Project Number | 190 |
Date of Summary | March 31, 1995 |
Subject | Fatigue Strength of Grouted Connections |
Performing Activity | Det Norske Veritas |
Principal Investigator | Dr. Arne Sele |
Contracting Agency | Minerals Management Service |
Estimated Completion | Completed |
Description | This is a Joint Industry Project (JIP). To establish design recommendations using available test information on grouted connections. The calculation of safety factors for static strength of grouted connections is necessary to design safety standards which are uniform and like that of other structural components. It is necessary to establish that the provisions for other failure modes will still be adequate. The aim is to provide a sufficient measure of safety against fatigue failure of grouted connections. |
Progress | Completed |
Reports |
|
AH (5,315 KB; 72 pages) | Factors of Safety for Grouted Connections Phase II the Impact of Cyclic Load on Connections with High H/S Values, Report No. 94- 3243, Veritec, Oslo, Norway, August 4, 1994. |
AI (642 KB; 26 pages) | Factors of Safety for Grouted Connections Phase II, Fatigue Strength of Grouted Connections, Veritec, Oslo, Norway, May, 1992. |
Privacy | Disclaimers | Accessibility | Topic Index | FOIA Last Updated: 09/08/2008, 09:56 AM |