Minerals Management Service (MMS) Home Page Minerals Management Service (MMS) Home Page Search MMS Topic Index About the Minerals Management Service (MMS) What's New U.S. Department of the Interior (DOI)

Offshore Energy & Minerals Management (OEMM)

Alaska OCS Region Atlantic OCS Area Gulf of Mexico OCS Region Pacific OCS Region

Program Overview
Projects

Fact Sheets
Information Center
Regulations and Policy
Stakeholder Working Groups
Calendar of Events
In the News
Education

Alternative Energy Program
5-Year OCS Leasing Program
Virginia Lease Sale 220
Leasing Moratorium Information
Past 5-Year Programs
Coastal Impact Assistance Program
Public Comment System
Jobs

USA.gov logo: The U.S. government’s official web portal.


Content:
   
Rodney Cluck

Pagemasters:
OEMM Web Team

Photograph of offshore inspectors.Photograph of a seabird.Photograph of an ice island.Photograph of a fish.Photograph of a platform at sunset.Photograph of fish feeding beneath a platform.Photograph of a welder working on an offshore platform.
  Alternative Energy Programs
 

 

bullet

Cape Wind Final Environmental Impact Statement (1/16/2008)

Cape Wind Associates, LLC, has proposed to construct a wind park on Horseshoe Shoals in Nantucket Sound, approximately 4.7 miles offshore Massachusetts. The wind facility would consist of 130 3.6 megawatt wind turbine generators covering 24 square miles in Federal waters. With an expected capacity to produce about 468 megawatts, the average anticipated production from the proposed wind facility could provide approximately 75 percent of the electricity demand for Cape Cod and the Islands of Martha’s Vineyard and Nantucket. On January 16, 2008 the MMS announced the release of the Final Environmental Impact Statement (FEIS) for the Cape Wind Energy Project. The FEIS assesses the physical, biological and social/human impacts of the proposed project and all reasonable alternatives, including a no-action alternative (i.e., the project is not built), and proposed mitigation. The objective analysis is conducted to determine if the proposal is environmentally sound.

Projects: Cape Wind Energy Project

Photo of a wind farm offshore Sweden.The MMS has received a request from Cape Wind Associates, LLC (CWA) for a lease, easement or right-of-way to construct and operate a wind park located in Federal waters 4.7 miles offshore Cape Cod, Massachusetts. Landfall for the transmission cable would be in Barnstable County.

The proposal consists of 130, 3.6 megawatt wind turbine generators covering 24 square miles in Federal waters of Nantucket Sound off Massachusetts with the capacity to produce about 468 megawatts. The average expected production from the proposed wind farm could provide about 75 percent of the electricity demand for Cape Cod and the Islands of Martha’s Vineyard and Nantucket. At average expected production, Cape Wind could produce enough energy to power more than 200,000 homes in Massachusetts.

bullet Notice of Availability of the Final Environmental Impact Statement (FEIS)  (54 KB)
 
bullet Notice of Extension of Public Comment Period (49 KB)
 
bullet Notice of Availability of the Draft Environmental Impact Statement (DEIS) and Public Hearings (53 KB)
 
bullet Notice of Intent to Prepare an Environmental Impact Statement (85 KB)

Note: Federal Register notices are all in Adobe's Portable Document Format (PDF)  Portable Document Format (PDF) file.

bullet Cape Wind Final Environmental Impact Statement (FEIS)
 
bullet Cape Wind Biological Assessment (10318 KB)
 
bullet Cooperating Agency/Responsibilities (17 KB)
 
bullet Summary of Scoping Comments (175 KB)
 
bullet Cape Wind Draft Environmental Impact Statement (DEIS)
 
bullet Cape Wind Public Hearing Transcript - March 10, 2008 (1020.75 KB)
 
bullet Cape Wind Public Hearing Transcript - March 11, 2008 (689.54 KB)
 
bullet Cape Wind Public Hearing Transcript - March 12, 2008 (777.41 KB)
 
bullet Cape Wind Public Hearing Transcript - March 13, 2008 (948.90 KB)

Note: NEPA documentations are all in Portable Document Format Portable Document Format (PDF) file.

bullet Final Copy of U.S. Coast Guard RADAR Study Findings and Mitigation
 
bullet Section 106 Finding of Adverse Effect Portable Document Format (PDF) file (18 MB)
 
bullet Clean Air Act Draft General Conformity Determination
 
bullet Summary of Plan Materials Portable Document Format (PDF) file (9088 KB)
 
bullet Reports provided by Cape Wind Associates, LLC

Privacy | Disclaimers | Accessibility | Topic IndexFOIA |


Last Updated: 01/26/2009 03:15:02 PM

Top of Page