|
|
|
|
|
|
Curecanti National Recreation Area
Management
|
|
|
|
|
|
|
DESIGNATION
Curecanti National Recreation Area was established in 1965.
CURECANTI RESOURCE PROTECTION STUDY
In 1999 Congress directed NPS to conduct a study to assess area resources within and surrounding the NRA, and to identify and recommend a variety of practicable alternatives and tools to protect those resource values and the character of the land.
more information »
GENERAL MANAGEMENT PLAN
This plan, created in 1997, provides Black Canyon and Curecanti with a long-range management program.
Download » (14.2 MB pdf)
|
COMPREHENSIVE PRESERVATION STUDY TRAIN RELATED RESOURCES
The purpose of this plan is to create a stewardship guide for preserving the rolling stock assets and railroad bridge located at the Cimarron Rail Exhibit within Curecanti.
Download » (14.6 MB pdf)
|
CENTENNIAL INITIATIVE 2016
In celebration of the 100th anniversary of the National Park Service in 2016, America invites the world to discover the meaning of national parks to their lives and inspires people to both experience and become devoted to these special places.
more information »
|
|
SUPERINTENDENT'S COMPENDIUM
The Superintendent's Compendium specifies designations, closures, permit requirements and other restrictions imposed under discretionary authority.
Download » (139k pdf)
|
| |
|
|
|
|
|
|
|
|
Did You Know?
Three historic towns were abandoned and flooded when Blue Mesa Reservoir was created: Iola, Cebolla and Sapinero.
|
|
|
|
Last Updated: January 28, 2009 at 10:31 EST |