Ownership: 100% Enbridge Offshore (Gas Transmission) L.L.C.
Location: Extends from West Delta Block 143 to interconnects with the Venice Gas Plant and 2 interstate pipelines onshore.
Capacity: 800 million cubic feet of gas per day.
Diameter: 30-inch
Length: 45 miles
Start Up: October 1996
Fields: Transports production gathered from the Mars, Mensa and Ursa Projects in the Mississippi Canyon Area of the Gulf of Mexico Outer Continental Shelf and delivered to Mississippi Canyon Gas Pipeline at West Delta 143 Platform.
|