Docket
No. |
Date |
Title |
Order No. 719
(RM07-19-000) |
October 17, 2008 |
Wholesale Competition in Regions with Organized Electric Markets (Final Rule) |
Order No. 718
(RM08-8-000) |
October 16, 2008 |
Ex Parte Contacts and Separation of Functions Advisory (Final Rule) |
Order No. 717
(RM07-1-000) |
October 16, 2008 |
Standards of Conduct for Transmission Providers (Final Rule) |
Order on Rehearing and Clarification
(RM04-7-002) |
July 17, 2008 |
Market-Based Rates for Wholesale Sales of Electric Energy, Services by Public Utilities (Order on Rehearing and Clarification) |
Order No. 890-B
(RM05-17-000 & RM05-25-000) |
June 23, 2008 |
Preventing Undue Discrimination and Preference in Transmission Service |
Order No. 711
(RM08-10-000) |
May 15, 2008 |
Submissions to the Commission upon Staff Intention to Seek an Order to Show Cause (Final Rule) |
RM08-8-000 |
May 15, 2008 |
Ex Parte Contacts and Separation of Functions (NOPR) |
PL08-2-000 |
May 15, 2008 |
Obtaining Guidance on Regulatory Requirements |
Order No. 697-A
(RM04-7-001) |
April 21, 2008 |
Market-Based Rates for Wholesale Sales of Electric Energy,
Services by Public Utilities (Order on Rehearing and Clarification) |
RM07-1-000 |
March 21, 2008 |
Standards of Conduct for Transmission Providers (NOPR) |
Order
No. 890-A |
December 28, 2007 |
Preventing Undue Discrimination and Preference in Transmission Service (Order on Rehearing and Clarification) |
Order
No. 704 (RM07-10-000) |
December 26, 2007 |
Transparency Provisions of Section 23 of the Natural Gas Act (Final Rule) |
Order No. 697
(RM04-7-000) |
June 21, 2007 |
Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities (Final Rule) |
Order
No. 890
(RM05-17-000 & RM05-25-000) |
February 16, 2007 |
Preventing Undue Discrimination and Preference in Transmission Service
(Final Rule) |
Order No. 690
(RM07-6-000) |
January 9, 2007 |
Interim Rule on Standards of Conduct for Transmission Providers (see Standards of Conduct for Transmission Providers section for more detail) |
Order
No. 2006-B
(RM02-12-002) |
July 20, 2006 |
Standardization of Small Generator Interconnection
Agreements and Procedures (Order on Clarification) |
Order
No. 2006-A
(RM02-12-001) |
November 22, 2005 |
Standardization of Small Generator Interconnection
Agreements and Procedures (Order on Rehearing) |
Order
No. 2003-C |
June 16, 2005 |
Standardization of Generator Interconnection
Agreements and Procedures, Order on Rehearing
(Final Rule) |
Order
No. 2006 |
May 12, 2005 |
Standardization of Small Generator
Interconnection Agreements and Procedures (Final
Rule) |
Order
No. 2004-C |
December 21, 2004 |
Standards of Conduct for Transmission Providers (see Standards of Conduct for Transmission Providers section for more detail)
(Final Rule) |
Order
No. 2003-B |
December 20, 2004 |
Standardization of Generator Interconnection
Agreements and Procedures, Order on Rehearing
and
Directing Compliance (Final Rule) |
Order
No. 2004-B |
August 2, 2004 |
Standards of Conduct for Transmission
Providers (see Standards of Conduct for Transmission Providers section for more detail) |
Order
No. 2004-A |
April 16, 2004 |
Standards of Conduct for Transmission
Providers (Order on Rehearing) (Final Rule) (see Standards of Conduct for Transmission Providers section for more detail) |
Order
No. 2003-A |
March 5, 2004 |
Standardization of Generator Interconnection
Agreements and Procedures (Order on Rehearing)
(Final
Rule) |
Order
No. 2004 |
November 25, 2003 |
Standards of Conduct (Final Rule) (see Standards of Conduct for Transmission Providers section for more detail) |
Order
No. 2003 |
July 24, 2003 |
Standardization of Generator Interconnection
Agreements and Procedures (Final Rule) |
Order
No. 637-B
|
July 26, 2000 |
Order Denying Rehearing Concerning
Regulation of Short-Term Natural Gas Transportation
Services (Final Rule) |
Order
No. 637-A |
May 19, 2000 |
Order on Rehearing, Rehearing of
Short-term Natural Gas Transportation Services,
and Regulation of Interstate Natural Gas Transportation
Services (Final Rule) |
Order
No. 637 |
February 9, 1999 |
Regulation of Short-term Natural
Gas Transportation Services, and Regulation of
Interstate
Natural Gas Transportation Services (Final Rule) |
Order
No. 888-C |
January 20, 1998 |
Order on Rehearing, Denying Otter
Power Co. Rehearing Request |
Order
No. 889-B |
November 25, 1997 |
Final Order: Order Denying Rehearing
of Order 889-A in Regards to Open Access Same-Time
Information System & Standards of Conduct (OASIS) |
Order
No. 888-B |
November 25, 1997 |
Order Affirming, With Certain Clarifications,
The Fundamental Calls Made in Order 888-A in Regard
To Promoting Wholesale Competition Through Open
Access Non-discriminatory Services etc |
Order
No. 888-A |
March 4, 1997 |
Reaffirming & clarifying terms
of Order 888 in regards to Open Access Transmission
Services & Recovery of Stranded Costs |
Order
No. 889-A |
March 4, 1997 |
Order Revising Rules Governing Transmission
Information Networks, Standards of Conduct and
Policy
on Posting Discounts consistant with changes under
Order 888-A |
Order No. 889 |
April 24, 1996 |
OASIS: Open Access Same-Time Information
System (formerly Real- Time Information Networks)
and Standards of Conduct (Final Rule) |
Order
No. 888 |
April 24, 1996 |
Transmission Open Access. Promoting
Wholesale Competition Through Open Access Non-discriminatory
Transmission Services by Public Utilities; Recovery
of Stranded Costs by Public Utilities and Transmitting
Utilities (Final Rule) |
Order
No. 636-C |
November 27, 1992 |
Order Denying Rehearing and Clarifying
Orders 636 and 636-A (Final Rule)
|
Order
No. 636-B |
November 27, 1992 |
Order Denying Rehearing and Clarifying
Orders 636 and 636-A (Final Rule)
|
Order
No. 636-A |
August 3, 1992 |
Denying Rehearing in Part, Granting
Rehearing in Part and Clarifying Order 636 (Final
Rule) |
Order
No. 636 |
April 9, 1992 |
Restructuring of Interstate Natural
Gas Pipeline Services (Final Rule) |
Docket
No. |
Date |
Title |
RM05-35-000
|
December 18, 2008 |
Standard of Review for Modifications to Jurisdictional Agreements (Termination of NOPR) |
Order No. 714 (RM01-5-000)
|
September 19, 2008 |
Electronic Tariff Filings (Final Rule) |
RM01-5-000 |
April 17, 2008 |
Electronic Tariff Filings (NOPR) |
Order No. 703
(RM07-16-000) |
November 15, 2007 |
Filing Via the Internet (Final Rule) |
Order No. 702 (RM06-23-000) |
October 30, 2007 |
Critical Energy Infrastructure Information (Final Rule) |
RM07-16-000 |
July 23, 2007 |
Filing Via the Internet (NOPR) |
Order No. 694
(RM07-2-000) |
April 19, 2007 |
Accounting and Reporting Requirements for
Nonoperating Public Utilities and Licensees (Final Rule) |
Order No. 683-A
(RM06-24-001) |
April 9, 2007 |
Critical Energy Infrastructure Information (Final Rule) |
Order No. 690-A
(RM07-6-001) |
March 21, 2007 |
Order on Clarification and Rehearing on Standards of Conduct for Transmission Providers |
PL05-10-000 |
February 15, 2007 |
Criteria for Reassertion of Jurisdiction Over the Gathering Services of Natural Gas Company Affiliates (Clarifying Policy) |
AD07-4-000 |
December 21, 2006 |
Statement of Administrative Policy Regarding
the Process for Assessing Civil Penalties |
Order
No. 683
(RM06-24-000) |
September 21, 2006 |
Critical Energy Infrastructure Information (Final
Rule) |
RM06-23-000 |
September 21, 2006 |
Critical Energy Infrastructure Information (NOPR) |
Order
No. 680
(RM06-19-000) |
July 20, 2006 |
Commission Procedures During Periods of Emergency
Requiring Activation of Continuity of Operations Plan (Final Rule) |
Order
No. 677
(RM06-14-000) |
May 19, 2006 |
Revisions to Record Retention Requirements for
Unbundled Sales Service, Persons Holding Blanket
Marketing Certificates, and Public Utility Market-Based
Rate Authorization Holders (Final Rule) |
Order
No. 675-A
(RM06-2-001) |
May 18, 2006 |
Procedures for Disposition of Contested Audit
Matters (Order on Rehearing and Clarification)
(Final
Rule) |
Order
No. 663-A |
March 17, 2006 |
Revision of Rules of Practice and Procedure Regarding
Issue Identification (Final Rule) |
Order
No. 675 |
February 17, 2006 |
Procedures for Disposition of Contested Audit
Matters (Final Rule) |
Order
No. 670 |
January 19, 2006 |
Prohibition of Energy Market Manipulation (Final
Rule) (see Prohibition of Energy Market Manipulation section for more detail) |
RM05-35-000 |
December 27, 2005 |
Standard of Review for Modifications to Jurisdictional
Agreements |
RM06-5-000 |
November 21, 2005 |
Amendments to Codes of Conduct for Unbundled
Sales Service and for Persons Holding Blanket
Marketing
Certificates |
PL06-1-000 |
October 20, 2005 |
Policy Statement on Enforcement |
RM05-6-000 |
September 16, 2005 |
Commission Authorization to Hold Interlocking
Positions |
Order
No. 662 |
June 21, 2005 |
Critical Energy Infrastructure Information (Final
Rule) |
Order
No. 649 |
August 3, 2004 |
