Federal Register Documents

-04/24/09  Inclusion of Expiration Dates in Presidential Permits for International Border Crossings; Department of State; Public Notice 6590; Washington, DC
-03/23/09  Receipt of Request To Amend the Presidential Permit for an International Bridge on the U.S.-Mexico Border Near McAllen, TX, and Reynosa, Tamaulipas, Mexico; Federal Register; (Volume 74, Number 54)
-01/28/09  Notice of Receipt of Application for a Presidential Permit for an International Rail Bridge on the U.S.-Mexico Border near Laredo, Texas, and Nuevo Laredo, Tamaulipas, Mexico; (Volume 74, Number 17)
-12/08/08  Issuance of a Presidential Permit Authorizing the Construction, Operation and Maintenance of the Otay Mesa East Border Crossing Near San Diego, CA, at the International Boundary Between the U.S. and Mexico; Washington, DC
-12/08/08  Presidential Permit: Otay Mesa East Border Crossing
-09/19/08  Notice of Receipt of Application To Amend Presidential Permit for an International Bridge on the U.S.-Mexico Border at Brownsville, TX and Matamoros, Tamaulipas, Mexico
-01/24/08  Notice of Receipt of Application for a Presidential Permit To Construct, Operate, and Maintain a New Border Crossing Facility
-11/20/07  Presidential Permit 07-2: San Luis Livestock Border Crossing
-09/04/07  Notice of Receipt of Application for Colombia Rail Bridge
-08/03/07  Notice of Finding of No Significant Impact from Construction of a New Livestock Crossing near San Luis, Arizona
-07/06/07  Notice of Issuance of Presidential Permit To Construct, Operate and Maintain a New Commercial Land Border Crossing Near San Luis, Arizona
-06/13/07  Presidential Permit 07-1: San Luis II Border Crossing
-02/23/07  Interpretative Guidance on Executive Order 11423
-06/07/05  Presidential Permit 05-2: Mariposa Port of Entry
-05/24/05  Procedures for Issuance of a Presidential Permit Where There Has Been a Transfer of the Underlying Facility, Bridge or Border Crossing for Land Transportation
-03/16/05  Presidential Permit 05-01: Tornillo-Guadalupe New International Bridge
-10/01/04  Presidential Permit 04-1: Brownsville West Rail Bypass International Bridge
-04/30/04  Executive Order 13337: Issuance of Permits With Respect to Certain Energy-Related Facilities and Land Transportation Crossings on the International Boundaries of the United States
-04/21/03  Presidential Permit: Aggregate Products Conveyor Belt, 2003
-08/31/99  Presidential Permit 99-02: Cox Communications tunnel
-07/23/99  Presidential Permit 99-01: Anzalduas Bridge
-10/12/97  Presidential Permit 97-01: Port of Brownsville/Matamoros Bridges
-04/12/96  Presidential Permit 96-01: Eagle Pass II/Piedras Negras II Bridge
-05/11/95  Presidential Permit: Laredo Union Pacific railroad bridge, 1995
-10/07/94  Presidential Permit: Laredo/Nuevo Laredo Bridge IV, 1994
-10/07/93  Presidential Permit: Los Tomates/Matamoros Bridge, 1993
-03/12/90  Presidential Permit: Colombia/Laredo Bridge, 1990
-06/30/87  Presidential Permit: Ysleta/Zaragoza Bridge, 1987
-05/04/82  Presidential Permit: Presidio Ojinaga Bridge 1976 As Amended May 4, 1982
-08/22/79  Presidential Permit: Donna/Rio Bravo Bridge, 1979
-12/20/78  Presidential Permit: Pharr/Reynosa Bridge, 1978
-12/20/78  Presidential Permit: Mission Reynosa Bridge 1978
-07/02/76  Presidential Permit: Presidio Ojinaga Bridge, 1976
-01/18/74  Presidential Permit: los Indios/Lucio Blanco Bridge, 1974