9. LIST OF ATTACHMENTS
(Attachments A and B to be completed by the engineer.
Attachment C to be completed by the manufacturer.)
Attachment A, Pole Framing Drawings Attachment B, Application Requirements Attachment C, Bid Summary (PDF file)
Attachment A, Pole Framing Drawings
Attachment B, Application Requirements
Attachment C, Bid Summary (PDF file)