Critical Energy Infrastructure Information (Final
Rule) |
RM01-5-000 |
July 8, 2004 |
Electronic Tariff Filings (NOPR) |
Order
No. 647 |
June 3, 2004 |
Notice Format and Technical Corrections (Final
Rule) |
Order
No. 646
» Appendix
B |
February 11, 2004 |
Quarterly Financial Reporting and Revisions
to the Annual Reports (Final Rule) |
PA02-2-000 |
October 16, 2003 |
Fact-Finding Investigation of Potential Market
Manipulation of Electric and Natural Gas Prices |
EL01-118-000 |
July 25, 2003 |
Investigation of Terms and Conditions of Public
Utility Market-Based Rate Authorization |
Order
No. 630-A |
July 23, 2003 |
Critical Energy Infrastructure Information (Final
Rule) |
RT03-1-001 |
May 8, 2003 |
Order Denying Rehearing; Communications with
Commission-Approved Market Monitors |
Order
No. 630 |
February 21, 2003 |
Critical Energy Infrastructure Information (Final
Rule) |
RT03-1-000 |
January 16, 2003 |
Communications with Commission-Approved Market
Monitors |
PL02-5-000 |
December 20, 2002 |
Statement of Administrative Policy on Separation
of Functions |
Order
No. 623 |
December 21, 2001 |
Amendment to Rules Governing Off-the-Record Communications
(Final Rule) |
RM98-1-002 |
November 9, 2001 |
State-Federal Regional Panels and Clarifying
Order 607 |
Order
No. 607-A |
November 21, 2000 |
Regulations Governing Off-the-Record Communications
(Order on Rehearing and Clarification) |
Order
No. 607 |
September 15, 1999 |
Regulations Governing Off-the-Record Communications
(Final Rule) |
Order
No. 604
|
May 26, 1999 |
Electronic Service of Documents (Final Rule) |
Order
No. 602
|
March 31, 1999 |
Complaint Procedures (Final Rule) |
Order
No. 589 |
August 16, 1996 |
Supplemental Standards of Ethical Conduct for
Employees (Final Rule) |
Order
No. 578 |
April 12, 1995 |
Alternative Dispute Resolution (Final Rule) |
Docket
No. |
Date |
Title |
Order No. 722
(RM08-11-000) |
March 20, 2009 |
Version Two Facilities Design, Connections and Maintenance Reliability Standards (Final Rule) |
RM08-19-000, RM09-5-000 and RM06-16-005 |
March 19, 2009 |
Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability Margins, Total Transfer Capability, and Existing Transmission Commitments and Mandatory Reliability Standards for the Bulk-Power System
(Notice of Proposed Rulemaking)
|
RM05-5-013 |
March 19, 2009 |
Standards for Business Practices and Communication Protocols for Public Utilities (Notice of Proposed Rulemaking) |
Order No. 890-C (RM05-17-004 and RM05-25-004) |
March 19, 2009 |
Preventing Undue Discrimination and Preference in Transmission Service (Order on Rehearing and Clarification) |
Order No. 706-B (RM06-22-000) |
March 19, 2009 |
Mandatory Reliability Standards for Critical Infrastructure Protection Advisory (Order on Clarification) |
Order No. 697-B (RM04-7-005) |
December 19, 2008 |
Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities (Order on Rehearing) |
RM08-16-000 |
November 20, 2008 |
Electric Reliability Organization Interpretations of Frequency Response and Bias and Voltage and Reactive Control Reliability Standards (NOPR) |
RM08-12-000 |
November 20, 2008 |
Western Electricity Coordinating Council Regional Reliability Standard Regarding Automatic Time Error Correction (NOPR) |
RM08-11-000 |
October 16, 2008 |
Version Two Facilities Design, Connections and Maintenance Reliability Standards (NOPR) |
Order No. 716
(RM08-3-000) |
October 16, 2008 |
Mandatory Reliability Standard for Nuclear Plant Interface Coordination (Final Rule) |
Order No. 715
(RM08-5-000)
|
September 19, 2008 |
Revisions to Forms, Statements and Reporting Requirements for
Electric Utilities and Licensees (Final Rule) |
RM06-22-000
|
September 18, 2008 |
Mandatory Reliability Standards for Critical Infrastructure Protection - Order on Proposed Clarification |
Order No. 713
(RM08-7-000) |
July 21, 2008 |
Modification of Interchange and Transmission Loading Relief Reliability Standards; and Electric Reliability Organization Interpretation of Specific Requirements of Four Reliability Standards (Final Rule) |
Order No. 707-A
(RM07-15-001) |
July 17, 2008 |
Cross-Subsidization Restrictions on Affiliate Transactions (Order on Rehearing) |
Order No. 708-A
(RM07-21-001) |
July 17, 2008 |
Blanket Authorization Under FPA Section 203 (Order on Rehearing) |
Order No. 706-A (RM06-22-000) |
May 16, 2008 |
Mandatory Reliability Standards for Critical Infrastructure Protection (Order on Rehearing) |
RM08-7-000
|
April 21, 2008 |
