TECHNOLOGY BASED NUMERICAL LIMITATIONS FOR NUTRIENTS IN PERMITS

Nitrogen and phosphorus discharges throughout the Bay watershed have been shown to impact the water quality in the Bay and its tidal rivers.  As a result, the Commonwealth embarked on a rulemaking process to establish [Regulatory] authority for controlling the discharge of total nitrogen and total phosphorus within the Virginia portion of the Chesapeake Bay watershed.

For the total nitrogen and total phosphorus annual waste load allocations approved by the State Water Control Board for the significant point source dischargers in the Virginia portion of the Chesapeake Bay Watershed, please see the following links:

Numerical limitations for total nitrogen and total phosphorus that are more restrictive than the Board approved numerical limitations included in the nutrient regulations may be needed for some discharges/watersheds, in order to meet the requirement of the Virginia Water Quality Standards or any applicable TMDL.

Action
Schedule
Other Information

VA Rulemaking Process

Timeline for Rulemaking

 
Notice of Intended Regulatory Action

January 26, 2004. A public meeting was held on February 26, 2004 and the public comment period ended on March 12, 2004.

Townhall Agency Background Document

Presentation from Feb. 26, 2004 Public Meeting

Feb. 26 Q&A Summary

Technical Advisory CommitteeTechnical Advisory Committee Meetings were held on May 4, June 15, July 6, and August 3, 2004. The meetings were held at the Piedmont Regional Office located at 4949A Cox Road in Glen Allen, VA.

May 4 Meeting Summary

June 15 Meeting Summary

July 6 Meeting Summary

Policy StatementAugust 27, 2004 by the SNRPolicy Statement
Present Draft Regulations to State Water Control BoardAugust 31, 2004 State Water Control Board Meeting:
  • Approval given to take draft regulations to public hearing and comment.

Presentation on Draft Regulations

Public Comment ProcessNOPC issued February 21, 2005
Comment Period Ended April 25, 2005

Public Hearing Schedule:

  • March 17, 2005: DEQ's Valley Office @ 4411 Early Road, Harrisonburg, VA. 22801.
  • March 21, 2005: DEQ's Piedmont Office @ 4949-A Cox Road, Glen Allen, VA 23060.
  • March 22, 2005: DEQ's Northern Office @ 13901 Crown Court, Woodbridge, VA 22193.
  • March 23, 2005: DEQ's Tidewater Office @ 5636 Southern Blvd., Virginia Beach, VA 23462.

Virginia Townhall Document

Presentation from Public Hearings on the Draft Regulations

Summary of Public Comments and Agency Responses

Present Final Regulations to State Water Control Board

June 28, 2005 State Water Control Board Mtg:

  • Concurred with staff recommendation for adoption and to also suspend the effective date to allow an additional 30 day public comment period.
  • Revisions to the Draft Regulations (as concurred by the SWCB on 6/28) are available by contacting DEQ Staff.
  • Public Meeting on the Revised Regulations Scheduled for 10 AM on Aug. 11, 2005: DEQ's Piedmont Office @ 4949-A Cox Road, Glen Allen, VA 23060.
  • Sept. 26, 2005 State Water Control Board Mtg: Concurred with staff recommendation for adoption of the WQMP Regulation and nutrient allocations in the Shen-Potomac basin, Rappahannock basin, and Eastern Shore.
  • Nov. 21, 2005 Special Mtg of the State Water Control Board held (General Assembly Building, House Room D) to hear staff presentations for the York and James River Basins regarding nutrient waste load allocations and standards proposed for Chlorophyll A and dissolved oygen. 

Presentation on Final Regulations

Virginia TownHall Document

Notice to Reopen Public Comment

Virginia Townhall Document

Virginia Townhall Document

Nov. 2005 Summary of Public Comments and Agency Response

Other information and/or links which may be of interest are as follows.

Templ:DEQTemplate_one | Editable:false | StartFldr:/bay/ | CurrentFilename:multi.html;