed 10/25/04
APD #8603C C06 497 (DW-P001)
T4S R97W Sec 6
Rio Blanco County
 
EnCana Oil and Gas ( USA ) Inc
Completed 10/13/04
Bass Yellow Creek Pipeline
T1S R98W Sec 1
Rio Blanco County
 
Dominion Gas Ventures
Completed 11/08/04
Ryan Gulch Gathering System
T1S R97W Sec 31,32, T1S R98W Sec 33, T2S R97W Sec 6, 7, T2S R98W Sec 4, 9, 16, 20, 28, 29
Rio Blanco County
 
Williams Production RMT CO
Completed 11/19/04
Pipeline for the 8613B & 8610D

T4S, R96W Sec 29
Rio Blanco County
 
EnCana Gathering Services
Completed 11/19/04
APDs for (3) Evergreen wells
 
T4S, R104W Sec 1, 12
Rio Blanco County
 
Evergreen Operating Corp.
Completed 10/07/04
Shell Frontier to drill hydro geologic core holes
 
T1S, R98W, Sec 31, T1S, R99W, Sec 36, T2S, R98W, Sec 6, T2S, R99W, Sec 1
Rio Blanco County
 
Shell Frontier Oil and Gas
Completed 11/12/04
Application for installation of 2-12 foot tall repeater sites
 
T4S R97W Sec 18
T1N R99W Sec 18
Rio Blanco County
 
EnCana Gathering Services (USA) Inc
Completed 11/19/04
Smith Gulch Res. 2 (0076) Feeder Ditch

T1N R96W Sec 1
WSA
Cross Slash Four Ranch
Completed 12/03/04
2 NOS's. Well # 23-16 and 24-6

T1S R104W Sec 23, 24
Rio Blanco County
 
Robert L. Bayless, Producer LLC
Completed 10/14/04
6 APD's for Chevron
T2N R103W Sec 12-15, 24
Rio Blanco County
 
Chevron Production Company
Completed 11/16/04
Texas Camp Ponds 2004
 
T3S R100W Sec 7,19 T3S R101W Sec 12, 23
Rio Blanco County
 
Bryant 1991 Trust
Completed 04/18/05
Rube-Clarkson Fence
 
T2S R103W Sec 15
Rio Blanco County
 
Twin Buttes Ranch Co.
Completed 01/25/05
Exxon 87-3
 
T2S R97W Sec 12
Rio Blanco County
 
ExxonMobil Production Corp
Completed 11/05/04
Yellow Jacket Fence, Cattleguards, & Catchments
 
T2N R92W Sec 16, 17
Rio Blanco County
 
Davidson Yellow Jacket Ranch, Ltd.
Completed 7/14/05
 
Riata 4 NOS's
 
T2S R99W Sec 23, 26, 27
Rio Blanco County
 
Riata Energy, Inc.
Completed 12/10/04
3 new Cathodic Protection Stations
 
T2N R100W Sec 9 T2N R103W Sec 7
Rio Blanco County
 
Northwest Pipeline Corp
Completed 10/25/04
Independence Unit T52X-29G1
 
T3S R96W Sec 29
Rio Blanco County
 
ExxonMobil Production Corp
Completed 12/03/04
APDs for seven wells; Figure Four GAP
T4S, R98W, Sec.1
Rio Blanco County
 
EnCana Oil and Gas ( USA ) Inc
Completed 12/13/04
Evergreen 5 wells, access, waterline
 
T4S R103W Sec 23
Rio Blanco County
 
Evergreen Resources Inc
Completed 12/03/04
Access Road to Calamity Ridge Unit Wells
T1N R100W Sec 9, 10, 14
Rio Blanco County
 
EnCana Gathering Services (USA) Inc
Completed 10/25/04
Repeater Site for Field Operations
T2S R96W Sec 17
Rio Blanco County
 
EnCana Gathering Services ( USA ) Inc
Completed 12/17/04
Rio Blanco Hill Communication Site
T4S R94 W Sec 8, 9, 16
Rio Blanco County
 
Union Telephone Co
Completed 12/17/04
Chevron Field injection lines
T2N R102 W Sec 18
T2N R103W Sec 12, 15
Rio Blanco County
 
Chevron Production Company
Completed 12/03/04
Villard Ranch Grazing Permit Renewal
T3N R100W Sec 19-21, 31
T3N R101W sec 22-27, 35-36
T2N R100W Sec 7
T2N R101W Sec 1, 12
T4N R99W Sec 1-36
T3N R99W Sec 2-4
Rio Blanco and Moffat Counties
ACEC
Villard Ranch
Completed 9/20/05
Additional Expansion for Greasewood Compressor Station
 