Modification of Interchange and Transmission Loading Relief Reliability Standards; and Electric Reliability Organization Interpretation of Specific Requirements of Four Reliability Standards (NOPR) |
AD08-7-000 |
April 21, 2008 |
Annual Charges Assessments for Public Utilities (NOI) |
RM08-3-000 |
March 20, 2008 |
Mandatory Reliability Standard for Nuclear Plant Interface Coordination (NOPR) |
Order No. 709 |
March 11, 2008 |
Elimination of FERC Form No. 423 (Final Rule) |
RM07-19-000 and AD07-7-000 |
February 22, 2008 |
Wholesale Competition in Regions with Organized Electric Markets (NOPR) |
Order No. 707
(RM07-15-000) |
February 21, 2008 |
Cross-Subsidization Restrictions on Affiliate Transactions (Final Rule) |
Order No. 708 (RM07-21-000) |
February 21, 2008 |
Blanket Authorization Under FPA Section 203 (Final Rule) |
Order No. 706
(RM06-22-000) |
January 18, 2008 |
Mandatory Reliability Standards for Critical Infrastructure Protection (Final Rule) |
RM08-5-000 |
January 18, 2008 |
Revisions to Forms, Statements, and Reporting
Requirements for Electric Utilities and Licensees (NOPR) |
Order
No. 705 |
December 27, 2007 |
Facilities Design, Connections and Maintenance Reliability Standards (Final Rule) |
RM04-7-003
|
December 14, 2007 |
Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities (Clarification) |
RM07-15-000
|
July 20, 2007 |
Cross-Subsidization Restrictions on Affiliate Transactions (NOPR) |
RM07-21-000
|
July 20, 2007 |
Blanket Authorization Under FPA Section 203 (NOPR) |
Order No. 693-A
(RM06-10-001) |
July 19, 2007 |
Mandatory Reliability Standards for the Bulk-Power System (Order on Rehearing) |
Order No. 688-A
(RM06-10-001) |
June 22, 2007 |
New PURPA Section 210(m) Regulations Applicable to Small Power Production and Cogeneration Facilities (Order on Rehearing) |
Order No. 697
(RM04-7-000) |
June 21, 2007 |
Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities (Final Rule) |
Order No. 696
(RM07-11-000)
|
May 18, 2007 |
Applicability of Federal Power Act Section 215 to Qualifying Small Power Production and Cogeneration Facilities
(Final Rule) |
Order No. 689-A
(RM06-12-000)
|
May 17, 2007 |
Regulations for Filing Applications for Permits to Site Interstate Electric Transmission Facilities (Order on Rehearing) |
Order No. 679-B
(RM06-4-002) |
April 19, 2007 |
Promoting Transmission Investment through Pricing Reform (Order on Rehearing) |
RM07-11-000 |
March 16, 2007 |
Applicability of Federal Power Act Section 215 to Qualifying Small Power Production and Cogeneration Facilities (NOPR) |
Order No. 693
(RM06-16-000) |
March 16, 2007 |
Mandatory Reliability Standards for the Bulk-Power System (Final Rule) |
Order No. 667-C (RM05-32-003) |
February 20, 2007 |
Repeal of the Public Utility Holding Company Act of 1935 and Enactment of the Public Utility Holding Company Act of 2005 (Final Order; Order Denying Rehearing) |
Order
No. 890
(RM05-17-000 & RM05-25-000) |
February 16, 2007 |
Preventing Undue Discrimination and Preference in Transmission Service
(Final Rule) |
Order
No. 679-A
(RM06-4-001) |
December 22, 2006 |
Promoting Transmission Investment through Pricing Reform (Order
on Rehearing) |
Order
No. 689
(RM06-12-000) |
November 16, 2006 |
Regulations for Filing Applications for Permits to Site Interstate
Electric Transmission Facilities (Final Rule) |
Order
No. 681-A
(RM06-8-001) |
November 16, 2006 |
Long-Term Firm Transmission Rights in Organized Electricity Markets
(Order on Rehearing) |
RM96-1-027
and RM05-5-001 |
October 25, 2006 |
Standards for Business Practices for Interstate Natural Gas Pipelines
and Public Utilities (NOPR) |
RR06-3-000 |
October 24, 2006 |
Order conditionally accepting 2007 Business Plan and Budget of
the North American Electric Reliability Corporation
approving assessments to fund budgets and ordering
compliance filings |
RM06-16-000 |
October 20, 2006 |
Mandatory Reliability Standards for the Bulk-Power System (NOPR) |
Order
No. 688
(RM06-10-000) |
October 20, 2006 |
New PURPA Section 210(m) Regulations Applicable
to Small Power Production and Cogeneration Facilities
(Final Rule) |
Order
No. 669-B (RM05-34-002) |
July 20, 2006 |
Transactions Subject to FPA Section 203 (Order
on Rehearing of Order No. 669-A) |
Order
No. 2006-B
(RM02-12-002) |
July 20, 2006 |
Standardization of Small Generator Interconnection
Agreements and Procedures (Order on Clarification) |
Order
No. 679
(RM06-4-000) |
July 20, 2006 |
