MSHA - Code of Federal Regulations - 30 CFR 56.6401
skip navigational links http://www.dol.gov www.msha.gov United States Department of Labor
A to Z Index | Find It! in DOL |            [skip navigational links]     Search MSHA's Website   Search MSHA
 
MSHA - Title 30 CFR
30 CFR § 56.6401

Shunting.

Except during testing--

(a) Electric detonators shall be kept shunted until connected to the blasting line or wired into a blasting round;

(b) Wired rounds shall be kept shunted until connected to the blasting line; and

(c) Blasting lines shall be kept shunted until immediately before blasting.

[58 FR 69596, Dec. 30, 1993]




Back to Top   Back to Top www.msha.gov www.dol.gov


Mine Safety and Health Administration (MSHA)
1100 Wilson Boulevard, 21st Floor
Arlington, VA 22209-3939
Phone:    (202) 693-9400
Fax-on-demand: (202) 693-9401
Technical (web) questions: Webmaster
On-line Filing Help: MSHAhelpdesk@dol.gov
or call (877) 778-6055

Contact Us