USGS
South Florida Information Access
SOFIA home
Help
Projects
by Title
by Investigator
by Region
by Topic
by Program
Results
Publications
Meetings
South Florida Restoration Science Forum
Synthesis
Information
Personnel
About SOFIA
USGS Science Strategy
DOI Science Plan
Education
Upcoming Events
Data
Data Exchange
Metadata
projects > baseline hydrologic data collection along the i-75/state road 29 corridor in the big cypress national preserve

Baseline Hydrologic Data Collection along the I-75/State Road 29 Corridor in the Big Cypress National Preserve

photo of small lake
Project Investigators: Elizabeth Hittle, Rick Solis

Project Start Date: 2005 End Date: 2009

Recent Funding: (FY08) ENP CESI, USGS GE PES, (FY07) ENP CESI, USGS GE PES, (FY06) ENP CESI, USGS GE PES


Summary

The objectives of this study for the 2006 water year are to develop a program of surface water flow monitoring across I-75 and SR 29.

The objectives of this study for the 2006 water year are to develop a program of surface water flow monitoring across I-75 and SR 29 in the I-75 corridor from Snake Road west to SR 29 and SR 29 from I-75 south to USGS site 02291000 Barron River Near Everglades, Florida. Quarterly discharge measurements will be accomplished along both reaches to begin to assess hydrologic flow patterns and evaluate the feasibility of creating a stage-discharge/index-velocity relationship for this area.

Work Plans

Project Summaries

Data

Metadata



| Disclaimer | Privacy Statement | Accessibility |

U.S. Department of the Interior, U.S. Geological Survey
This page is: http://sofia.usgs.gov/projects/index.php?project_url=75_29_flows
Comments and suggestions? Contact: Heather Henkel - Webmaster
Script last updated: 04 February 2009 @ 10:18 AM by BJM. Record creator: BJM. Record last updated by: KP.