Promoting Transmission Investment through Pricing
Reform (Final Rule) |
Order
No. 681
(RM06-8-000) |
July 20, 2006 |
Long-Term Firm Transmission Rights in Organized
Electricity Markets (Final Rule) |
RM06-12-000 |
June 16, 2006 |
Regulations for Filing Applications for Permits
to Site Interstate Electric Transmission Corridors
(NOPR) |
Order
No. 671-A (RM05-36-001) |
May 22, 2006 |
Revised Regulations Governing Small Power Production
and Cogeneration Facilities (Final Rule) |
RM04-7-000 |
May 19, 2006 |
Market-Based Rates for Wholesale Sales of Electric
Energy, Capacity and Ancillary Services by Public
Utilities (NOPR) |
RM05-25-000
and RM05-17-000 |
May 19, 2006 |
Preventing Undue Discrimination and Preference
in Transmission Service (OATT Reform) (NOPR) |
RM01-10-005 |
May 18, 2006 |
Standards of Conduct for Transmission Providers |
Order
No. 676 (RM05-5-000) |
April 25, 2006 |
Standards for Business Practices and Communication
Protocols for Public Utilities (Final Rule) |
RM06-11-000 |
April 24, 2006 |
Financial Accounting, Reporting and Records Retention
Requirements Under the Public Utility Holding
Company
Act of 2005 (NOPR) |
Order
No. 667-A (RM05-32-001) |
April 24, 2006 |
Repeal of the Public Utility Holding Company
Act of 1935 and Enactment of the Public Utility
Holding
Company Act of 2005 (Final Rule) |
Order
No. 669-A (RM05-34-001) |
April 24, 2006 |
Transactions Subject to FPA Section 203 (Final
Rule) |
Order
No. 672-A |
March 30, 2006 |
Rules Concerning Certification of the Electric
Reliability Organization; and Procedures for the
Establishment, Approval, and Enforcement of Electric
Reliability Standards (Final Rule) |
RM06-14-000 |
February 16, 2006 |
Revisions to Record Retention Requirements for
Unbundled Sale Service, Person Holding Blanket
Marketing
Certificates, and Public Utility Market-Based Rate
Authorization Holders (NOPR) |
Order
No. 674 (RM06-13-000) |
February 16, 2006 |
Conditions for Public Utility Market-Based Rate
Authorization Holders (Final Rule) |
EL06-16-000 |
February 16, 2006 |
Order Revising Market-Based Rate Tariffs and
Authorizations |
RM01-10-005 |
February 16, 2006 |
Interpretive Order Relating to the Standards
of Conduct |
Order
No. 672 (RM05-30-000) |
February 3, 2006 |
Rules Concerning Certification of the Electric
Reliability Organization; and Procedures for the
Establishment, Approval, and Enforcement of Electric
Reliability Standards (Final Rule) |
Order
No. 671 (RM05-36-000) |
February 2, 2006 |
Revised Regulations Governing Small Power Production
and Cogeneration Facilities (Final Rule) |
RM06-8-000 |
February 2, 2006 |
Long-Term Transmission Rights in Markets Operated
by Regional Transmission Organizations and Independent
System Operators |
RM06-10-000 |
January 19, 2006 |
New PURPA Section 210(m) Regulations Applicable
to Small Power Production and Cogeneration Facilities (NOPR) |
Order
No. 669 (RM05-34-000) |
December 23, 2005 |
Transactions Subject to FPA Section 203 (Final
Rule) |
Order
No. 668 (RM04-12-000) |
December 16, 2005 |
Accounting and Financial Reporting for Public
Utilities Including RTOs (Final Rule) |
Order
No. 661-A
(RM05-4-001) |
December 12, 2005 |
Clarification on Interconnection for Wind Energy
rule (Order on Rehearing) |
Order
No. 667
(RM05-32-000) |
December 8, 2005 |
Repeal of the Public Utility Holding Company
Act of 1935 and Enactment of the Public Utility
Holding
Company Act of 2005 (Final Rule) |
Order
No. 2006-A
(RM02-12-001) |
November 22, 2005 |
Standardization of Small Generator Interconnection
Agreements and Procedures (Order on Rehearing) |
RM05-25-000 |
September 16, 2005 |
Preventing Undue Discrimination and Preference
in Transmission Services |
RM01-12-000 |
July 19, 2005 |
Order Terminating Standard Market Design (SMD)
Proceeding |
PL03-3-006
and AD03-7-006 |
July 6, 2005 |
Order Further Clarifying Policy Statement on
Natural Gas and Electric Price Indices |
Order
No. 2003-C |
June 16, 2005 |
Standardization of Generator Interconnection
Agreements and Procedures, Order on Rehearing
(Final Rule) |
RM04-14-001 |
June 16, 2005 |
Reporting Requirement for Changes in Status For
Public Utilities With Market-Based Rate Authority |
Order
No. 661 |
June 2, 2005 |
Interconnection for Wind Energy (Final Rule) |
Order
No. 658 |
May 27, 2005 |
Modification of Nuclear Plant Decommissioning
Trust Fund Guidelines (Final Rule) |
Order
No. 657 |
May 27, 2005 |
Electronic Filing of the Application for Authorization
