The following presentation was delivered at NLM on Monday, July 26, 2004.
The briefing is designed to provide an overview of the Scheduler system
currently in use at NLM to distribute the workload of our Semantic Knowledge
Representation (SKR) Batch facility. By selecting the
"Slide 1: Start" link, you can then proceed in a
slide show format. If you would instead prefer just the text from the slides,
please select the "Text Version" link below.
Downloads and Alternative Views: