Skip Navigation - Go to main content
A F M link to USDA home page Link to A R S Home page link to CSREES home page A F M Home link to ERS home page link to NASS home page
Search
Browse By Subject

Facilities

Policy & Guidance

Back to Top

FD Policies & Guidance: P&Ps and Manuals

 

Issuance Number    Subject Date
230.1 -ARS Tracking of Hazardous Waste Cleanup Funds 09/25/98
230.0-ARS ARS Safety, Health, and Environmental Management Program 09/01/93
230.0M -ARS Safety, Health and Environmental Management Program 06/24/98
240.3 Physical Protection, Security & Conduct While on REE Facilities 06/23/00
241.2-ARS Real Estate Warrant Program (ARS) 07/03/99
242.1M -ARS ARS Facilities Design Standards 08/07/98
242.2-ARS Facilities Construction Authorities 11/10/98
242.4M -ARS Major Facilities Construction Manual 03/04/98
242.5 -ARS Economic Analysis & Decision for ARS Facility Modernization (ARS) 07/09/98
242.6 -ARS ARS Metric Conversion 08/21/98
242.7 -ARS Value Engineering (ARS) 07/09/98
243.1 Display and Handling of the Flags of the United States, the Department of Agriculture, and the Secretary of Agriculture 01/05/99
243.2 REE Signage Policy 04/19/99
243.3 -ARS Smoking Policy (ARS) 12/17/97
245.1M
245.1
Real Property Manual (ARS)
Real Property Manual (ARS) (directive)
01/09/95
01/09/95
245.2-ARS Furnishings & Household Goods in ARS Controlled Living Quarters 07/28/99
246.1 -ARS Tracking The Disposal Of ARS-Owned Buildings (Including Demolition) 09/18/97
247.0 Establishment of Agency Child Care Centers (ARS) 10/20/92

Top    


                

FD Bulletins

Issuance Number    Subject Date

View On-line

Download Files
00-250 ARS WordPerfect Half-Staffing the U.S. Flag 06/23/00

Top


 

          FD Policy Guidance Memorandums

Issuance Number    Subject Date
PGM -01-001 Facilities Division Policy Memoranda System 08/21/01
PGM-02-002 Guidelines to AFM Cubicle Etiquette - George Washington Carver Center 02/21/02 Revised 08/04/05
PGM-02-003 Budget Estimating Form 02/27/02
PGM-02-004 Six Percent Fee Limitation
Architect-Engineering Services
Contracts and Task Orders
04/16/02
PGM-02-005 Physical Security in ARS Information Technology Restricted Space 07/23/02
PGM-02-006 Payment of Building Permit and Other Construction-Related Fees to State and Local Governments on ARS Construction Projects 09/09/02
PGM-03-001 Guidelines for Separately Priced Line Items in Construction Projects 01/30/2003
PGM-04-001 Commissioning 11/10/2003
PGM-04-002 Implementation of Energy Efficiency and Water Conservation Features on AFM-Managed Products 11/20/2003
PGM-04-003 Implementation of Accessibility Requirements on AFM-Managed Projects 11/20/2003
PGM-04-004 Physical Security Interim Policy 08/27/2004

Top


FD Standard Operating Procedures

Issuance Number Subject Date
View On-line Download Files
FDSOP-04-0001 MS Word Procedures for Area Project Status Meeting 08/11/04
FDSOP-05-001 MS Word Procedure for Pre-Construction Conference Agenda 08/11/04
FDSOP-05-001 Attachments Attachment1:Word doc
Attachment2:Excel doc
08/11/04
FDSOP-05-002 MS Word Procedure to Obtain Deputy Administrator’s Approval for POR/Feasibility Studies 05/04/2005 (Revised)
FDSOP-05-002 Attachments Attachment1:Word doc
Attachment2:Excel doc
05/04/2005 (Revised)
FDSOP-05-003 MS Word Greening the Government 05/04/2005

Top


FCB Standard Operating Procedures

 

Issuance Number    Subject Date
CSOP-01-001 Contract Review Board Procedures 08/21/01
CSOP-02-001 Project Numbering System 10/11/01
CSOP-02-002 Collection Procedures

11/29/01
(Revised)
05/03/02

CSOP-02-002    ARS3261.xls   and    ARS 326-1.xls

CSOP-02-003 Closeout & Archiving Procedures (revised) 11/29/01
(Revised) 10/04/02
CSOP-02-004 Contract and Task Order Award Announcements (Revised) 12/19/01
(Revised)
07/26/02
CSOP-02-005 Posting Solicitations on Fedbizopps 06/07/02
CSOP-02-006 Prior Year Fund Requests 06/11/02
CSOP-03-001 Use of Indefinite Quantity Contracts (IQC) for Architect-Engineer (A-E) Services for Design of Major Construction Projects 09/15/03
CSOP-04-001 Source Selection Procedures for Architect-Engineering Services - Project Specific or Indefinite Quantity Contracts 10/10/03
CSOP-04-002 Invoice Handling Procedures 09/27/04
CSOP-05-001 Retention of SF-330, Architect-Engineer Qualifications 12/08/04
CSOP-05-002 Compliance Verification of DOL Labor Standards Requirements
12/20/04
CSOP-05-003 Memoranda to the File 02/11/05

 

Top


FCB Documents
(Not Listed Above)

The following list of documents are boiler plates to be customized as needed by each user.  They are intended to assist procurement officials in providing a standard document citing a minimum of information.

Issuance Number    Subject Date

View On-line

Download Files
CORAPPTLTR Word Contracting Officer's Representative (COR) Appointment Letter 08/22/01
CRBSGN WordPerfect Contract Review Board Signature Sheet 08/22/01
DRBSGN WordPerfect Design Review Board Signature Sheet 08/22/01
NTPLTR WordPerfect Notification to Proceed 08/22/01
CNTNGLTR WordPerfect Use of Contingency Funds for Changes 08/22/01
BILATMODLTR WordPerfect Cover Letter for Bilateral Modifications 08/22/01
EXECMODLTR WordPerfect Cover Letter for Executed Modifications 08/22/01
CONSTRAWDLTR WordPerfect Cover Letter for Construction Contract Award 08/22/01
ORIENTATION WordPerfect Customer Orientation Agenda 08/22/01


Top

Last Updated: 10/11/2005