for the Issuance of Securities or the Assumption
of Liabilities (Final Rule) |
RM05-17-000 |
May 27, 2005 |
Information Requirements for Available Transfer
Capability |
RM05-16-000 |
May 27, 2005 |
Generator Run Status Information |
Order
No. 2006 |
May 12, 2005 |
Standardization of Small Generator
Interconnection Agreements and Procedures (Final
Rule) |
RM05-5-000 |
May 9, 2005 |
Standards for Business Practices
and Communication Protocols for Public Utilities
(NOPR) |
Order
No. 652
(RM04-14-000) |
February 10, 2005 |
Reporting Requirement for Changes
in Status For Public Utilities With Market-Based
Rate Authority (Final Rule) |
Order
No. 2003-B |
December 20, 2004 |
Standardization of Generator Interconnection
Agreements and Procedures, Order on Rehearing
and
Directing Compliance (Final Rule) (see Standards of Conduct for Transmission Providers section for more detail) |
EL01-18-000 |
May 19, 2004 |
Order Clarifying Market Behavior
Rules |
Order
No. 2003-A |
March 5, 2004 |
Standardization of Generator Interconnection
Agreements and Procedures (Order on Rehearing)
(Final
Rule) |
EL01-118-000,
EL01-118-001 |
November 17, 2003 |
Market Behavior Rules |
ER03-854-000,
ER03-854-001 |
July 25, 2003 |
Order Accepting Scarcity Pricing
Proposal |
Order
No. 2003 |
July 24, 2003 |
Standardization of Generator Interconnection
Agreements and Procedures (Final Rule) |
RM02-12-000 |
July 24, 2003 |
Standardization of Small Generator
Interconnection Agreements and Procedures |
PL03-3-000 |
July 24, 2003 |
Policy Statement on Natural Gas and
Electric Price Indices |
RT01-87-001 |
December 19, 2001 |
Commission paves way for optimally
sized Midwest RTO |
RT01-67-000 |
March 28, 2001 |
Order Provisionally Granting RTO
Status to GridFlorida |
Order
Directing Staff Investigation [eLibrary] |
July 26, 2000 |
Investigation of Electric Bulk Power
Markets |
Order
No. 638 [TIF] |
March 9, 2000 |
Errata Notice, Open Access Same
Time Information System and Standards of Conduct
(Final
Rule) |
Order
No. 638 [TIF] |
February 25, 2000 |
Standards of Conduct (Final Rule) |
Order
No. 2000A [TIF]
Bookmarked
version |
February 25, 2000 |
Regional Transmission Organization
(RTO) (Order on
Rehearing) (Final Rule) |
Order
No. 2000 (Complete Version)
» Part
1 of 4
» Part
2 of 4
» Part
3 of 4
» Part 4 of 4 |
December 20, 1999 |
Regional Transmission Organization
(RTO). The final rule requires all public utilities
that own, operate or control interstate electric
transmission to file by October 15, 2000, a proposal
for a Regional Transmission Organization (RTO),
or, alternatively, a description of any efforts
made by the utility to participate in an RTO, the
reasons for not participating and any obstacles
to participation, and any plans for further work
toward participation. The RTOs will be operational
by December 15, 2001 (Final Rule) |
ER98-1438-000 [TIF] |
September 16, 1998 |
Commission Approves Application
of Ten Transmission-owning Public Utilities To
Transfer
Operational Control Of Their Jurisdictional Transmission
Facilities To The Midwest Independent Transmission
Operators |
Order
No. 888-C |
January 20, 1998 |
Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities (Order on Rehearing) |
Order
No. 889-B |
November 25, 1997 |
Open Access Same-Time Information System & Standards of Conduct (OASIS) (Order on Rehearing)
|
Order
No. 888-B |
November 25, 1997 |
Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities (Order on Rehearing)
|
Order
No. 888-A |
March 4, 1997 |
Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities (Order on Rehearing) |
Order
No. 889-A |
March 4, 1997 |
Open Access Same-Time Information System & Standards of Conduct (OASIS) (Order on Rehearing) |
Order No. 889 |
April 24, 1996 |
OASIS: Open Access Same-Time Information
System (formerly Real- Time Information Networks)
and Standards of Conduct (Final Rule) |
Order
No. 888 |
April 24, 1996 |
Transmission Open Access. Promoting
Wholesale Competition Through Open Access Non-discriminatory
Transmission Services by Public Utilities; Recovery
of Stranded Costs by Public Utilities and Transmitting
Utilities (Final Rule) |
ER93-465-006 |
February 10, 1995 |
Order on Rehearing of Policy Issues,
Florida Power and Light |
RM93-19-000 |
November 3, 1994 |
Inquiry Concerning the Commission's
Pricing Policy for Transmission Services Provided
by Public Utilities Under the Federal Power Act |
ER93-465-000 |
February 24, 1994 |
