Otros Estudios
- The Third Locks Project, Junio 1941
- Increasing the Water Supply of the Panama Canal, Junio 1962
- Fill Embankment Across Trinidad Arm of Gatun Lake, Marzo 1963
- Fill Structure Across Trinidad Arm of Gatun Lake, Junio 1963
- Projections of Panama Canal Commodity Flows, Transits, and Tolls through 1985 *, Junio 1972
- Panama Canal Traffic and Revenue Study 1978 - 2000 *, Enero 1978
- Environmental Report - Gaillard Cut Widening, Marzo 1987
- The Risk of Land Slides in Gaillard Cut, Octubre 1988
- Final Report of the Commission for the Study Alternatives to the Panama Canal, Septiembre 1993
- Development of a Growth Strategy - Phase I, Junio 1996
- Panama Canal Growth Strategy - Phase I, Junio 1996
- A Strategy for Growth, Junio 1996
- Sensitivity Analysis of Panama Canal Traffic Demand, Julio 1996
- New Evaluation Procedures for a New Generation of Water-Related Projects, Diciembre 1996
- Panama Canal Commission Long Term Transportation Forecast, Agosto 1997
- Concepts Study for Canal Alternatives, Septiembre 1997
- Marketing Strategy Development - Booz Allen (1998), Marzo 1998
- Design Earthquakes for the East Area of Canal Basin, Agosto 1999
- Design Earthquakes for the evaluation of seismic hazard - Gatun Dam, Agosto1999
- Trinidad Pumped Storage Reservoir Concept, Junio 2001
- Preliminary Report on the Seismic Adequacy of the Gatun Spillway, Julio 2001
- Effect of Deepening on Gaillard Cut Slopes, Abril 2002
- Geotechnical Advisory Board Meetings 1993-2002, Abril 2002
- Feasibility Study Lock Water Reclamation Project (Panama Canal), Julio 2002
- Universal Congress of the Panama Canal, Septiembre 1997