T2S R96W Sec 5
Rio Blanco County
 
Xcel Energy (Public Service)
Completed 05/24/05
Evergreen proposes to drill gas well CSF 42-6-5-103
 
T5S R103W Sec 6
Rio Blanco County
 
Evergreen Operating Corp.
Completed 11/19/04
Evergreen/Pioneer proposes to drill CSF 14C-13-4S-104
 
T4S R104 Sec 13
Rio Blanco County
 
Evergreen Operating Corp.
Completed 12/17/04
Darrell W Camilletti proposes to upgrade road for wagon trail
 
T3N R91W Sec 31
Rio Blanco County
 
Darrell W Camilletti
Completed 1/18/05
ExxonMobil Production Corp proposes Little Hills Cathodic Protection Station
 
T2S R97W Sec 11
Rio Blanco County
 
ExxonMobil Production Corp
Completed 12/17/04
BLM proposes prescribed burn on Dry Ridge
 
T2S R97W Sec 29-32; T3S R97W Sec 6, 7
T3S R98W Sec 1, 12-14, 23, 24
Rio Blanco County
 
USDI, Bureau of Land Management - White River Field Office
Completed 05/20/05
Power line extensions to Chevron Field

T.2N., R.103W sec. 13, SW¼NE, E½NW¼, NW¼SE¼, sec. 15., E½NE¼, SE¼NW¼, NE¼SW¼.
Rio Blanco County
 
Chevron Production Company
Completed 3/11/05
Chevron Production Company proposed to drill well #82X
 
T2N R103W Sec 13
Rio Blanco County
 
Chevron Production Company
Completed 01/27/05
Chevron proposes water injection lines
 
T2N R102W Sec 18
Rio Blanco County
 
Chevron Production Company
Completed 01/28/05
ExxonMobil proposes T73X-19G pipeline
 
T2S R 95W Sec 19
Rio Blanco County
 
ExxonMobil Production Corp
Completed 02/02/05
ExxonMobil proposes APD for well #6G4
 
T2S R 97W Sec 8
Rio Blanco County
 
ExxonMobil Production Corp
Completed 01/20/05
EnCana proposes APD for well # 5-4A-1100
 
T1S R100W Sec 5
Rio Blanco County
 
EnCana Oil & Gas (USA) Inc
Completed 2/04/05
BLM WRFO plan for Normal Year Fire Rehabilitation
Resource Area Wide
Garfield, Moffat and Rio Blanco Counties
 
USDI, Bureau of Land Management - White River Field Office
Completed 04/28/05
Moon Lake proposes a power line  to Northwest Pipeline

T2N R100W Sec 4, 9
Rio Blanco County
 
Moon Lake Electric
Completed 3/11/05
North Dry Fork Water Developments

T1N R 97W Sec 11
Rio Blanco County
 
Mike Lopez, Shults LLP
Completed 4/20/05
Boies Prescribed Fire
T3S R98W Sec 8, 9, 16, 17, 19, 20, 29-31
Rio Blanco County
 
USDI, Bureau of Land Management - White River Field Office
Completed
2/23/05
Independence Unit Pipeline
T2S R96W Sec 19 & 30; T3SR96W Sec 18-20; T2S R97W Sec 36; T3S R97W Sec 1, 12 & 13
Rio Blanco County
 
ExxonMobil Production Corp
Completed 3/18/05
Shell Oil Company proposes 15 hydrology/monitoring well pads
T1S R99W Sec 34; T2S R99W Sec 1-3; T2S R98W Sec 4, 6, 10, 15, & 21
Rio Blanco County
HMA
Shell Oil Company
Completed 7/13/05
 
EnCana proposes Pipeline from Mallard 4804 Well to American Soda
T1S R97W Sec 18 & 19
Rio Blanco County
 
EnCana Oil & Gas (USA) Inc
Completed 3/03/05
EnCana to build 5 wells on one pad; Figure Four GAP
T4S R98W Sec 15
Rio Blanco County
 
EnCana Oil and Gas ( USA ) Inc
Completed 02/02/05
Chevron Production Company proposes to drill 4 new wells
T2N R103W Sec 15 & 22
Rio Blanco County
 
Chevron Production Company
Completed 3/04/05
BEPCO proposes to drill 5 new wells
T1N R97W Sec 30; T1N R98W Sec 25 & 29
Rio Blanco County
 
BEPCO Operating Company
Completed 3/10/05
May 05 Oil & Gas Lease Sale
Varies; Moffat and Rio Blanco Counties
 
USDI, Bureau of Land Management - Colorado State Office
Completed 2/16/05
Development three springs
 