Order on Policy Issues, Florida
Power and Light |
Docket
No. |
Date |
Title |
Order No. 712-B
(RM08-1-002, RM07-4-000 and RM06-21-000)
|
April 16, 2009 |
Promotion of a more efficient capacity release Market (Order on rehearing and clarification) |
Order No. 704-B
(RM07-10-002) |
December 18, 2008 |
Transparency Provisions of Section 23 of the Natural Gas Act (Order on Rehearing and Clarification) |
Order No. 712-A
(RM08-1-001) |
November 21, 2008 |
Promotion of a More Efficient Capacity Release Market (Order on Rehearing) |
RM09-2-000 |
November 20, 2008 |
Contract Reporting Requirements of Intrastate Natural Gas Companies (Notice of Inquiry) |
Order No. 720
(RM08-2-000) |
November 20, 2008 |
Pipeline Posting Requirements under Section 23 under Natural Gas Act (Final Rule) |
RM96-1-029
|
September 18, 2008 |
Standards for Business Practices of Interstate Natural Gas Pipelines (NOPR) |
Order No. 704-A
(RM07-10-001) |
September 18,2008 |
Transparency Provisions of Section 23 of the Natural Gas Act (Order on Rehearing and Clarification) |
Order No. 710-A (RM07-9-001) |
June 20, 2008 |
Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines |
Order No. 712 (RM08-1-000) |
June 19, 2008 |
Promotion of a More Efficient Capacity Release Market (Final Rule) |
Order No. 710 (RM07-9-000) |
March 21, 2008 |
Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines (Final Rule) |
Order No. 686-C
(RM06-7-003) |
January 17, 2008 |
Revisions to the Blanket Certificate Regulations and Clarification Regarding Rates (Order Denying Rehearing) |
RM08-2-000 |
December 21, 2007 |
Pipeline Posting Requirements under Section 23 under Natural Gas Act (NOPR) |
RM08-1-000 |
November 15, 2007 |
Promotion of a More Efficient Capacity Release Market (NOPR) |
Order No. 700 (RM07-17-000) |
October 18, 2007 |
Revisions to Landowner Notification and Blanket Certificate Regulations (Final Rule) |
RM07-9-000 |
September 20, 2007 |
Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines (NOPR) |
Order No. 686-B
(RM06-7-002) |
September 20, 2007 |
Revisions to the Blanket Certificate Regulations and Clarification Regarding Rates (Order on Rehearing) |
Order No. 698
(RM96-1-027) |
June 25, 2007 |
Standards for Business Practices for Interstate Natural Gas Pipelines; Standards for Business Practices for Public Utilities (Final Rule) |
Order No. 686-A
(RM06-7-001) |
June 22, 2007 |
Revisions to the Blanket Certificate Regulations and Clarification Regarding Rates (Order on Rehearing) |
RM07-17 |
June 22, 2007 |
Revisions to Landowner Notification and Blanket Certificate Regulations (NOPR) |
RM07-10-000 |
April 19, 2007 |
Transparency Provisions of Section 23 of the Natural Gas Act; Transparency Provisions of the Energy Policy Act
(NOPR) |
RM07-1-000
|
January 18, 2007 |
Standards of Conduct for Transmission Providers (NOPR) |
Order 678-A
(RM05-23-001 and AD04-11-001) |
November 16, 2006 |
Rate Regulation of Certain Natural Gas Storage Facilities (Order on Clarification and Rehearing) |
RM96-1-027
and RM05-5-001 |
October 25, 2006 |
Standards for Business Practices for Interstate Natural Gas Pipelines
and Public Utilities (NOPR) |
Order
No. 687
(RM06-1-000) |
October 19, 2006 |
Regulations Implementing the Energy Policy Act
of 2005; Coordinating the Processing of Federal
Authorizations for Applications under Sections
3
and 7 of the Natural Gas Act and Maintaining a Complete Consolidated Record (Final
Rule) |
Order
No. 686
(RM06-7-000) |
October 19, 2006 |
Revisions to the Blanket Certificate Regulations and Clarification
Regarding Rates (Final Rule) |
Order
No. 682
(RM06-18-000) |
August 23, 2006 |
Revision of Regulations to Require Reporting
of Damage to Natural Gas Pipeline Facilities (Final Rule) |
Order
No. 678 (RM05-23-000 & AD04-11-000) |
June 19, 2006 |
Rate Regulation of Certain Natural Gas Storage
Facilities (Final Rule) |
RM06-7-000 |
June 16, 2006 |
Revisions to the Blanket Certificate Regulations
and Clarification Regarding Rates (NOPR) |
RM06-1-000 |
May 18, 2006 |
Regulations Implementing the Energy Policy Act
of 2005: Coordinating the Processing of Federal
Authorizations for Applications under Sections
3 and 7 of the Natural Gas Act and Maintaining
a Complete
Consolidated Record (NOPR) |
RM06-14-000 |
February 16, 2006 |
Revisions to Record Retention Requirements for
Unbundled Sale Service, Person Holding Blanket
Marketing
Certificates, and Public Utility Market-Based Rate
Authorization Holders (NOPR) |
