Return to Library

Tulsa District
Library Document Information

Project Name: John Redmond Feasibility Study
Document Name: REVIEW PLAN - JOHN REDMOND DAM AND RESERVOIR, KANSAS, INTERIM FEASIBILITY STUDY
Information: The purpose of the study is to identify the best options for providing, aquatic ecosystem restoration, water quality improvements, water supply conservation and improvement, and other related water resources needs within the study area. The decision document will be an interim feasibility report. At this time, the National Environmental Policy Act process is expected to result in an Environmental Assessment, not an Environmental Impact Statement.

Purpose of Review Plan. This review plan outlines the level of review needed for the study, the timing of reviews, and the qualifications of the reviewers. The approved review plan will be included as a component of the Project Management Plan.

  • Review Plan Approval -- 468Kb

  • Web Link:  
    Document Date: November 2008
    Author U.S. ARMY CORPS OF ENGINEERS, TULSA DISTRICT
    Added to the Library December 15, 2008
    Electronic Size: 284 Kb
    Document Format: pdf


    Point of Contact: Public Affairs Office, (918) 669-7366
    Database-driven page.
    Date Viewed: January 08, 2009