Current Projects |
Project |
Type |
Title |
Planned End Date |
Surface-Water Stations |
LTM |
|
Ongoing |
Ground-Water Stations |
LTM |
|
Ongoing |
Water-Quality Stations |
LTM |
|
Ongoing |
Cape Cod Toxics Research Site |
CCS/
CTS |
|
Ongoing |
Connecticut River Basin NAWQA |
NAW |
|
Ongoing |
National Water-Use |
WU |
|
Ongoing |
New England Coastal Basins NAWQA |
NAW |
|
Ongoing |
Stormwater-Pollution Prevention at Army Reserve Facilities |
STM |
|
Ongoing |
Water Resources Studies, IRP MMR |
CCS/
CTS |
|
Ongoing |
Water Resources Studies, Impact Area MMR |
CCS/
CTS |
|
Ongoing |
Big River Wetlands |
BWR
|
|
2012 |
Assabet River TMDL Water Quality |
WWN |
|
2009 |
Blackstone River TMDL Water Quality |
WWN |
|
2009 |
Taunton River TMDL Water Quality |
WWN |
|
2009 |
Ipswich Basin LID |
STM |
|
2009 |
RI Contributing Areas |
WS |
|
2009 |
RI Water Use |
WU |
Water use and availability in Rhode Island |
2009 |
Mercury Continental Gradient |
CTS |
|
2008 |
Plymouth-Carver Aquifer |
BWR |
|
2008 |
Sustainable Yield |
WS/ BWR |
|
2008 |
RI Streamflow Statistics |
STF |
Methods for estimating streamflow statistics
in Rhode Island: Phase I data review and data collection |
2008 |
National Highway Runoff Model |
STM |
|
2008 |
Blackstone River Basin Water Resources |
BWR |
Evaluation of water resource management
alternatives for the Blackstone River Basin, Rhode Island
and Massachusetts |
2007 |
Defining Nutrient Fluxes to Estuaries |
WWN |
|
2007 |
Fish Communities |
STF |
|
2007 |
I495 Scenarios |
BWR |
Assessment of water-management alternatives
in the Interstate-495 Corridor Massachusetts: Effects of
innovative alternatives at the local scale |
2007 |
Massachusetts Streamflow |
STF |
|
2007 |
Neponset PCBs and Neponset River Estuary |
SED |
|
2007 |
Pawcatuck Optimization |
BWR |
|
2007 |
RISQA |
SED |
|
2007 |
Sudbury River Basin Water Resources |
BWR |
|
2007 |
Bankfull Regional Curves |
STF |
|
2006 |
Cape Cod Wastewater Alternatives |
CCS/
WWN/
CTS |
|
2006 |
Recently Completed Projects |
Project |
Type |
Title |
Completion Date |
Hunt (HAP) RI ZOC |
BWR |
|
2007 |
National Water Indicators |
WU |
|
2007 |
Nutrient Criteria |
WWN |
|
2006 |
Perennial-Intermittent Streams |
STF |
|
2006 |
RI Coastal Ground Water |
BWR |
|
2006 |
Firm Yield I |
WS |
|
2006 |
Firm Yield II |
WS |
|
2006 |
Assabet Sediment Phosphorus |
SED |
|
2005 |
Charles River Atlas |
BWR |
|
2005 |
Lower Mystic River Basin Sediment |
SED |
|
2005 |
Pushpoint Sampling |
CTS |
|
2005 |
Robowell |
WWN |
|
2005 |
Street Sweeping |
STM |
|
2005 |
Assabet Basin Ground-Water |
BWR |
|
2004 |
Big River Optimization |
BWR |
|
2004 |
Cape Cod Emerging Contaminants |
WWN
/CCS |
|
2004 |
Great Sandy Bottom Pond |
WS |
|
2004 |
Ipswich Scenarios |
WS |
|
2004 |
Lower Cape Cod Water Resources |
WS/
BWR
/CCS |
|
2004 |
Mid-Cape Water Resources |
WS/
BWR
/CCS |
|
2004 |
Neponset Sediment and PCBs |
SED |
|
2004 |
North Coastal Basin Sediment |
SED |
|
2004 |
Phosphorus Type Curves |
WWN |
|
2004 |
RI Contributing Areas in Complex Settings |
WS |
|
2004 |
Streamflow and Habitat |
STF |
|
2004 |
Usquepaug-Queen HSPF Modeling |
BWR |
|
2004 |
Loads to Cape Cod Ponds |
CCS |
Ground-water nutrient transport to estuaries and fresh-water ponds, Cape Cod National Seashore, Massachusetts: A flow-path and geochemical simulation approach |
2003 |
MA Dam Removal |
SED |
|
2003 |
National Highway Runoff Synthesis |
STM |
|
2003 |
Nyanza Diffusion Sampling |
CTS |
|
2003 |
Public-Supply Springs |
WS |
|
2003 |
Upper Charles Optimization |
BWR |
|
2003 |