Order
No. 673 (RM06-5-000) |
February 16, 2006 |
Amendments to Codes of Conduct for Unbundled
Sales Service and for Persons Holding Blanket
Marketing
Certificates (Final Rule) |
RM05-23-000
and AD04-11-000 |
December 22, 2005 |
Rate Regulation of Certain Underground Storage
Facilities (NOPR) |
Order
No. 2005-A (RM05-1-001) |
June 1, 2005 |
Regulations Governing the Conduct of Open Seasons
for Alaska Natural Gas Transportation Projects
(Order on Rehearing) |
RM05-12-000 |
May 27, 2005 |
Modification of Natural Gas Reporting Regulations (NOPR) |
Order
No. 587-S
(RM96-1-026) |
May 9, 2005 |
Standards for Business Practices
of Interstate Natural Gas Pipelines, as corrected
by errata
notice issued June 14, 2005 (Final Rule) |
Order
No. 2005
(RM05-1-000) |
February 9, 2005 |
Regulations Governing the Conduct
of Open Seasons for Alaska Natural Gas Transportation
Projects |
Order
No. 644 (RM03-10-001) |
May 19, 2004 |
Order on Clarification of Code of
Conduct to Jurisdictional Sellers (Final Rule) |
Order
No. 644 (RM03-10-000) |
November 17, 2003 |
Code of Conduct to Jurisdictional
Sellers (Final Rule) |
Order
No. 637-B
|
July 26, 2000 |
Order Denying Rehearing Concerning
Regulation of Short-Term Natural Gas Transportation
Services (Final Rule) |
Order
No. 637-A |
May 19, 2000 |
Order on Rehearing, Rehearing of
Short-term Natural Gas Transportation Services,
and Regulation of Interstate Natural Gas Transportation
Services (Final Rule) |
Order
No. 637 |
February 9, 1999 |
Regulation of Short-term Natural
Gas Transportation Services, and Regulation of
Interstate
Natural Gas Transportation Services (Final Rule) |
Order
No. 636-C |
November 27, 1992 |
Order Denying Rehearing and Clarifying
Orders 636 and 636-A (Order on Rehearing)
|
Order
No. 636-B |
November 27, 1992 |
Order Denying Rehearing and Clarifying
Orders 636 and 636-A (Order on Rehearing)
|
Order
No. 636-A |
August 3, 1992 |
Denying Rehearing in Part, Granting
Rehearing in Part and Clarifying Order 636 (Order on Rehearing) |
Order
No. 636 |
April 9, 1992 |
Restructuring of Interstate Natural
Gas Pipeline Services (Final Rule) |
Docket
No. |
Date |
Title |
RM07-8-000 |
February 15, 2007 |
Preliminary Permits for Wave, Current, and Instream New Technology Hydropower Projects (Interim Statement of Policy) |
PL06-5-000 |
September 21, 2006 |
Policy statement on hydropower licensing settlements |
Order
No. 655 |
May 27, 2005 |
Modification of Hydropower Procedural Regulations,
Including the Deletion of Certain Outdated or
Non-essential
Regulations (Final Rule) |
Order
No. 2002 |
July 23, 2003 |
Hydroelectric Licensing (Final Rule) |
Order
No. 635 |
July 23, 2003 |
Policy Statement on Consultation
with Indian Tribes in Commission Proceedings (Final
Rule) |
Order
No. 596 [TIF] |
October 29, 1997 |
Alternative Hydropower Licensing
Process (Final Rule) |
Docket
No. |
Date |
Title |
RM05-22-000 |
March 21, 2006 |
Five-Year Review of Oil Pipeline Pricing Index |
Order
No. 656 |
May 27, 2005 |
Revision of FERC Form No. 73, Oil Pipeline Data
Filing Instructions (Final Rule) |
Order
No. 650 |
August 27, 2004 |
Revisions to Oil Pipeline Regulations
Pursuant to the Energy Policy Act of 1992 (Final
Rule) |
Order
No. 634-A |
October 23, 2003 |
Final Rule Regarding Regulation of
Cash Management Practices |
Order
No. 634 |
June 26, 2003 |
Interim Rule Regarding Regulation
of Cash Management Practices |
RM00-11-000 and RM00-11-001 |
February 24, 2003 |
Five-Year Review of Oil Pipeline Pricing Index |
Order
No. 588 |
July 19, 1996 |
Oil Pipeline Cost-of-Service Filing
Requirements (Final Rule) |
Order
No. 572 |
October 28, 1994 |
Market-based Ratemaking for Oil Pipelines
(Final Rule) |
Order
No. 572-A |
December 28, 1994 |
Market-based Ratemaking for Oil Pipelines
(Final Rule) (Order denying rehearing) |
Order
No. 571 |
October 28, 1994 |
Cost-of-Service Filing Requirements
for Oil Pipelines (Final Rule) |
Order
No. 571-A |
October 28, 1994 |
Cost-of-Service Filing Requirements
for Oil Pipelines (Final Rule) |
Order No. 561-A |
July 28, 1994 |
Pipeline Regulations Pursuant to the Energy Policy Act of 1992 (Rehearing) |
Order
No. 561 |
October 22, 1993 |
Pipeline Regulations Pursuant to
the Energy Policy Act of 1992 (Final Rule) |
Order
No. 154-C |
December 5, 1985 |
Order Denying Rehearing in Part,
Modifying Opinion 154-B in Part, Clarifying That
Opinion,
and Denying Stay |
Order
No. 154-B |
June 28, 1985 |
Trended Original Cost Model (TOC) |
|