APPENDIX B

EXAMPLE POLE FRAMING DRAWINGS

EXAMPLE OF APPLICATION REQUIREMENTS

 

Drawing TPC-115 (PDF file)

Drawing TPFC-115 (PDF file)

Drawing TM-C3 (PDF file)

 

APPLICATION REQUIREMENTS

 

 

For appurtenance material supplied by the owner, owner shall provide manufacturer, connector and/or member locations, orientations, sizes, types, and strength capacities with this Attachment.

1.Climbing device desired by owner STEP BOLTS

2.Delivery schedule JAN. 15, 2000

3.Free on board destination (F.O.B.) LEE'S LANDING, FL LAYDOWN AREA NEAR PEJMAN SUBSTATION

4.Additional requirements