Skip Navigation Minerals Management Service Minerals Management Service MMS Home pagesSearchMMS Topic IndexAbout MMSWhat’s NewOffshore Energy and Minerals Management United States Department of the Interior
TA&R Home PageTA&R International Home PagesTA&R Oil Spill Research HomeTA&R Research Projects HomeTA&R Workshops HomeTA&R Safety Home
Project Number 464
Date of Summary July 27, 2004
Subject Development of Integrity Methodologies for the Topsides of Offshore Production Facilities
Performing Activity MSL Service Corporation
Principal Investigator Justin Bucknell
Contracting Agency Minerals Management Service
Estimated Completion July 2004
Description The objectives of this study were to develop an engineering methodology for topsides structures, plant and piping integrity management and to integrate the survey/inspection process with existing defect assessment procedures. The work included the collation of pertinent codes, guidance documents, databases and literature worldwide and a number of interviews with the Gulf of Mexico offshore industry. This permitted the identification of regulation and code requirements and industry practice.

Two relevant topsides related studies have been carried out. They are the Belmar study that considered risk factors contributing to fires and explosions and the SAMS study that considered operability aspects. However, little work was found which looked specifically at risk-based inspection or integrity management of topsides facilities.

A review of topsides facilities anomaly reporting showed two main findings. Firstly, many anomalies are attributable to external corrosion that can be detected by visual inspections, although only a small percentage of these led to failures. Secondly, a high proportion of internal corrosion anomalies led to failure. This leads to the conclusion that visual inspection will detect a high proportion of typical anomalies, but that this alone will not eliminate the anomalies that lead to a significant percentage of the reported failures. The report suggested an alternative methodology for an improved topsides inspection regime, which uses a risk-based approach.

The method prioritizes the inspection according to potential risks. This is likely to lead to more inspection of high-risk areas, whilst at the same time reducing inspection from the present requirements where it can be demonstrated that the risk is sufficiently low. The important aspect of the proposed methodology is the utilization of the results of pervious inspections in the risk assessment.

The report also recommended that a workgroup be formed to take forward the findings from the research in order to develop a practical and usable risk-based approach to topsides integrity management and inspections.

Progress Complete
Reports
AA (553 KB) pdf Development of Integrity Methodologies for the Topsides of Offshore Production Facilities, MSL Services Corporation, Houston, Texas, Final Report, July 2004.

 

Privacy | Disclaimers | Accessibility | Topic IndexFOIA

Last Updated: 07/22/2008, 06:28 PM