T4N, R97W, Sec 35 NESE; T4S, R99W, Sec 31 SESW; T1S, R94W, Sec 14, NESE Moffat, Rio Blanco and Garfield Counties
 
USDI, Bureau of Land Management - White River Field Office
Completed 4/28/05
Proposes Gathering pipelines for gas and produced water
 
T2S, R97W, sections 11, 12, 13, & 14; T2S, R96W, sections 7, & 8
Rio Blanco County
 
ExxonMobil Production Corp
Completed 4/26/05
Williams Northwest Pipeline proposes to build a Repeater site for pipeline
 
T. 1N., R. 97W sec. 29, SW
Rio Blanco County
 
Williams Northwest Pipeline
Completed 09/26/05
ExxonMobil proposes well # Piceance Creek Unit T25X-25G
 
T. 1 S., R. 97 W., NWSW sec.25
Rio Blanco County
 
ExxonMobil Production Corp
Completed 4/28/05
West Douglas Herd Area Amendment
West of Douglas Creek , Rangely Colorado
Rio Blanco and Garfield Counties
WSA
USDI, Bureau of Land Management - White River Field Office
Initiated 1/1/05
Draft Decision Issued
ExxonMobil Pipeline T87X-3G to Love Ranch

T2S R97W Sec 3, 4, 9
Rio Blanco County
 
ExxonMobil Production Corp
Completed 5/19/05
Dawson Geophysical proposes fourteen seismic lines

Piceance Creek Basin
Rio Blanco and Garfield Counties
ACEC, HMA
Dawson Geophysical Seismic
Completed 08/17/05
ExxonMobil Oil Corporation proposes for well pad T35X-11G

T2S, R97W, NESW sec.11
Rio Blanco County
 
ExxonMobil Production Corp
Completed 5/18/05
Cross Slash Four Ranch proposes Little Rancho/13 Mile Pit Reservoirs
T 2S R 94W  Sec 18 NWSE, SWSE, SESW; T 2S R 95W Sec 22 SWSW,  Sec 28 NWNE, NENW, Sec 29 NENE,  NWSE, NESW
Rio Blanco County
 
Cross Slash Four Ranch
Completed 7/13/05
Chevron Production Co proposes 11 new NOS’s
.
Rangely Oil Field, Rangely CO
Rio Blanco County
 
Chevron Production Company
Completed 6/02/05
Application permit to drill Ryan Gulch 43-15-298
T2S R98W Sec 15
Rio Blanco County
 
Williams Production Company
Completed 5/19/05
KGH Operating Company proposes to drill two wells
T1S R104W Sec 26
Rio Blanco County
 
KGH Operating Company
Completed 5/24/05
Canyon Gas Resources propose a connecting pipeline for CDX Big Ridge Central Delivery Point

T1S R101W sec 18 and 19
Rio Blanco County
 
Canyon Gas Resources
Completed 5/24/05
Modification to Questar’s Greasewood Compressor Station
T2S R96W Sec. 8, lot 3, 6
Rio Blanco County
 
Questar Pipeline Company
Completed 6/01/05
 
Cow Creek Access Road
T4S R94W Sec 33, 34; T4S R95W Sec 1, 12, 13
Rio Blanco County
 
Williams Exploration & Production
Completed 7/20/05
APD Liberty Unit T18X-9G
T3S, R96W, Sec 9
Rio Blanco County
 
ExxonMobil Production Corp
Completed 7/13/05
Grazing Permit Renewal
 
T3N, R103W, Sec 2-4, 9-12; T4N, R103W, Sec 34, 35
Moffat County
 
Vista Del Sol
Completed 08/10/05
Pipeline Connection to Well 4-7-1-1

T1S, R101W, Sec 7; T1S, R102W, Sec 12
Rio Blanco County
CHPD, HMA
Locin Oil Company
Completed 6/07/05
Grazing Permit Renewal

T3S, R94W, Sec 28, 29, 32, 33
Rio Blanco and Garfield Counties
 
Howard Robinson
Completed 09/13/05
Big Trujillo Wash Recreation Site Improvements
T1N, R102W, Sec 7
Rio Blanco County
ACEC
USDI, Bureau of Land Management - White River Field Office
Completed 08/10/05
Application to drill 5 Wells

T1S, R104W, Sec 13, 23, 27; T2S, R103W, Sec 6
Rio Blanco County
 
Robert Bayless
Completed 6/17/05
 
FERC/ TransColorado Expansion Project
T2S, R96W, Sec 8
Rio Blanco County
 
TransColorado
Completed 6/07/05
Application to drill Ryan Gulch 32-17 well
T2S R98W Sec 17
Rio Blanco County
HMA
Williams Production RMT Company
Completed 6/22/05
Application to drill T62X-11G1, -G2, -G3, -G4,-G5 (5) wells

