9. LIST OF ATTACHMENTS

(Attachments A and B to be completed by the engineer.

Attachment C to be completed by the manufacturer.)

Attachment A, Pole Framing Drawings

Attachment B, Application Requirements

Attachment C, Bid Summary (PDF file)