T2S R97W Sec 2, 11
Rio Blanco County
 
ExxonMobil Production Corp
Completed 6/29/05
 
Temporary Use Permit for extra work space along pipeline Right Of Way
T1N R101 W Sec 4, 5, 8; T2N R100W Sec 2, 7-9, 12, 18, 22, 23; T2N R103W Sec 22, 25; T2S R101W Sec varies; T3S R101W Sec 5, 33; T3S R102W Sec 13, 25, 35; T4S R102W Sec 25
Rio Blanco County
CPHD, ACEC, HMA
Williams Northwest Pipeline
Completed 6/30/05
Repeater Site
T4S R96W Sec 6, 31, 32
Rio Blanco and Garfield Counties
 
EnCana Oil & Gas (USA) Inc
Completed 6/22/05
Application to drill eight wells
T2S, R99W, Sec 22, 26, 27, 34;  T3S R99W Sec 1, 2
Rio Blanco County
 
Riata Energy
Completed 09/21/05
Application to drill the Yankee Gulch 31-8 well

T3S R98W Sec 8
Rio Blanco County
 
Williams Production RMT Company
Completed 7/01/05
Application to drill Gilsonite Hills 24-2 well

T1S, R104W, Sec 24
Rio Blanco County
 
KGH Operating Co
Completed 7/08/05
August 05 Oil & Gas Lease Sale
Varies; Moffat and Rio Blanco Counties
 
USDI, Bureau of Land Management - Colorado State Office
Completed 5/25/05
Connecting pipeline

T4S, R102W, Sec 25
Rio Blanco County
 
Canyon Gas Resources
Completed 7/27/05
Stake Springs powerline to Well #22-6 re-route
T2S R98W Sec 6
Rio Blanco County
HMA
WREA, Williams Prod. Co
Completed 6/02/05
Application to drill Puddin Ridge 13-12 and 33-10 wells

T5S R98W Sec 12
Garfield County
 
Williams Production RMT Company
Completed 7/15/05
Application to drill Ryan Gulch 31-20-298, 31-2-298 and 34-198 wells

T2S, R98W, Sec 2, 19, 20
Rio Blanco County
HMA
Williams Production RMT Company
Completed 7/19/05
Application to drill four wells and one collection station.

T2N, R103W, Sec 15
Rio Blanco County
 
Chevron Production Company
Completed 07/28/05
Application to drill the Fawn Creek 13-1-398 well

T3S R98W Sec 1
Rio Blanco County
 
Williams Production RMT Company
Completed 08/03/05
Sprague Gulch Access

T3S, R95W, Sec 18
Rio Blanco and Garfield Counties
 
EnCana Oil & Gas (USA)
Completed 07/26/05
12 inch pipeline with related facilities
T5S, R103W, Sec 29, 30, 32-34
Garfield County
 
Canyon Gas Resources
Completed 9/28/05
Application to drill; two well pads with access roads
T1N R98W Sec 28, 36
Rio Blanco County
HMA
BEPCO Operating Company
Completed 08/02/05
Water Injection line

T2N, R103W, Sec 9
Rio Blanco County
 
Chevron Production Company
Completed 08/02/05
Fossil Excavation
T5S, R101W, Sec 7, 18
Garfield County
ACEC
Western Interior Paleontological Society
Completed 08/11/05
Pipeline hook-ups for William’s Wells
T1S, R98W, Sec 19, 29-30, 32-33, 35-36; T2S, R98W, Sec 1-2, 6, 9, 12, 15, 17, 20-22, 28, 33
Rio Blanco County
 
Bargath Inc / Williams Production RMT Company
Completed 09/09/05
Application Permit to Drill for  wells #1, #2
T1S R96W SWNW Sec.23 (#1); T2S R95W SENW Sec.15 (#2)
Rio Blanco County
 
XTO Energy Inc.
Completed 09/21/05
Application Permit to Drill for wells Love Ranch Fed. G9, G10
T2S R97W NENW Sec.9 (G9), NENW Sec.9 (G10)
Rio Blanco County
 
ExxonMobil Production Corp
Completed 08/26/05
Erosion Control Structures

T2N R97W Sec 6
Rio Blanco County
 
Rio Blanco Water Conservancy
Completed 08/31/05
Proposes construction of flowlines

T2N R103W Sec. 13 & 36
Rio Blanco County
 
Chevron Production Company
Completed 08/25/05
Tamarisk/Russian Olive Treatment - Blacks Gl, White River

T2S R96W, All
Rio Blanco County
 
Bureau of Land Management
Completed 9/9/05